HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 35709-2017 English PDF

US$1319.00 ยท In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 35709-2017: Maintenance regulation for bulb hydro-turbine generating units
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 35709-2017English1319 Add to Cart 8 days [Need to translate] Maintenance regulation for bulb hydro-turbine generating units Valid GB/T 35709-2017

PDF similar to GB/T 35709-2017


Standard similar to GB/T 35709-2017

DL/T 345   DL/T 805.4   DL/T 435   GB/T 43794   GB/T 35706   

Basic data

Standard ID GB/T 35709-2017 (GB/T35709-2017)
Description (Translated English) Maintenance regulation for bulb hydro-turbine generating units
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F23
Classification of International Standard 27.140
Word Count Estimation 66,661
Date of Issue 2017-12-29
Date of Implementation 2018-07-01
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 35709-2017: Maintenance regulation for bulb hydro-turbine generating units

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Maintenance regulation for bulb hydro-turbine generating units ICS 27.140 F23 National Standards of People's Republic of China Bulb Tubular Turbine Generator Set Maintenance Procedures Published on.2017-12-29 2018-07-01 Implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration released Directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Basic regulations 2 4.1 Service Interval and Deactivation Time 2 4.2 Inspection Projects and Quality Checkpoints 3 4.3 Overhaul Engineering Planning and Planning 3 4.4 Maintenance Preparation 4 4.5 Maintenance and Safety Ring Management 4 4.6 Maintenance and Repair Phase Organization and Management 4 4.7 General requirements for inspection process quality 4 4.8 Overhaul General Process 5 5 Turbine Overhaul 5 5.1 Wheel and Spindle Inspection 5 5.2 Overhaul of water guides 8 5.3 Expansion joint and runner room inspection 9 5.4 Duct Inspection 10 5.5 Tubular seat and baffle plate inspection 10 5.6 Oil Receiver and Operation Oil Tubing Inspection 10 5.7 Turbine Bearings Inspection and Repair 11 5.8 Spindle Seal Overhaul 12 5.9 Unit Center Check Processing 13 6 Generator Overhaul 13 6.1 Stator Inspection 13 6.2 Rotor Overhaul 18 6.3 Combined Bearing Repair 21 6.4 Lamp Head Assembly Repair 26 6.5 Braking Device Overhaul 27 6.6 Generator Ventilation and Cooling System Overhaul 27 6.7 Generator Neutral Point Equipment Overhaul 28 7 Bearing Oil System Overhaul 29 7.1 Bearing Tank Service 29 7.2 Bearing Oil Cooler Overhaul 29 8 Unit Inspection Acceptance and Test 29 8.1 Inspection and Acceptance 29 8.2 Starting the test project 29 8.3 Overall Inspection and Requirements after Overhaul 30 9 Inspection Summary and Evaluation 34 9.1 Maintenance Information Requirements 34 9.2 Post-Maintenance Assessment 34 Appendix A (Normative Appendix) Grade A, B, C Maintenance Standards and Quality Checkpoints for Bulb Tubular Hydrogenerator Units 35 Appendix B (Normative Appendix) Inspection Items and Quality Checkpoints for Inspection Tubular Parts of Type A, B and C of Bulb Tubular Turbine Generator Units Appendix C (Normative Appendix) Inspection Standards for Grade A, B and C of Bulb Tubular Turbine Generator Units and Quality Checkpoints 43 Appendix D (Informative) Reference Flow Chart for Preparation of Class A Overhaul of Bulb Tubular Turbine Generators 44 Appendix E (Informative Appendix) General Disassembly Process Flow of Bulb Tubular Turbine Generators 45 Appendix F (Informative Appendix) Flowchart for General Installation of Bulb Tubular Turbine Generating Units 46 Appendix G (Informative) Maintenance Critical Data Records 47 Appendix H (Informative Appendix) Diagram of Inspection, Disassembly and Turnover of a Typical Bulb Tubular Hydrogenerator Unit 50

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing agency of this document does not assume responsibility for identifying these patents. This standard is proposed and managed by the China Electricity Council. This standard is mainly drafted by. Wuling Electric Power Co., Ltd., Hunan Wuling Power Engineering Co., Ltd., Guangzhou Kinxin Technology Co., Ltd. the company. The main drafters of this standard. Deng Zhihua, Yao Xiaoyan, Yuan Rui, Tan Wensheng, Liu Qiang, Xu Yueyun, Zhao Xunxin, Xiao Qizhi, Liu Feng, Zeng Weicai, Li Fuping, Yang Changle, Zhong Yong, Liu Xiaoyun, Zhu Zhenjun, Liu Yong, Xu Lixia, Ying Liming, and Cui Xue. Bulb Tubular Turbine Generator Set Maintenance Procedures

1 Scope

This standard stipulates the maintenance level, maintenance cycle, maintenance items, inspection and repair procedures, acceptance and testing of bulb-type turbine-generator sets, etc. Claim. This standard applies to bulb turbine tuner units with rated power of 5MW and above or runner diameter of 2.5m and above. repair. Other bulb tune turbine unit maintenance can refer to the implementation.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 8564 Installation Specifications for Hydrogenerator Units General specification of GB/T 16938 fastener bolts, screws, studs and nuts GB/T 24001 Environmental Management System Requirements and Usage Guidelines GB 26164.1 Code of Practice for Electrical Safety Part 1. Thermal and Mechanical GB/T 28001 occupational health and safety management system requirements DL/T 596 Preventive Test Procedures for Electrical Equipment DL/T 827 Bulb Turbine Generator Startup Test Procedure DL/T 1318 Specification for Technical Supervision of Hydroelectric Power Plants DL/T 5070 on-site manufacturing installation and welding process guide for hydro turbine metal volute DL/T 5113.11 Standard for the Quality Assessment of Single Projects of Hydropower and Water Conservancy Capital Construction Project Part 11. Bulb Tubular Water Wheel generator installation engineering

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Maintenance level maintenancegrades Based on the principle of maintenance and decommissioning time of bulb-type turbine-generator units, the maintenance of the unit is divided into four grades. A, B, C, and D. 3.2 Class A overhaul Aclassmaintenance Complete disassembling inspections and repairs of turbines and generators on the unit or alone to maintain, restore, or improve equipment performance. 3.3 Class B overhaul Bclassmaintenance For some problems with the unit's equipment, disassemble the unit's equipment and repair. Class B maintenance can be based on unit equipment According to the results of the state assessment, some A-level maintenance projects or periodic rolling maintenance projects are targeted.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 35709-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 35709-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 35709-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 35709-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information