|
US$2034.00 · In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30217.1-2013: Petroleum and natural gas industries -- Drilling and production equipment -- Part 1: Design and operation of marine drilling riser equipment Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 30217.1-2013 | English | 2034 |
Add to Cart
|
7 days [Need to translate]
|
Petroleum and natural gas industries -- Drilling and production equipment -- Part 1: Design and operation of marine drilling riser equipment
| Valid |
GB/T 30217.1-2013
|
PDF similar to GB/T 30217.1-2013
Basic data | Standard ID | GB/T 30217.1-2013 (GB/T30217.1-2013) | | Description (Translated English) | Petroleum and natural gas industries -- Drilling and production equipment -- Part 1: Design and operation of marine drilling riser equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E92 | | Classification of International Standard | 75.180.10 | | Word Count Estimation | 102,120 | | Quoted Standard | ISO 13625; BS 7910 | | Adopted Standard | ISO 13624-1-2009, IDT | | Regulation (derived from) | National Standards Bulletin 2013 No. 27 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the design of floating marine drilling riser system, selection, operation and maintenance. This standard is intended for designers, system components, and select personnel to use the equipment and maintenance personnel for referenc |
GB/T 30217.1-2013: Petroleum and natural gas industries -- Drilling and production equipment -- Part 1: Design and operation of marine drilling riser equipment ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum and natural gas industries Drilling and production equipment Part 1. Design and operation of marine drilling riser equipment
ICS 75.180.10
E92
National Standards of People's Republic of China
Drilling and oil and gas industry
Oil extraction equipment - Part 1. Marine drilling riser
Equipment design and operation
Part 1. Designandoperationofmarinedrilingriserequipment
(ISO 13624-1.2009, IDT)
Issued on. 2013-12-31
2014-10-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅴ
1 Scope 1
2 Normative references 1
3 Terms, Definitions and Abbreviations 1
3.1 Terms and definitions
9 3.2 Acronyms
Function and select 104 members
4.1 Overview 10
4.2 10 member selection criteria
4.3 marine drilling riser system 10
4.4 tensioner system 12
4.5 diverter system (water) 13
4.6 TJ (slip joint) 13
4.7 single riser 14
4.8 Ocean separated the lower portion of pipe sealing means (LMRP) 15
4.9 flexible couplings and ball joints 16
4.10 flexible choke and kill line 17
4.11 riser into the device 18
Choke and kill and auxiliary lines 4.12 riser installation 18
4.13 buoyancy device 20
4.14 Special equipment 20
5 riser analysis 21
5.1 General 21
5.2 riser analysis program 21
22 5.3 Design
5.4 riser general model and analysis method 25
5.5 coupling or decoupling analysis 31
5.6 Analysis drift away or expelled 31
5.7 vulnerability analysis method 32
5.8 Recoil Analysis 33
5.9 sea workflow environment 33
5.10 Suspension Analysis 35
6 riser 37 jobs
6.1 Introduction 37
6.2 Riser Operating Manual 38
6.3 drilling riser operating information system 38
6.4 preparation into the riser 39
6.5 riser feeding and recovery 41
6.6 riser mounting operation 44
6.7 Emergency Disconnect --- sudden storm, expelled or drift away from 49
7 riser integrity 50
50 7.1 Basic inspection requirements
7.2 riser recovered after maintenance 52
7.3 Other riser system equipment maintenance 52
7.4 Transport, Handling and Storage 53
7.5 predetermined site inspection and maintenance 54
7.6 in-service inspection 55
7.7 Inspection Guide member 57
7.8 Objective test and acceptance criteria 58
7.9 Operating interval recording pipe member 59
8 special circumstances 61
8.1 61 deepwater drilling
8.2 No guide wire system 63
Cold weather considerations 64 8.3
8.4 Riser collapse consideration 64
8.5 H2S consider 65
Appendix A (informative) riser analysis data worksheet 66
Annex B (informative) Fatigue 71
Annex C (informative) Calculation example riser 72
Annex D (informative) riser into the program example 84
Annex E (informative) spacing tolerances, telescopic riser, draft, tide, heave and shift caused by TJ maximum and minimum
Stroke Calculation Example 86
References 89
1 marine riser system and associated equipment 11
2 internal stress riser 24
Figure 3 allowable stress and important dynamic stress range of 24
4 riser differential unit 26
5 marine riser length is determined 40
Figure 6 riser installation and recovery 42
7 riser installation and recovery extreme conditions Example 43
8 riser tensioner set values \u200b\u200band the drilling fluid (density) --- Recommended example 45
9 dismount various drill string tension force and the flexible joint angle 46
10 different water depths at the riser drilling fluid density and pressure loss 47
11 suspended the scope of example 48
12 riser system diagram 51
Figure C.1 Example To calculate the riser schematic 79
Table 1 compatible combination of BOP and riser outer diameter of the aperture 14
Table 2 largest marine drilling riser design guide 22
Table 3 Common values \u200b\u200bof Cd and Cm 29
Table 4 drilling riser inspection requirements 50
Table 5 reasonable examination of the data required by 60
Table A.1 riser analysis data worksheet 66
Table C.1 riser analysis data worksheet Calculation Example 74
Table C.2 Underwater total weight with tolerance factor 80
Table C.3 tolerance factor with total buoyancy 80
Foreword
GB/T 30217 "Petroleum and natural gas industries - Drilling and production equipment" is divided into two parts.
