HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 39627-2020 English PDF

US$229.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 39627-2020: Technical specification of intelligent measurement and control devices for smart hydropower plant
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 39627-2020English229 Add to Cart 3 days [Need to translate] Technical specification of intelligent measurement and control devices for smart hydropower plant Valid GB/T 39627-2020

PDF similar to GB/T 39627-2020


Standard similar to GB/T 39627-2020

GB/T 35071   GB/T 35073   GB/T 40235   GB/T 40234   

Basic data

Standard ID GB/T 39627-2020 (GB/T39627-2020)
Description (Translated English) Technical specification of intelligent measurement and control devices for smart hydropower plant
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F07
Classification of International Standard 27.100
Word Count Estimation 12,160
Date of Issue 2020-12-14
Date of Implementation 2021-07-01
Quoted Standard GB/T 191; GB /T 4208-2017; GB/T 11287-2000; GB/T 13729-2019; GB/T 14537-1993; GB /T 14598.27; GB/T 15153.1; GB/T 15969.3; GB/T 17626.2; GB/T 17626.3; GB/T 17626.4; GB/T 17626.5; GB/T 17626.6; GB/T 17626.8; GB/T 17626.10; GB/T 17626.12; GB/T 28570; GB/T 32
Regulation (derived from) National Standard Announcement No. 28 of 2020
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration
Summary This standard specifies the basic requirements, functional requirements, performance requirements, testing and inspection, marking, packaging, transportation and storage of intelligent measurement and control devices for smart hydropower plants (hereinafter referred to as "devices"). This standard applies to smart hydropower plants.

GB/T 39627-2020: Technical specification of intelligent measurement and control devices for smart hydropower plant


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Technical specification for intelligent measurement and control device of intelligent hydropower plant) ICS 27:100 F07 National Standards of People's Republic of China Technical specification for intelligent measurement and control device of intelligent hydropower plant hydropowerplant 2020-12-14 release 2021-07-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Preface Ⅲ 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 2 4 Conditions of use 3 5 Basic requirements 3 6 Functional requirements 4 7 Performance requirements 6 8 Test and inspection 7 9 Marking, packaging, transportation and storage 8

Foreword

This standard was drafted in accordance with the rules given in GB/T 1:1-2009: Please note that certain contents of this document may involve patents: The issuing agency of this document is not responsible for identifying these patents: This standard was proposed and managed by the China Electricity Council: Drafting organizations of this standard: NARI Group Co:, Ltd:, Guodian NARI Technology Co:, Ltd:, State Grid Xinyuan Holdings Co:, Ltd:, China Jiang Three Gorges Group Company, China Southern Power Grid Peak and Frequency Modulation Power Generation Co:, Ltd:, Wuling Power Co:, Ltd:, Guangxi Guiguan Power Co:, Ltd:, China National Institute of Water Resources and Hydropower Research, Yalong River Basin Hydropower Development Co:, Ltd:, China Huadian Group Co:, Ltd:, Guangzhou Jianxin Technology Co:, Ltd: Limited company: The main drafters of this standard: Xu Jie, Xu Fangming, Yi Chuanbao, Sun Gang, Wang Pengyu, Xu Qing, Cai Weijiang, Yang Lin, Rong Gang, Wang Yuting, Wang Yongtan, Gong Yu, Tan Wensheng, Ma Tengyu, Wu Peizhi, Lu Tao, Li Dehua, Zeng Jianjun, Yan Xinrong, Rui Jun, Xiang Dezhi, Kong Fancheng, Wen Zhengguo, Zhang Liang, Sun Yanling, Zhao Yong, Liu Yong: Technical specification for intelligent measurement and control device of intelligent hydropower plant

1 Scope

This standard specifies the basic requirements, functional requirements, performance requirements, and tests of intelligent measurement and control devices for smart hydropower plants (hereinafter referred to as "devices") And inspection, marking, packaging, transportation and storage: This standard applies to smart hydropower plants:

2 Normative references

The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article Pieces: For undated references, the latest version (including all amendments) applies to this document: GB/T 191 Packaging, Storage and Transportation Graphic Mark GB/T 4208-2017 Enclosure protection grade (IP code) GB/T 11287-2000 Electrical Relay Part 21: Measuring the vibration, shock, collision and earthquake of relays and protection devices Test Part 1: Vibration Test (Sine) GB/T 13729-2019 Telecontrol terminal equipment GB/T 14537-1993 Impact and collision test for measuring relays and protection devices GB/T 14598:27 Measuring Relays and Protection Devices Part 27: Product Safety Requirements GB/T 15153:1 Telecontrol equipment and system Part 2: Working conditions Part 1: Power supply and electromagnetic compatibility GB/T 15969:3 Programmable Controller Part 3: Programming Language GB/T 17626:2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test GB/T 17626:3 Electromagnetic compatibility test and measurement technology Radio frequency electromagnetic field radiation immunity test GB/T 17626:4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test GB/T 17626:5 Electromagnetic compatibility test and measurement technology surge (impact) immunity test GB/T 17626:6 Electromagnetic compatibility test and measurement technology Radio frequency field induced conducted disturbance immunity GB/T 17626:8 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test GB/T 17626:10 Electromagnetic compatibility test and measurement technology Damped oscillation magnetic field immunity test GB/T 17626:12 Electromagnetic compatibility test and measurement technology Ring wave immunity test GB/T 28570 Technical Guidelines for On-line Monitoring System of Hydrogenerator Unit State GB/T 32584 Evaluation of Mechanical Vibration of Hydropower Plants and Energy Storage Pumping Stations DL/T 282 Technical Conditions of Merging Unit DL/T 489 Test Regulations for Static Rectifier Excitation System of Large and Medium Hydrogenerator DL/T 496 Hydro-turbine electro-hydraulic control system and device adjustment test guide DL/T 556 Guidelines for the installation of vibration monitoring devices for hydraulic turbine generator sets DL/T 563 Technical specification for hydraulic turbine electro-hydraulic regulating system and device DL/T 578 Basic technical conditions of computer monitoring system for hydropower plants DL/T 583 Technical conditions of static rectification excitation system for large and medium-sized hydro-generators DL/T 860:6 Electric power enterprise automation communication network and system Part 6: In-substation communication related to intelligent electronic equipment Configuration description language

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 39627-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 39627-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 39627-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 39627-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information