HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (1 Nov 2025)

GB/T 32900-2016 English PDF

US$359.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32900-2016: Technical specification for relaying protection of photovoltaic power station
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 32900-2016English359 Add to Cart 3 days [Need to translate] Technical specification for relaying protection of photovoltaic power station Valid GB/T 32900-2016

PDF similar to GB/T 32900-2016


Standard similar to GB/T 32900-2016

GB/T 38953   GB/T 37155.2   GB/T 19826   GB/T 32897   GB/T 32890   

Basic data

Standard ID GB/T 32900-2016 (GB/T32900-2016)
Description (Translated English) Technical specification for relaying protection of photovoltaic power station
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K45
Classification of International Standard 29.240
Word Count Estimation 18,133
Date of Issue 2016-08-29
Date of Implementation 2017-03-01
Regulation (derived from) National Standard Notice No. 14 of 2016
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32900-2016: Technical specification for relaying protection of photovoltaic power station

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for relaying protection of photovoltaic power station ICS 29.240 K45 National Standards of People's Republic of China Technical specification for relay protection of photovoltaic power station 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 General 2 5 Relay protection configuration principle 3 6 relay protection setting principle 7 7 setting management 11 Appendix A (informative) Typical wiring diagram for photovoltaic power plants 14

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by the China Electricity Council and centralized. The drafting unit of this standard. the national power grid northwest power control sub-center, the national electric power dispatching control center, China Southern power grid power dispatch Control Center, Qinghai Electric Power Dispatching and Control Center, Xinjiang Electric Power Dispatching Control Center, Shandong Electric Power Dispatching Control Center, Gansu Electric Power Dispatching Control Center, Northwest Survey and Design Institute, China Electric Power Research Institute, Zhejiang Electric Power Research Institute, Jiangsu Electric Power Design Institute, Nanjing Nairui following Engineering Technology Co., Ltd., Guangdong Electric Power Research Institute, XJ Electric Co., Ltd., Guodian Nanjing Automation Co., Ltd. The main drafters of this standard. Zhang Jiankang, Su Xiaohua, Lu Ming, Hu Yong, Li Hongzhi, Meng Xinggang, Ma Jie, Chen Xin, Xi Yu, Shen Xiaofan, Yuan Longwei, Song Xudong, Huang Xiaoming, Liao Zaiyou, Wang Shuchao, Li Yuping, Guo Yong. Technical specification for relay protection of photovoltaic power station

1 Scope

This standard specifies the power plant in the power plant relay protection configuration principles, setting principles and setting management requirements. This standard applies to 35kV and above voltage level delivery line and network of centralized photovoltaic power plant and relay protection related to the Branch Research, design, manufacture, construction, dispatch and operation. Photovoltaic power stations delivered through other voltage levels may be referred to.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Technical specification for relay protection and safety automatic device GB/T 14285 Technical specification for access power system of photovoltaic power station GB/T 19964 GB 20840.2 Transformers - Part 2. Supplementary technical requirements for current transformers General specification for dynamic recording device of DL/T 553 power system Code for operation of relay protection device for 220kV ~ 750kV power grid Code for setting operation of relay protection device for 3kV ~ 110kV power grid of DL/T 584 Guide for Selection and Calculation of DL/T 866 Current Transformers and Voltage Transformers Technical specification for grid - connected inverter for photovoltaic power generation

3 terms and definitions

The following terms and definitions apply to this document. 3.1 Photovoltaic power station The use of photovoltaic cells photovoltaic effect, the solar radiation can be directly converted into electrical power generation system, generally include transformers, inverter Equipment and photovoltaic square, and related ancillary facilities. 3.2 Photovoltaic power station point of connection pointofconnectionofPVpowerstation For a photovoltaic power station with a booster station, it refers to the high voltage side bus or node of the booster station. For non-boost station of photovoltaic power stations, refers to the photovoltaic Power station output summary point. 3.3 Photovoltaic power station sending line transmissionlineofPVpowerstation From the grid to the public connection point of the transmission line. 3.4 Low voltage through lowvoltageridethrough When the power system accident or disturbance caused by the dot voltage drop, in a certain voltage drop range and time interval, the photovoltaic power station Can guarantee that the network is not running continuously.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32900-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32900-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32900-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32900-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information