--- Part 1. marine drilling riser equipment design and operation;
--- Part 2. Deepwater drilling riser analysis, operations, and integrity technical report.
This section GB/T Part of 130,217.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This section uses the translation method identical with ISO 13624-1.2009 "Petroleum and natural gas industries - Drilling and production equipment - Part 1.
Marine drilling riser equipment design and operation. "
Consistency correspondence between this part of international documents and normative references of our files are as follows.
--- SY/T 6917-2012 Petroleum and natural gas industries - Drilling and production equipment - Marine drilling riser joints (ISO 13625.
2002, MOD)
This section also made the following editorial changes.
--- Corrected text of the error.
This part of the National Oil Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96) and focal points.
This section is responsible for drafting. National oil and gas drilling equipment engineering and technology research center.
This section participated in the drafting unit. China Oilfield Services Limited, the oil industry well control equipment for Quality Supervision and Inspection Center, Baoji stone
Oil Machinery Co., Ltd., CNOOC Energy Pipeline Engineering Branch development drilling pipe, finite Hebei North China Petroleum Rongsheng Machinery Manufacturing
the company.
The main drafters of this section. Wang Jin-wide, Fanya Min, Yang Yugang, Liu Yuan, Chen Cai Hu, Ren can be tolerated, Jiang Yu Gracilaria, Jinxue Yi, Zhang Hongbo,
Sun Juan, Mengqing Rong, rice Shou-Rong, Li Xinmin.
Drilling and oil and gas industry
Oil extraction equipment - Part 1. Marine drilling riser
Equipment design and operation
1 Scope
GB/T 30217 apply to this part of the floating marine drilling riser system design, selection, operation and maintenance. This section
It is intended for designers, system components as well as personnel selection and maintenance of the equipment referenced. This depends in part on the original basic engineering
Marine management and operating personnel, contractors and manufacturers accumulated experience.
Note. this technology advances, advanced methods and equipment after another. Encourage every owner and operator to follow this recommendation as part of the presentation
Law and to supplement these with other technologies recommended practice proven to reduce costs, improve security and (or) reliability.
It should be regarded as a marine drilling riser system. Designers, contractors and operators should be recognized and recommended a single member of the election
Selection method should be suitable for the overall performance of the system. In this section, the marine drilling riser system includes a tensioner system and UFJ or ball joint
All devices connected to the top and lower wellhead connector between, it does not include a splitter. And, GB/T 30217 in this section applies only
Configured for use with subsea BOP stacks together underwater operations.
Part 1 of this chapter - Chapter 7 is directly applicable to the majority of floating drilling operations. 8.1 and 8.4 expressions involving deepwater drilling and crowded
Destroyed exceptional circumstances. 8.2 expresses no special considerations guide rope drilling required. In addition, 8.3 and 8.5 and expressed the cold weather conditions
Operating under conditions of H2S.
It is important that all riser main load path parts in this section are expressed in accordance with ISO 13625 predetermined load classification.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
ISO 13625 Petroleum and natural gas industries - Drilling and production equipment - Marine drilling riser joints (Petroleumandnatural
gasindustries-Drilingandproductionequipment-Marinedrilingrisercouplings)
BS7910 metal structural defects Acceptance Assessment Methodology Guide (Guidetomethodsforassessingtheacceptabilityof
flawsinmetalicstructures)
3 Terms, definitions and abbreviations
3.1 Terms and Definitions
The following terms and definitions apply to this document.
3.1.1
Accumulators (for BOP) accumulator
Filled ullage gas (nitrogen) pressure vessel for storing hydraulic fluid under pressure to operate the BOP.
3.1.2
Accumulators (for riser tensioner) accumulator
Ullage filling gas pressure vessels, high pressure gas from the tensioner for cylinders in the pressure vessel pressurized gas side, the supply of high pressure
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30217.1-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 30217.1-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30217.1-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30217.1-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|