| 
           
             
       
   
   US$359.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32900-2016: Technical specification for relaying protection of photovoltaic power station Status: Valid    
      
    
  
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF | 
		 
			| GB/T 32900-2016 | English | 359 | 
   Add to Cart
   | 
                    3 days [Need to translate]
                 | 
                    Technical specification for relaying protection of photovoltaic power station
                 | Valid | 
                    GB/T 32900-2016
                 | 
		 
	 
     
     
  
	 
       PDF similar to GB/T 32900-2016 
    
   
    
     
          
  
  
    
  Basic data             |  Standard ID  |          GB/T 32900-2016 (GB/T32900-2016) |               |  Description (Translated English)  |          Technical specification for relaying protection of photovoltaic power station |               |  Sector / Industry  |          National Standard (Recommended) |               |  Classification of Chinese Standard  |          K45 |               |  Classification of International Standard  |          29.240 |               |  Word Count Estimation  |          18,133 |               |  Date of Issue  |          2016-08-29 |               |  Date of Implementation  |          2017-03-01 |               |  Regulation (derived from)  |          National Standard Notice No. 14 of 2016 |               |  Issuing agency(ies)  |          General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |         
  GB/T 32900-2016: Technical specification for relaying protection of photovoltaic power station---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.  
Technical specification for relaying protection of photovoltaic power station
ICS 29.240
K45
National Standards of People's Republic of China
Technical specification for relay protection of photovoltaic power station
2016-08-29 released
2017-03-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface I
1 Scope 1
2 normative reference document 1
3 Terms and definitions 1
4 General 2
5 Relay protection configuration principle 3
6 relay protection setting principle 7
7 setting management 11
Appendix A (informative) Typical wiring diagram for photovoltaic power plants 14
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the China Electricity Council and centralized.
The drafting unit of this standard. the national power grid northwest power control sub-center, the national electric power dispatching control center, China Southern power grid power dispatch
Control Center, Qinghai Electric Power Dispatching and Control Center, Xinjiang Electric Power Dispatching Control Center, Shandong Electric Power Dispatching Control Center, Gansu Electric Power Dispatching Control
Center, Northwest Survey and Design Institute, China Electric Power Research Institute, Zhejiang Electric Power Research Institute, Jiangsu Electric Power Design Institute, Nanjing Nairui following
Engineering Technology Co., Ltd., Guangdong Electric Power Research Institute, XJ Electric Co., Ltd., Guodian Nanjing Automation Co., Ltd.
The main drafters of this standard. Zhang Jiankang, Su Xiaohua, Lu Ming, Hu Yong, Li Hongzhi, Meng Xinggang, Ma Jie, Chen Xin, Xi Yu, Shen Xiaofan, Yuan Longwei,
Song Xudong, Huang Xiaoming, Liao Zaiyou, Wang Shuchao, Li Yuping, Guo Yong.
Technical specification for relay protection of photovoltaic power station
1 Scope
This standard specifies the power plant in the power plant relay protection configuration principles, setting principles and setting management requirements.
This standard applies to 35kV and above voltage level delivery line and network of centralized photovoltaic power plant and relay protection related to the Branch
Research, design, manufacture, construction, dispatch and operation. Photovoltaic power stations delivered through other voltage levels may be referred to.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
Technical specification for relay protection and safety automatic device GB/T 14285
Technical specification for access power system of photovoltaic power station GB/T 19964
GB 20840.2 Transformers - Part 2. Supplementary technical requirements for current transformers
General specification for dynamic recording device of DL/T 553 power system
Code for operation of relay protection device for 220kV ~ 750kV power grid
Code for setting operation of relay protection device for 3kV ~ 110kV power grid of DL/T 584
Guide for Selection and Calculation of DL/T 866 Current Transformers and Voltage Transformers
Technical specification for grid - connected inverter for photovoltaic power generation
3 terms and definitions
The following terms and definitions apply to this document.
3.1
Photovoltaic power station
The use of photovoltaic cells photovoltaic effect, the solar radiation can be directly converted into electrical power generation system, generally include transformers, inverter
Equipment and photovoltaic square, and related ancillary facilities.
3.2
Photovoltaic power station point of connection pointofconnectionofPVpowerstation
For a photovoltaic power station with a booster station, it refers to the high voltage side bus or node of the booster station. For non-boost station of photovoltaic power stations, refers to the photovoltaic
Power station output summary point.
3.3
Photovoltaic power station sending line transmissionlineofPVpowerstation
From the grid to the public connection point of the transmission line.
3.4
Low voltage through lowvoltageridethrough
When the power system accident or disturbance caused by the dot voltage drop, in a certain voltage drop range and time interval, the photovoltaic power station
Can guarantee that the network is not running continuously.
   
   
  
  
    
  Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32900-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 32900-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 32900-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32900-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):  List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to  [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.  
        
   
        
       
          
               
 
          |