HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (1 Nov 2025)

GB/T 32823-2016 English PDF

US$199.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32823-2016: General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 32823-2016English199 Add to Cart 3 days [Need to translate] General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid Valid GB/T 32823-2016

PDF similar to GB/T 32823-2016


Standard similar to GB/T 32823-2016

GB/T 36050   GB/T 36278   GB/T 33592   GB/T 45527   GB/T 28583   

Basic data

Standard ID GB/T 32823-2016 (GB/T32823-2016)
Description (Translated English) General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 29.240
Word Count Estimation 10,114
Date of Issue 2016-08-29
Date of Implementation 2017-03-01
Regulation (derived from) National Standard Announcement 2016 No.14
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32823-2016: General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid ICS 29.240 F20 National Standards of People's Republic of China Energy saving projects save energy Technical guidelines for measurement and verification Generalguidelineofmeasurement andverificationofelectricpowerandenergy 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 the main content of measurement and verification 2 5 Technical requirements for measurement and verification 2 Analysis and Evaluation of Uncertainty Appendix A (informative) Energy Saving Project Energy Saving Measurement and Verification Report (Sample) 5

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. This standard is proposed by the China Electricity Council and centralized. The drafting of this standard unit. China Electric Power Research Institute, China Southern Power Grid Research Institute, State Grid Energy Conservation Services Limited, China Southern Power Grid Energy Co., Ltd., State Grid Hunan Electric Power Company, China Standardization Research Institute, the State Grid Gansu Electric Power Company, the State Grid Henan Electric Power Company Beijing Electric Power Company, the State Grid Hebei Electric Power Co., Ltd., the State Grid Shandong Electric Power Company, the State Grid Xinjiang Electric Power Company, the State Grid Inner Mongolia Ancient East Electric Power Co., Ltd., Inner Mongolia Electric Power (Group) Co., Ltd., NARI Group, XJ Group, North China Electric Power University, South China University of Technology. The main drafters of this standard. Yan Huaguang, Meng Junya, Xiong Min, Jiang Limin, Guo Bingqing, Zhong Ming, He Guixiong, Wang Ke, Fan Ying, Ouyang Cheng, Luo Zhikun, Li Pengcheng, Wang Weizhou, Liu Hao, Yang Xu, Yang Xiaobo, Wang Zhiliang, Wang Yong, Shi Changming, Zhang Wei, Peng Xudong, Lu Zhilai, Yin Zhongdong, Energy saving projects save energy Technical guidelines for measurement and verification

1 Scope

This standard specifies the main content, technical requirements and uncertainty analysis of power saving and energy saving projects. assessment. This standard applies to public transmission and distribution network and power users for the power supply and distribution system of energy-saving projects, new projects can refer to the implementation.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Guide for Energy Testing of Energy - Carrying Equipment GB/T 6422 General rules for energy - saving monitoring technology GB/T Method of energy - saving monitoring for enterprise power supply and distribution system GB/T 16664-1996 General rules for the preparation and management of energy - using energy - measuring instruments GB/T 17167-2006 General rules for energy saving and verification techniques GB/T 28750-2012 Evaluation and Representation of Measurement Uncertainty JJF1059.1-2012 Guide for calculation of power loss in power grids EVO10000-1..2014 International Energy Efficiency Measurement and Verification Program Core Concept (InternationalPerformanceMeas- urement andVerificationProtocolCoreConcepts) EVO10100-1..2014 International Energy Efficiency Measurement and Verification Program Statistics and Uncertainty (InternationalPer- formance Measurement and Verification ProtocolCoreConceptsStatisticsand Uncertaintyfor IPMVP)

3 terms and definitions

GB/T 28750-2012 Definitions and the following terms and definitions apply to this document. 3.1 Energy saving project of energy saving A series of activities to improve the efficiency of the transmission of electrical energy or to reduce the loss of power delivered by the grid, and these activities must The specific time, budget, and resource limits are completed in accordance with standards and specifications. 3.2 On behalf of day typicalworkingdays Can reflect a certain period of time equipment or system typical operating conditions of the date. 3.3 Saving power By taking technical or administrative measures, compared to those that did not take these measures before the reduction of active power loss.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32823-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32823-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32823-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32823-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information