US$579.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40593-2021: Guidelines for parameters measurement and modeling of synchronous generator governing system Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 40593-2021 | English | 579 |
Add to Cart
|
5 days [Need to translate]
|
Guidelines for parameters measurement and modeling of synchronous generator governing system
| Valid |
GB/T 40593-2021
|
PDF similar to GB/T 40593-2021
Basic data Standard ID | GB/T 40593-2021 (GB/T40593-2021) | Description (Translated English) | Guidelines for parameters measurement and modeling of synchronous generator governing system | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F21 | Word Count Estimation | 29,257 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 40593-2021: Guidelines for parameters measurement and modeling of synchronous generator governing system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guidelines for parameters measurement and modeling of synchronous generator governing system
ICS 29.020
CCSF21
National Standards of People's Republic of China
Parameter Measurement and Modeling Guide of Synchronous Generator Speed Regulation System
Released on 2021-10-11
2022-05-01 implementation
State Administration of Market Supervision and Administration
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 2
5 Test condition 2
6 Speed control system model 3
7 Parameter measurement and identification 10
8 Simulation verification 13
9 Model parameter confirmation and stability check 13
Appendix A (Informative) Parameter Collection 14
Appendix B (Informative) Common Model 18
Appendix C (Informative) Signal Acquisition 25
References 26
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446).
Drafting organizations of this document. China Electric Power Research Institute Co., Ltd., National Electric Power Dispatching Control Center of State Grid Corporation of China,
China Southern Power Grid Electric Power Dispatching Control Center, Southern Power Grid Research Institute Co., Ltd., State Grid Jibei Electric Power Co., Ltd., State Grid Shaanxi
Western Electric Power Company, State Grid Chongqing Electric Power Company, State Grid Zhejiang Electric Power Co., Ltd., State Grid Shandong Electric Power Company, Yunnan Power Grid Co., Ltd.
Ren company, Guangdong Power Grid Co., Ltd.
The main drafters of this document. Chen Guoping, Tao Xiangyu, Yu Dahai, Wang Guanhong, Chen Gang, Li Wenfeng, He Fengjun, Liu Hongtao, Wan Tianhu,
Han Zhiyong, He Changsheng, Liu Haitao, Zhang Chunlei, Zhang Jianyun, Huang Wei, Huang Xing, Jia Bin, Guo Qiang, Wu Shuangxi, Sun Huadong, Ai Dongping, An Ning, Wang Liang,
Ma Shijun, Zhang Junfeng, Xia Chao, Wang Wei, Xiao Yang, Chen Tao, Wei Wei, Liu Yuming, Ma Xiaoguang, Du Yang, Xu Dechao, Wang Chao, Chen Xujiang, Jin Yiding,
Zhu Yiying, Ye Jian, Yu Rui, Ye Lin, Liu Baisi, Yu Zhiqiang, Liu Zhaorui, Dang Jie, Liu Huizhen, Xu Youping, Xu Zhenhua, Guo Qiang, Gu Zhenghao, Li Yanghai,
Xu Ke, Xu Jiaofeng, Xu Tianning, Zhang Zuxin, Zhang Peng, Liu Tao, Liang Yu, Huo Chengxiang, Guo Hui, Wu Chaoqiang, Ding Zhenyu, Zhang Xing, Zhang Mujie, Wang Feng,
Zhang Yudong, Wang Maoqing.
Parameter Measurement and Modeling Guide of Synchronous Generator Speed Regulation System
1 Scope
This document specifies the synchronous generator speed control system model, parameter measurement and identification, simulation verification and simulation for power system stability analysis and calculation.
Type parameter confirmation and stability check requirements.
This document applies to steam turbine generator units (thermal power units, nuclear power units, solar thermal units, etc.), hydro-turbine generator units (including pumped storage units)
And gas generator set (including gas-steam combined cycle unit) speed control system parameter measurement and modeling, other types of synchronous generator speed control system
The system is implemented by reference.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 9652.1 Technical conditions of hydraulic turbine governing system
GB/T 14100 Gas Turbine Acceptance Test
GB 38755 Safety and Stability Guidelines for Power Systems
GB/T 40594 Technical Guidelines for Power System Network Source Coordination
GB/T 40595 Grid-connected power supply primary frequency modulation technical regulations and test guidelines
DL/T 824 Guidelines for Performance Acceptance of Steam Turbine Electro-hydraulic Control System
DL/T 1235-2019 Synchronous generator prime mover and its regulation system parameter measurement and modeling guide
DL/T 2191 Technical specification for network performance simulation test of hydraulic turbine governor
DL/T 2194 Technical requirements and test guidelines for primary frequency regulation of hydroelectric generating units
3 Terms and definitions
The following terms and definitions defined in DL/T 1235-2019 apply to this document.
3.1
Governingsystem
A device that controls the speed and output power of a synchronous generator to maintain the normal operation of the unit.
Note. Including control system, actuator, prime mover and energy supply system, etc.
3.2
Controlsystem
In order to control key parameters such as frequency/power, the control components and equipment provided.
3.3
Actuator
Accept the instructions of the prime mover's digital adjustment system to control valves, guide vanes (paddles) and other electrical/mechanical-hydraulic system devices.
[Source. DL/T 1235-2019, 3.2]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40593-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40593-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 40593-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40593-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|