HOME   Cart(6)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 23576-2024 English PDF

US$399.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 23576-2024: Abrasive blasting equipment - General technical specifications
Status: Valid

GB/T 23576: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 23576-2024English399 Add to Cart 4 days [Need to translate] Abrasive blasting equipment - General technical specifications Valid GB/T 23576-2024
GB/T 23576-2009English329 Add to Cart 3 days [Need to translate] Abrasive blasting equipment -- General technical requirements Valid GB/T 23576-2009

PDF similar to GB/T 23576-2024


Standard similar to GB/T 23576-2024

GB/T 39957   GB/T 37371   GB/T 37365   GB/T 23583.2   GB/T 23583.1   

Basic data

Standard ID GB/T 23576-2024 (GB/T23576-2024)
Description (Translated English) Abrasive blasting equipment - General technical specifications
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard J61
Word Count Estimation 20,220
Date of Issue 2024-08-23
Date of Implementation 2024-08-23
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 23576-2024: Abrasive blasting equipment - General technical specifications

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Abrasive blasting equipment - General technical specifications General technical specifications for shot peening equipment ICS 25.120.30 CCS J 61 National Standard of the People's Republic of China Replaces GB/T 23576-2009 Released on 2024-08-23 2025-03-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface ... Ⅲ 1 Scope ... 1 2 Normative references ... 1 3 Terms and Definitions 2 4 Technical requirements ... 3 4.1 General requirements 3 4.2 Processing, assembly and appearance quality ... 3 4.3 Shot Blaster ... 3 4.4 Shot Peening Machine ... 3 4.5 Abrasive Circulation System ... 3 4.6 Workpiece carrier ... 4 4.7 Shot blasting room ... 5 4.8 Workpiece loading and unloading system ... 5 4.9 Dust Removal System ... 5 4.10 Electrical System ... 5 4.11 Hydraulic and pneumatic systems ... 5 4.12 Safety Requirements 5 4.13 Idle running test requirements 6 4.14 Load operation test requirements 6 4.15 Random Technical Documents 6 5 Test methods ... 7 5.1 Accuracy Test 7 5.2 Determination of the projectile zone 7 5.3 Determination of hardness of wearing parts 7 5.4 Determination of hardness difference of each group of leaves 7 5.5 Determination of the amount of qualified abrasive contained in the screen material of linear vibration screen and drum screen 7 5.6 Determination of impurity content in abrasives and qualified abrasive content in waste materials 7 5.7 Idle running test 7 5.8 Load operation test ... 8 6 Inspection Rules ... 8 6.1 Factory Inspection 8 6.2 Type inspection 8 7 Marking, packaging, transportation and storage 9 Appendix A (Normative) Determination of shot peening intensity ... 10 A.1 Arc height ... 10 A.2 Arc Height Saturation Curve ... 10 A.3 Method of expressing shot peening intensity ... 10 A.4 Shot peening intensity testing device ... 11 A.5 Selection of test pieces ... 11 A.6 Determination of shot peening intensity 11 References ... 12

