Path:
Home >
GB/T >
Page536 > GB/T 37016-2018
Home >
Standard_List >
GB/T >
Page536 > GB/T 37016-2018
US$359.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 37016-2018: Technical requirements of measurement and verification about power saving in demand response for power users
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 37016-2018 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
Technical requirements of measurement and verification about power saving in demand response for power users
| Valid |
GB/T 37016-2018
|
PDF similar to GB/T 37016-2018
Basic data
| Standard ID | GB/T 37016-2018 (GB/T37016-2018) |
| Description (Translated English) | Technical requirements of measurement and verification about power saving in demand response for power users |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | F20 |
| Classification of International Standard | 29.020 |
| Word Count Estimation | 18,140 |
| Date of Issue | 2018-12-28 |
| Date of Implementation | 2019-07-01 |
| Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 37016-2018: Technical requirements of measurement and verification about power saving in demand response for power users
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements of measurement and verification about power saving in requirements response for power users
ICS 29.020
F20
National Standards of People's Republic of China
Power user demand response saving power measurement and verification
skills requirement
Published on.2018-12-28
2019-07-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Measurement and verification process 1
5 Measurement and verification algorithm 2
6 Measurement and verification requirements 3
7 Measurement and verification methods 3
Appendix A (informative) Date Matching Method for Saving Power Calculation Process 5
Appendix B (informative) Regression analysis method to save electricity calculation process 7
Appendix C (informative) Typical User Measurement and Verification Case (Commercial User) 11
Reference 15
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents.
This standard was proposed by the China Electricity Council.
This standard is under the jurisdiction of the National Smart Grid User Interface Standardization Technical Committee (SAC/TC549).
This standard is mainly drafted by. China Electric Power Research Institute Co., Ltd., State Grid Co., Ltd., China Electrical Engineering Society, National
Development and Reform Commission, Southeast University, North China Electric Power University, China Southern Power Grid Co., Ltd., State Grid Shanghai Electric Power Company, State Grid
Jiangsu Electric Power Co., Ltd., State Grid Weibei Electric Power Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Hebei Electric Power Co., Ltd.
Network Shandong Electric Power Company, State Grid Xinjiang Electric Power Co., Ltd., State Grid Tianjin Electric Power Company, State Grid Tianjin Electric Power Company
Institute, State Grid Anhui Electric Power Co., Ltd., Yantai Oriental Weston Electric Co., Ltd.
The main drafters of this standard. Chen Songsong, He Sheng, Yan Huaguang, Zhao Jianjun, Gao Ciwei, Li Dezhi, Sun Dinghao, Zhang Jing, Qi Bing, Wang Hailong,
Zhao Jianshe, Zhang Xinghua, Duan Weiguo, Zhang Mingming, Yang Bin, Wang Xin, Sun Beibei, Zhong Ming, Jiang Limin, Liu Qiang, Zhang Kai, Zhu Weiyi, Zhang Haijing, Ma Lei,
Zhang Jian, Wang Xudong, Zhang Yiwei, Zuo Songlin, Liu Zhong, Zhang Chao, Wang Diantao.
Power user demand response saving power measurement and verification
skills requirement
1 Scope
This standard specifies the procedures, algorithms, requirements and methods for power user demand response to save power measurement and verification.
This standard applies to the measurement and verification of power saving in demand response projects.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 32672-2016 General technical specifications for power demand response systems
3 Terms and definitions
The following terms and definitions as defined in GB/T 32672-2016 apply to this document. For ease of use, the following is repeated
Some terms and definitions in GB/T 32672-2016.
3.1
Demand response demandresponse;DR
Power users respond to price signals or incentives issued by implementing agencies and change a participatory behavior of power consumption patterns.
3.2
Demand response period demandresponseperiod
The power user participates in adjusting the time period of the power load according to the demand response event requirement.
3.3
Demand response day demandresponseday
Power users respond to incident requests and change the day of power consumption behavior.
3.4
User baseline load user'sbaselineload
When the user does not implement the demand response during the demand response period, the calculated load curve is calculated according to a certain period of time.
3.5
Energy saving
The value obtained by using the user's baseline load average and the user's measured load average of the demand response period; if the difference is negative, then the section
The power is about "zero."
3.6
Day type daytype
Determine the type of a date, including workdays and non-working days, according to statutory arrangements.
4 Measurement and verification process
The process of demand response saving power measurement and verification is as follows.
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB/T 37016-2018_English be delivered?
Answer: Upon your order, we will start to translate GB/T 37016-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB/T 37016-2018_English with my colleagues?
Answer: Yes. The purchased PDF of GB/T 37016-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to
[email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.