|
US$759.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 35691-2017: Guide for photovoltaic power station identification system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 35691-2017 | English | 759 |
Add to Cart
|
6 days [Need to translate]
|
Guide for photovoltaic power station identification system
| Valid |
GB/T 35691-2017
|
PDF similar to GB/T 35691-2017
Basic data | Standard ID | GB/T 35691-2017 (GB/T35691-2017) | | Description (Translated English) | Guide for photovoltaic power station identification system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F04 | | Classification of International Standard | 27.160 | | Word Count Estimation | 38,319 | | Date of Issue | 2017-12-29 | | Date of Implementation | 2018-07-01 | | Regulation (derived from) | National Standards Bulletin 2017 No. 32 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 35691-2017: Guide for photovoltaic power station identification system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide for photovoltaic power station identification system
ICS 27.160
F04
National Standards of People's Republic of China
Photovoltaic Power Station Identification System Coding Guidelines
2017-12-29 Posted
2018-07-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 basic requirements 2
5 craft related logo 3
5.1 logo structure 3
5.2 encoding character type 3
5.3 prefix 3
5.4 station code 3
5.5 System Code 4
5.6 device code 4
5.7 Part Number 4
5.8 Each system and major equipment identification 4
6 installation point identification 5
6.1 logo structure 5
6.2 encoding character type 5
6.3 prefix 5
6.4 station code 5
6.5 Install the unit code 5
6.6 Delimiter 6
6.7 installation space code 6
7 location identification 6
7.1 logo structure 6
7.2 Code character type 6
7.3 prefix 6
7.4 station code 6
7.5 building (structure) building code 7
7.6 Room (Partition) Code 7
8 Marking provisions 7
8.1 Note format 7
8.2 Drawings 8
8.3 Live Marking 8
Appendix A (Normative) System Index 9
Appendix B (Normative) Device Index 13
Appendix C (Normative) Component Index 15
Appendix D (Normative) Building (Structure) Index 17
Appendix E (Normative) Process-related labeling of systems and major equipment 18
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents.
This standard proposed by the China Electricity Council and centralized.
This standard was drafted unit. Shanghai Electric Power New Energy Development Co., Ltd., Yellow River upstream hydropower development limited liability company, Guangzhou Jianxin Technology
Co., Ltd.
The main drafters of this standard. Zhou Yao, Yu Jian, Wang Xingyu, Zhang Wanjun, Xu Lixia, Kim Dong-bing, Xie Li Li, Shen Haiou, Tang Lin, Zou Jian,
Xu Jun, Shi Bangwen, Liu Yong, Lu Yuanming, Zhao Hui, Fu Guoxuan, Bai Yu, Chen Wei.
Photovoltaic Power Station Identification System Coding Guidelines
1 Scope
This standard specifies the basic requirements of photovoltaic power station identification system coding, process-related identification, installation point identification, location identification and standard
Note requirements.
This standard applies to photovoltaic power plants and photovoltaic power generation system design, construction and operation and maintenance.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 50549 Power Plant Identification System coding standards
GB 50797 photovoltaic power station design specifications
GB/T 51061 code for grid project coding system code
3 Terms and definitions
GB 50797 and GB/T 50549 define the following terms and definitions apply to this document. For ease of use, repeat the column below
Some of GB 50797 and GB/T 50549 out of some of the terms and definitions.
3.1
Photovoltaic module photovoltaicmodule
With the package and the internal connection, can provide a separate DC output, the smallest indivisible solar cell assembly. Also known as the sun
Battery components.
[GB 50797-2012, Definition 2.1.1]
3.2
PV module string photovoltaicmodulesstring
In photovoltaic power generation system, a number of photovoltaic modules in series, the formation of a certain DC output circuit unit.
[GB 50797-2012, Definition 2.1.2]
3.3
Photovoltaic power unit photovoltaicpowerunit
Photovoltaic power plants, with a certain number of PV modules string, through the DC confluence box collection, the inverter by the centralized inverter (or through the string
Inverter inverter, the exchange of confluence box collection) and isolation step-up transformer boost to meet the grid frequency and voltage requirements of the power supply. Also known as single
Yuan power generation module.
Note rewrite GB 50797-2012, the definition of 2.1.3.
3.4
Photovoltaic square photovoltaicarray
A number of photovoltaic modules in a mechanical and electrical manner assembled together and have a fixed support structure and constitute the DC
Electrical unit. Also known as photovoltaic array.
[GB 50797-2012, Definition 2.1.4]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 35691-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 35691-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 35691-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 35691-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|