|
US$199.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36417.2-2018: Full-distributed industrial control network -- Part 2: Terminology Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 36417.2-2018 | English | 199 |
Add to Cart
|
3 days [Need to translate]
|
Full-distributed industrial control network -- Part 2: Terminology
| Valid |
GB/T 36417.2-2018
|
PDF similar to GB/T 36417.2-2018
Basic data | Standard ID | GB/T 36417.2-2018 (GB/T36417.2-2018) | | Description (Translated English) | Full-distributed industrial control network -- Part 2: Terminology | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N10 | | Classification of International Standard | 25.040 | | Word Count Estimation | 10,134 | | Date of Issue | 2018-06-07 | | Date of Implementation | 2019-01-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 36417.2-2018: Full-distributed industrial control network -- Part 2: Terminology---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Full-distributed industrial control network--Part 2. Terminology
ICS 25.040
N10
National Standards of People's Republic of China
Fully distributed industrial control network Part 2. Terminology
Ful-distributedindustrialcontrolnetwork-Part 2.Terminology
Published on.2018-06-07
2019-01-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
1 Scope 1
2 Terms and Definitions 1
Reference 3
Index 4
Foreword
GB/T 36417 "Full Distributed Industrial Control Network" is divided into four parts.
--- Part 1. General;
--- Part 2. Terminology;
--- Part 3. General requirements for interfaces;
--- Part 4. Heterogeneous network technical specifications.
This part is the second part of GB/T 36417.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part was proposed by the China Machinery Industry Federation.
This part is under the jurisdiction of the National Industrial Process Measurement Control and Automation Standardization Technical Committee (SAC/TC124).
This section was drafted by. Shenyang Institute of Automation, Chinese Academy of Sciences, Institute of Mechanical Industry Instrumentation and Comprehensive Technology and Economics, Zhongcheqing
Island Sifang Locomotive & Rolling Stock Co., Ltd., Shenyang Institute of Automation, Guangzhou Chinese Academy of Sciences, Rockwell Automation (China) Co., Ltd.
Division, Shenzhen Wanxun Automation Co., Ltd., China Power Engineering Consulting Group Southwest Electric Power Design Institute Co., Ltd., Northeastern University, Dongfeng Design
Research Institute Co., Ltd., Chongqing University of Posts and Telecommunications, China Engineering Physics Research Institute, and Phoenix Contact (Nanjing) R&D Engineering Center
Company, Siemens (China) Co., Ltd., Shanghai Automation Instrument Co., Ltd., Schneider Electric (China) Co., Ltd., Yunnan Yundian Tongfang Branch
Technology Co., Ltd., China Telecom Co., Ltd. Shanghai Research Institute, Shaanxi Blower (Group) Co., Ltd., Dongguan Sigu Mathematical Technology Co., Ltd.
Company, Shanghai Douwen Computer System Integration Engineering Co., Ltd., China Aviation Industry Corporation Beijing Aviation Precision Machinery Research Institute, Bega
Lai Industrial Automation (China) Co., Ltd.
The main drafters of this section. Yu Haibin, Zeng Peng, Liu Yang, Li Dong, Zhang Tianshi, Liu Xiaojing, Li Yongni, Yuan Mingzhe, Hua Wei, Cheng Jixun, Zhang Jinbin,
Yao Hongliang, You Heping, Huang Qingqing, Wei Wei, Li Yun, Zhang Long, Xu Bin, Zhang Qingjun, Wang Yong, Zhang Yulong, Deng Anming, Wang Yi, Chang Jie, Xiao Jinchao, Lu Jianqiang,
Wang Yuhui, Lou Zhibin, Zhou Caichi, Li Jing, Wang Jinqiu.
Fully distributed industrial control network Part 2. Terminology
1 Scope
This part of GB/T 36417 defines the terms and definitions of a fully distributed industrial control network.
This section applies to the production, scientific research and other related technical fields of fully distributed industrial control networks.
2 Terms and definitions
2.1
Network
An arrangement for entities and their interconnections.
[GB/T 5271.18-2008, definition 18.01.01]
2.2
Node node
In the network, connect it to entities of one or more other entities.
[GB/T 5271.18-2008, definition 18.01.02]
2.3
Network topology
A schematic arrangement of branches and nodes in the network.
[GB/T 5271.18-2008, definition 18.01.04]
2.4
Channel channel
Connect an end-to-end transport path for any two application-specific devices.
[GB/T 26336-2010, definition 3.1.18]
2.5
Service service
The ability of a given layer and its next layers to provide an entity above it.
[GB/T 5271.18-2008, definition 18.01.11]
2.6
Distributed network distributednetwork
A distributed computing network system with high reliability and easy network expansion.
2.7
Industrial control system industrialcontrolsystem; ICS
Integrated with mainframes, devices and equipment that perform computational and industrial control to control systems for industrial production, transmission or distribution.
[IEC /PAS62443-3.2008, definition 3.1.28]
2.8
Industrial control network industrialcontrolnetwork; ICN
To connect to the network of ICS devices, a factory may have different ICNs at the same time, which may be connected to remote devices and external resources of the plant.
2.9
Deterministic delay deterministicdelay
Unless there is a failure or interference, end-to-end delays that are independent of network traffic have the widest range of communication system characteristics.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36417.2-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36417.2-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 36417.2-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36417.2-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|