|
US$169.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24564-2009: Monitoring and testing for energy saving of hot-air furnace Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 24564-2009 | English | 169 |
Add to Cart
|
3 days [Need to translate]
|
Monitoring and testing for energy saving of hot-air furnace
| Valid |
GB/T 24564-2009
|
PDF similar to GB/T 24564-2009
Basic data | Standard ID | GB/T 24564-2009 (GB/T24564-2009) | | Description (Translated English) | Monitoring and testing for energy saving of hot-air furnace | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 7,752 | | Date of Issue | 2009-10-30 | | Date of Implementation | 2010-05-01 | | Quoted Standard | GB/T 4272 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 12 of 2009 (No. 152 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the blast furnace energy monitoring project, monitoring methods and assessment indicators. This standard applies to blast furnace. |
GB/T 24564-2009: Monitoring and testing for energy saving of hot-air furnace---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Monitoring and testing for energy saving of hot-air furnace
ICS 27.010
F01
National Standards of People's Republic of China
Hot blast stove energy monitoring
Posted 2009-10-30
2010-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
Appendix A of this standard is a normative appendix.
This standard by the National Standardization Technical Committee for Energy Management and focal points.
This standard was drafted. Tianjin energy monitoring four points, Tianjin Institute of Energy Technology, Industrial Furnace Co., Ltd. Tianjin Saiyo.
The main drafters of this standard. Jia Jun, Zhang review, Ren Changqing, Shangke Wu, Liu Feng, Huoquan Lan, Wang Jinxiang, Wangjing Liang, Zhu Tianli, Chen Fang,
Shan Chen, Yang Ying, Zhang Dianjun, left light.
Hot blast stove energy monitoring
1 Scope
This standard specifies the hot blast furnace energy monitoring program, monitoring methods and assessment indicators.
This standard applies to hot blast furnace.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 4272 General technical equipment and pipeline insulation
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
Hot blast stove surface temperature and the difference between ambient temperature.
4 blast furnace hot stove energy monitoring project
Check item 4.1
4.1.1 owned equipment and hot blast furnace, heating the object to be operating normally, good governance.
4.1.2 combustion and auxiliary equipment configuration reasonable, complete combustion in good condition.
4.1.3 measuring instruments equipped, reasonable, normal operation, and in the test cycle.
4.1.4 regenerator set reasonable work properly.
4.1.5 commutation equipment in good working condition.
4.1.6 hot blast furnace control system is perfect, rational, normal work.
4.1.7 furnace should be tight, insulation integrity, and in accordance with the relevant provisions of GB/T 4272's.
4.2 Test Project
4.2.1 hot air temperature.
4.2.2 exhaust gas temperature.
4.2.3 hot blast furnace thermal efficiency.
4.2.4 The temperature of furnace body.
5 blast furnace hot stove energy monitoring method
5.1 Conditions and Monitoring time
Monitoring test blast stove should be at normal production, steady state thermal conditions, monitoring time as a complete commutation cycle
(Heating phase, blast phase) τ, in hours (h).
5.2 Monitoring Instruments
Monitoring instruments should be intact, the measurement range and resolution should be adapted to measure the project, its accuracy should not be less than the requirements in Table 1, and
In the test cycle. Instrument accuracy not less than the value specified in Table 1 of the new instrument, applicable to this standard.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 24564-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 24564-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 24564-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 24564-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|