Path: Home > GB/T > Page271 > GB/T 38435-2019 Home > Standard_List > GB/T > Page271 > GB/T 38435-2019
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 38435-2019 | English | 519 |
Add to Cart
|
5 days [Need to translate]
|
Specification for protection configuration and setting for transmission line of electrified railway traction station
| Valid |
GB/T 38435-2019
|
PDF similar to GB/T 38435-2019
Basic data | Standard ID | GB/T 38435-2019 (GB/T38435-2019) | | Description (Translated English) | Specification for protection configuration and setting for transmission line of electrified railway traction station | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K45 | | Classification of International Standard | 29.240 | | Word Count Estimation | 26,228 | | Date of Issue | 2019-12-31 | | Date of Implementation | 2020-07-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 38435-2019: Specification for protection configuration and setting for transmission line of electrified railway traction station ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification for protection configuration and setting for transmission line of electrified railway traction station
ICS 29.240
K45
National Standards of People's Republic of China
Traction station power line
Relay protection configuration and setting calculation principles
2019-12-31 release
2020-07-01 implementation
State Administration of Market Supervision
Published by the National Standardization Administration
Contents
Foreword I
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General 2
5 Configuration Principles of Relay Protection for Traction Station Power Lines 2
6 Setting Principles of Relay Protection for Traction Station Power Lines 3
Appendix A (Informative) Example 12
Appendix B (informative) Typical main wiring of a towing station 13
Appendix C (informative) Typical traction transformer types 17
Appendix D (Informative) Two-phase transmission line parameters 19
Appendix E (informative) Calculation of traction transformer failure 20
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed and managed by the China Electricity Enterprise Federation.
Please note that some elements of this document may involve patents. The issuer of this document is not responsible for identifying these patents.
This standard was drafted. China Southern Power Grid Power Dispatching Control Center, State Grid Power Dispatching Control Center, State Grid Northwest Power Dispatching
Control Sub-center, State Grid North China Power Regulation Sub-center, State Grid Jiangsu Power Dispatching Control Center, State Grid Jiangxi Power Dispatching Control Center, Hebei Electric Power
Power Dispatching Control Center, Gansu Provincial Electric Power Company Dispatching Control Center, Yunnan Power Grid Co., Ltd. Zhaotong Power Supply Bureau, Guangzhou Power Supply Bureau Limited
Company, Guangdong Power Grid Co., Ltd. Foshan Power Supply Bureau, Huazhong University of Science and Technology, Southwest Jiaotong University, Beijing Jiaotong University, Nanjing Nanrui Jibao
Electric Co., Ltd., Beijing Sifang Jibao Automation Co., Ltd., Changyuan Shenrui Jibao Automation Co., Ltd., Guodian Nanjing Automation Co., Ltd.
Co., Ltd., Xu Ji Electric Co., Ltd.
The main drafters of this standard. Chen Zhaohui, Qiu Jian, Ding Xiaobing, Zhang Zhi, Yu Rongqiang, Zhang Jianjian, Zheng Shaoming, Wang Ping, Li Zhihong, Chang Fengran,
Chen Xin, Cao Jie, Wang Yueqiang, Li Yinhong, Han Zhengqing, Ni Pinghao, Dai Guangwu, Hong Liqiang, Du Zhaoqiang, Zheng Bingbing, Xue Mingjun, Li Wenzheng.
Traction station power line
Relay protection configuration and setting calculation principles
1 Scope
This standard specifies the basic principles, methods and requirements for the configuration and setting calculation of relay protection for the power supply lines of traction stations.
This standard is applicable to the power supply lines of traction stations for newly-built electrified railways of 110kV and above voltage levels
Consider three-phase or two-phase power. 110kV and above voltage grade power grid reconstruction, expansion of the traction station power supply line of electrified railway can be consulted
Follow the instructions.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 2900.49 Electrician term power system protection
GB/T 14285 Technical regulations for relay protection and safety automatic devices
GB/T 15145 General technical requirements for transmission line protection devices
GB/T 18038 General technical requirements for microcomputer protection devices for traction power supply systems of electrified railways
GB/T 20840.2 Transformers Part 2. Supplementary technical requirements for current transformers
GB/T 31464 Grid Operation Guidelines
GB/T 50262 Standard for Basic Terms of Railway Engineering
DL/T 478 General technical requirements for relay protection and safety automatic devices
DL/T 559 220kV ~ 750kV Power Grid Relay Protection Device Operation Setting Regulations
DL/T 584 3kV ~ 110kV Power Grid Relay Protection Device Operation Setting Regulations
DL/T 866 Current transformer and voltage transformer selection and calculation rules
3 terms and definitions
GB/T 2900.49, GB/T 14285, GB/T 50262 and the following terms and definitions apply to this document.
3.1
Tractionpowersupplysystem
Power supply system composed of traction substation, traction network and other auxiliary power supply facilities.
3.2
Traction substation
Substations that mainly supply traction systems.
3.3
Transmissionlineofelectrifiedrailwaytractionstation
110kV and above transmission lines that lead from the power grid to the traction substation and supply the traction power supply system.
Price & DeliveryUS$519.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38435-2019: Specification for protection configuration and setting for transmission line of electrified railway traction station Status: Valid
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38435-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 38435-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 38435-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38435-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|