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. This document replaces GB/T 23576-2009 "General Technical Requirements for Shot Peening Equipment". Compared with GB/T 23576-2009, In addition to structural adjustments and editorial changes, the main technical changes are as follows. Added a chapter on “Terms and Definitions” (see Chapter 3); a) Added "processing, assembly and appearance quality" requirements (see 4.2); b) The requirements for “Electrical System” have been changed and the provisions for CNC system have been added (see 4.10, 3.1.2 of the.2009 edition); c) The provisions on “cleanliness of the inside of oil and gas cylinders” (see 3.1.12 of the.2009 edition) have been deleted, and the provisions on “cleanliness of the inside of hydraulic and pneumatic systems” have been added. "System" provisions (see 4.11.3, 4.11.4); d) Added "Safety Requirements" (see 4.12); e) Changed the relevant provisions of "No-load test requirements" and "Load test requirements" (see 4.13, 4.14,.2009 edition) 3.9); f) Added the requirements for purchased accessories and preparation (see 4.1 5.2), and changed the requirements for "random technical documents" (see 4.15.3, 3.1.19 of the.2009 edition); g) The "Determination of cleanliness" (see 4.3 of the.2009 edition) was deleted, and the "Determination of hardness difference of each set of blades" and "Idle run test" were added. "Test" and "Load operation test" (see 5.4, 5.7, 5.8); h) Added requirements for machine labels (see 7.2, 7.3, 7.4) and requirements for machine storage (see 7.9); i) Changed the "arc height curve" to "arc height saturation curve", changed the "shot peening intensity expression method" and "shot peening intensity expression method" "Degree detection device" (see A.2~A.4, A.1~A.3 of the.2009 edition); j) The requirements for test piece selection have been changed (see A.5, A.4 and A.5 of the.2009 edition); k) The requirements for the determination of shot peening intensity have been changed (see A.6.2, A.6.2 of the.2009 edition). l) Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Machinery Industry Federation. This document is under the jurisdiction of the National Technical Committee for Standardization of Foundry Machinery (SAC/TC 186). This document was drafted by. Zhejiang Pujiang Bohu Chain Co., Ltd., Qingdao Antai Heavy Industry Machinery Co., Ltd., Qingdao Kaijie Heavy Industry Machinery Machinery Co., Ltd., Suzhou Huace Testing Technology Co., Ltd., Nan'an Zhongji Standardization Research Institute Co., Ltd., Jinan Casting and Forging Institute Inspection and Testing Technology Co., Ltd., Shandong Kaitai Shot Blasting Machinery Co., Ltd., Baoding Weier Foundry Machinery Co., Ltd., Jiangsu Dongfang Zhonglian Industry Technology Co., Ltd., Yancheng Fengte Foundry Machinery Co., Ltd., Fujian Minxuan Technology Co., Ltd., Qingdao Zhongzhida Environmental Protection Smelting Equipment Co., Ltd. Co., Ltd., Anhui Anhuang Machinery Co., Ltd., Anqing Xingye Precision Machinery Co., Ltd., Shandong Jiechuang Machinery Co., Ltd., Zhengzhou Changzhou Sheng Machinery Technology Co., Ltd., Qingdao Xingdong Machinery Co., Ltd., Qingdao Qingli Environmental Protection Equipment Co., Ltd., Weihai Gongyou Foundry Machinery Co., Ltd. Co., Ltd., Qingdao Beinuo Magnetic Technology Co., Ltd., Qingdao Sanrui Machinery Manufacturing Co., Ltd., Jinan Ruisheng Casting Machinery Co., Ltd., Quanzhou Municipal Standardization Association, Sichuan Shuxing Youchuang Safety Technology Co., Ltd., and Shandong Jianzhu University. The main drafters of this document are. Zheng Xiaogen, Ding Renxiang, Xing Haiwei, Chen Guilin, Ke Zhenzhen, Zheng Enqi, Zhou Qin, Lu Jun, Zhang Xiao, Zhang Xiaojing, Wang Ridong, Qiao Shengbing, Chen Weibin, Duan Yudong, Duan Jinting, Li Chen, Bao Yanqing, Chen Maoquan, Du Changxin, Ding Lei, Sun Bingge, Wang Tao, Sui Chengfu, Zhao Peng, Li Haichun, Yan Zuoxiu, Xiang Ziqiang, Huang Zhiqiang, Qin Peijun, Lin Tao, Nie Yuhan. This document was first published in.2009 and this is the first revision. General technical specifications for shot peening equipment

1 Scope

This document specifies the technical requirements for shot peening equipment, describes the corresponding test methods, and specifies the inspection rules, marking, packaging, transportation, etc. Transport and storage. This document applies to the manufacture of shot peening equipment.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies. in this document. GB/T 150 (all parts) Pressure vessels GB/T 191 Pictorial markings for packaging, storage and transportation GB/T 230.1 Rockwell hardness test for metallic materials Part 1.Test method GB/T 1184-1996 Shape and position tolerances without tolerance values GB/T 1804-2000 General tolerances Tolerances of linear and angular dimensions without tolerance indication GB/T 3766 General rules and safety requirements for hydraulic transmission systems and their components GB/T 5226.1 Electrical safety of machinery Electrical equipment of machinery Part 1.General technical requirements GB/T 7932 General rules and safety requirements for pneumatic systems and their components GB/T 7984 General purpose fabric core conveyor belts GB/T 8923.1 Surface preparation of steel materials before coating - Visual assessment of surface cleanliness - Part 1.Uncoated steel surfaces The rust level and treatment level of the steel surface after the original coating is completely removed GB/T 9969 General Principles for Industrial Product Instructions GB/T 10095.2-2023 Cylindrical gears ISO tooth surface tolerance classification system Part 2.Definition and allowable value of radial combined deviation GB/T 13288.2 Surface preparation of steel before coating - Surface roughness characteristics of steel after blast cleaning - Part 2.Abrasive blast cleaning Determination of surface roughness grade of steel after blast cleaning - Comparative specimen method GB/T 13306 Labels GB/T 17421.1 General rules for machine tool inspection Part 1.Geometric accuracy of machine tools under no-load or quasi-static conditions GB 20905 Safety requirements for casting machinery GB/T 23570 General technical requirements for welded parts of metal cutting machine tools GB/T 23571 Preparation of technical documentation for metal cutting machine tools GB/T 23934-2015 Technical requirements for hot-rolled cylindrical helical compression springs GB 24390 Safety requirements for shot blasting equipment GB/T 25370-2020 Terminology of casting machinery GB/T 25371 Method for measuring sound pressure level of casting machinery noise GB/T 25711-2023 General technical specification for casting machinery GB/T 26220 General technical requirements for industrial automation systems and integrated machine tool numerical control systems GB/T 32567 Shot blasting machine AQ 4272 Technical Specification for Dust Explosion Safety in Machining of Aluminum and Magnesium Products

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 23576-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 23576-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 23576-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 23576-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 23576-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 23576-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.