|
US$189.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24562-2009: Monitoring and testing for energy saving for fuel heat treatment furnace Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 24562-2009 | English | 189 |
Add to Cart
|
3 days [Need to translate]
|
Monitoring and testing for energy saving for fuel heat treatment furnace
| Valid |
GB/T 24562-2009
|
PDF similar to GB/T 24562-2009
Basic data | Standard ID | GB/T 24562-2009 (GB/T24562-2009) | | Description (Translated English) | Monitoring and testing for energy saving for fuel heat treatment furnace | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 8,866 | | Date of Issue | 2009-10-30 | | Date of Implementation | 2010-05-01 | | Quoted Standard | GB/T 212; GB/T 4272; GB/T 10180; GB/Z 18718 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 12 of 2009 (No. 152 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the fuel heat treatment furnace energy monitoring project, test methods and assessment indicators. This standard applies to coal, oil and gas furnaces. |
GB/T 24562-2009: Monitoring and testing for energy saving for fuel heat treatment furnace---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Monitoring and testing for energy saving for fuel heat treatment furnace
ICS 27.010
F01
National Standards of People's Republic of China
Heat treatment furnace fuel energy monitoring
Posted 2009-10-30
2010-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
Appendix A of this standard is a normative appendix.
This standard by the National Standardization Technical Committee for Energy Management and focal points.
This standard was drafted. Tianjin energy monitoring four points, Tianjin Institute of Energy Technology, Industrial Furnace Co., Ltd. Tianjin Saiyo.
The main drafters of this standard. Wang Jinxiang, Jia Jun, Ren Changqing, Shangke Wu, Chen Shan, Liu Feng, Zhang review, Huoquan Lan, Wangjing Liang, Zhu Tianli,
Yang Ying.
Heat treatment furnace fuel energy monitoring
1 Scope
This standard specifies the heat treatment furnace fuel energy monitoring project, monitoring methods and assessment indicators.
This standard applies to coal, oil and gas heat treatment furnace.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
Analysis Method GB/T 212 coal
GB/T 4272 General technical equipment and pipeline insulation
Performance testing procedures GB/T 10180 industrial boilers Thermal
GB /Z18718 Heat Treatment Guidelines for energy-saving technology
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
Poor fuel heat treatment furnace surface temperature and ambient temperature.
4 fuel heat treatment furnace energy monitoring project
Check item 4.1
4.1.1 fuel heat treatment furnace body and to your device is operating normally.
4.1.2 The furnace should be tight, intact, thermal insulation properties of gas pipeline, oil pipeline, hot air pipes should be consistent with GB/T 4272 regulations.
4.1.3 Metering fully equipped, reasonable, and in the test cycle.
4.1.4 Exhaust system and device reasonable working properly.
4.1.5 heat treatment furnace control systems and equipment configuration is reasonable, meet the technical requirements.
4.1.6 heat treatment load rate of heating equipment shall comply with GB /Z18718's.
4.1.7 Check the heat balance reports three years by a qualified professional unit testing.
4.2 Test Project
4.2.1 exhaust gas temperature.
4.2.2 air factor.
4.2.3 fired heat treatment furnace slag carbon content.
4.2.4 The temperature of furnace body.
5 heat treatment furnace fuel energy monitoring method
5.1 Conditions and Monitoring time
Testing should be normal production conditions in the heat treatment furnace. Continuous operation from the heat-treating furnace reaches a steady state thermal conditions began monitoring
Time should be less than 2h; periodic monitoring of a heat treatment furnace operating cycle (when the insulation termination to the end). In addition to measuring the required laboratory analysis
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 24562-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 24562-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 24562-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 24562-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|