|
US$599.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37134-2018: Guide for ancillary service of grid connected power plants Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 37134-2018 | English | 599 |
Add to Cart
|
5 days [Need to translate]
|
Guide for ancillary service of grid connected power plants
| Valid |
GB/T 37134-2018
|
PDF similar to GB/T 37134-2018
Basic data | Standard ID | GB/T 37134-2018 (GB/T37134-2018) | | Description (Translated English) | Guide for ancillary service of grid connected power plants | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F20 | | Classification of International Standard | 29.020 | | Word Count Estimation | 30,352 | | Date of Issue | 2018-12-28 | | Date of Implementation | 2019-07-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 37134-2018: Guide for ancillary service of grid connected power plants---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide for ancillary service of grid connected power plants
ICS 29.020
F20
National Standards of People's Republic of China
Guidelines for auxiliary services for grid-connected power plants
Published on.2018-12-28
2019-07-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General 2
5 auxiliary services 2
6 provided and called 5
7 data measurement 6
8 Basic auxiliary service assessment 6
9 Paid auxiliary service assessment principles and requirements 7
10 Paid Supplementary Service Compensation Principles and Requirements 9
11 settlement 10
12 Disclosure and Access to Information 11
Appendix A (informative appendix) Calculation and assessment of primary FM integrated indicators 12
Appendix B (informative) Operating conditions for genset reactive power regulation time 15
Appendix C (informative) Calculation method for peak load contribution rate of generator sets 16
Appendix D (informative) AVC performance indicators 19
Appendix E (informative appendix) AGC performance index calculation and compensation assessment metrics 22
Reference 25
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the National Energy Administration.
This standard is under the jurisdiction of the National Electricity Regulatory Standardization Technical Committee (SAC/TC296).
This standard was drafted. North China Energy Regulatory Bureau, North China Power Grid Co., Ltd., North China Electric Power Research Institute Co., Ltd., Tsinghua University
Xueyuan, State Grid North Power Co., Ltd., State Grid Xinyuan Holdings Co., Ltd. Beijing Shisanling Storage Power Plant.
The main drafters of this standard. Shi Peiran, Xie Xu, Kang Jingqiu, Jiang Changming, Cui Zhengyi, Chen Dayu, Lu Feng, Liu Jun, Xie Liang, Chen Zhizhen, Lei Yu,
Luliang Junchao, Zhao Wei, Liu Hui, Shi Yang, Qi Jialin, Zhang He, Wu Bing, Cui Da, Xu Ying, Su Feng, Guo Lei, Liang Chuanwei, Qiu Xiaozhi, Chen Qixin, Chen Xiaofeng,
Yang Zhanliang, Liu Jingbo.
Guidelines for auxiliary services for grid-connected power plants
1 Scope
This standard stipulates the basic technical requirements and foundations for the provision, call, measurement, assessment and compensation of auxiliary services for grid-connected power plants.
This principle.
This standard is applicable to grid-connected power plants (including self-supplied power plants) participating in power grid operation, and provincial and above power dispatching agencies.
The power dispatching agencies below the provincial level can refer to the implementation.
This standard does not apply to the electricity spot market and the power auxiliary service market.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 7064 hidden pole synchronous generator technical requirements
Basic technical conditions of GB/T 7894 hydro-generator
GB/T 19963 Wind farm access to power system technical regulations
GB/T 19964 Photovoltaic power station access to power system technical regulations
GB/T 30370 Thermal power generation unit primary frequency test and performance acceptance guidelines
GB/T 31464 grid operation guidelines
HAF103 Nuclear Power Plant Operation Safety Regulations
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Power system powersystem
Power generation, power supply (transmission, substation, distribution), electrical facilities, and relay protection and safety automatic devices required to ensure their normal operation,
The unified whole of the secondary facilities such as metering device, dispatching automation, and power communication.
3.2
Grid power plant gridconnectedpowerplant
Incorporate into the power of the grid (burning coal, fuel, gas and biomass), hydraulic, nuclear, wind, solar, ocean energy, energy storage, etc.
Power plant (field, station).
3.3
Genset generatorset
Convert other forms of energy (such as coal, fuel, gas, water, nuclear, wind, solar, biomass, ocean energy, etc.) into electrical energy
Complete power generation equipment.
3.4
Electric energy storage facility electricstoragefacility
A facility that stores electrical energy by chemical or physical means and releases it in the form of electrical energy when needed.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37134-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 37134-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 37134-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37134-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|