US$339.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 33591-2017: Technical specification of time synchronism system and equipment in smart substation Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 33591-2017 | English | 339 |
Add to Cart
|
4 days [Need to translate]
|
Technical specification of time synchronism system and equipment in smart substation
| Valid |
GB/T 33591-2017
|
PDF similar to GB/T 33591-2017
Basic data Standard ID | GB/T 33591-2017 (GB/T33591-2017) | Description (Translated English) | Technical specification of time synchronism system and equipment in smart substation | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F21 | Classification of International Standard | 29.020 | Word Count Estimation | 17,126 | Date of Issue | 2017-05-12 | Date of Implementation | 2017-12-01 | Quoted Standard | GB/T 191; GB/T 2423.1; GB/T 2423.2; GB/T 2423.3; GB/T 4208; GB/T 9361; GB/T 11287; GB/T 14537; GB/T 14598.3; GB/T 17626.2; GB/T 17626.3; GB/T 17626.4; GB/T 17626.5; GB/T 17626.8; GB/T 17626.9; GB/T 17626.10; GB/T 17626.12; GB/T 17742; GB/T 26866; DL/T 860 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the basic architecture, configuration, time synchronization system and equipment functions, operation, performance, test, marking, packaging, transportation and storage requirements of the Intelligent Substation Time Synchronization System (hereinafter referred to as "Time Synchronization System"). The This standard applies to 110 kV (66 kV) and above the voltage level of intelligent substation, other substations can refer to the implementation. |
GB/T 33591-2017: Technical specification of time synchronism system and equipment in smart substation ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of time synchronism system and equipment in smart substation
ICS 29.020
F21
National Standards of People's Republic of China
Intelligent substation time synchronization system and
Equipment specification
2017-05-12 released
2017-12-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface I
1 Scope 1
2 normative reference document 1
3 Terms and definitions 2
4 acronym 2
5 General 3
Technical requirements 3
7 operational requirements 5
Performance requirements 6
9 Test 8
10 identification, packaging, transportation and storage 9
Appendix A (Normative Appendix) Status Monitoring Logical Node 11
Appendix B (informative) Reference signal selection criteria 12
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the China Electricity Council.
This standard by the National Grid Operation and Control Standardization Technical Committee (SAC/TC446) centralized.
The drafting of this standard unit. Guizhou Power Grid Co., Ltd. Electric Power Research Institute, State Grid Jiangsu Electric Power Company Electric Power Research Institute,
Guizhou Electric Power Design and Research Institute, Guizhou Power Grid Co., Ltd., China Southern Power Grid Power Dispatching Control Center, State Grid Corporation of power transfer
Degree control center, the Southern Power Grid Science Research Institute limited liability company, the State Grid Jiangsu Province Electric Power Company, the State Grid Corporation of Central China Branch, China Power
Force Science Research Institute, Wuhan Zhongyuan Huadian Technology Co., Ltd., Beijing Quartet Jiabao Automation Co., Ltd., State Grid Electric Power Research
Institute, Jiangsu Fangtian Power Technology Co., Ltd.
The main drafters of this standard. Xu Changbao, Gao Jipu, Peng Zhiqiang, Zhang Xiang, Zhu Hailong, Zhang Xiaoyi, Xiao Yong, Dai Yu, Wang Yongfu, Chen Bo, Zhang Qibing,
Xiao Xia, Li Xinsong, Chen Xinnan, Xiong Han, Xiong Chunhui, Shen Jian, Li Cheng, Huang Xin, Zeng Fei, Ning Nan, Feng Yi, Chen Surong, Wang Xiaoyan,
Su Dawei.
Intelligent substation time synchronization system and
Equipment specification
1 Scope
This standard specifies the basic structure, configuration and timing of the intelligent substation time synchronization system (hereinafter referred to as "time synchronization system").
Step system and equipment functions, operation, performance, testing, marking, packaging, transportation and storage requirements.
This standard applies to 110kV (66kV) and above the voltage level of intelligent substation, other substations can refer to the implementation.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 191 packaging and storage icon
GB/T 2423.1 Environmental testing for electric and electronic products - Part 2. Test methods Test pressure A. Low temperature
GB/T 2423.2 Environmental testing for electric and electronic products - Part 2. Test methods - Test B. High temperature
GB/T 2423.3 Environmental testing for electric and electronic products - Part 2. Test methods - Test Cab. Constant damp heat method
GB/T 4208 enclosure protection class (IP code)
GB/T 9361 Computer site safety requirements
GB/T 11287 Electrical relays - Part 21. Vibration, shock, impact and seismic tests for measuring relays and protective devices
Part 1. Vibration test (sine)
Impact and impact test of measuring relays and protective devices GB/T
GB/T 14598.3 Electrical relays - Part 5. Insulation requirements and test for measuring relays and protective devices
Electromagnetic compatibility - Test and measurement techniques - Electrostatic discharge immunity test GB/T
Electromagnetic compatibility - Testing and measurement techniques - Radiofrequency electromagnetic field radiation immunity test GB/T
GB/T 17626.4 Electromagnetic compatibility test and measurement techniques Electrical fast transient burst immunity test
GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
Electromagnetic compatibility (EMC) - Test and measurement techniques - Power frequency magnetic field immunity test GB/T
Electromagnetic compatibility - Testing and measurement techniques - Pulsed magnetic field immunity test GB/T
Electromagnetic compatibility - Testing and measurement techniques - Damping oscillations - Magnetic field immunity test GB/T
Electromagnetic compatibility - Testing and measurement techniques - Ringing wave immunity test GB/T 17626.12
China Earthquake Intensity Table
Code for time synchronization system testing of power system GB/T 26866
DL/T 860.71 Power automation communication networks and systems - Part 7-1. Principles and models of basic communication structures
DL/T 860.72 Power automation communication networks and systems - Part 7-2. Basic information and communication structures - Abstract communication services -
Mouth (ACSI)
DL/T 860.73 Power automation communication networks and systems - Part 7-3. Basic communication structures - Common data classes
DL/T 860.74 Power automation communication networks and systems - Part 7-4. Basic communication structures - Compatible logical node classes and numbers
According to class
DL/T 860.81 Power automation communication networks and systems - Part 8-1. Specific communication services mapping (SCSM) - Mapping to
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 33591-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 33591-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 33591-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 33591-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|