HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 21407-2015 English PDF

US$569.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 21407-2015: Doubly fed variable speed constant frequency wind turbine
Status: Valid

GB/T 21407: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 21407-2015English569 Add to Cart 5 days [Need to translate] Doubly fed variable speed constant frequency wind turbine Valid GB/T 21407-2015
GB/T 21407-2008English679 Add to Cart 5 days [Need to translate] Doubly fed variable speed constant frequency wind turbine Obsolete GB/T 21407-2008

PDF similar to GB/T 21407-2015


Standard similar to GB/T 21407-2015

GB/T 23479   GB/T 19072   GB/T 19071.1   GB/T 25383   GB/T 32077   

Basic data

Standard ID GB/T 21407-2015 (GB/T21407-2015)
Description (Translated English) Doubly fed variable speed constant frequency wind turbine
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F11
Classification of International Standard 27.180
Word Count Estimation 27,231
Date of Issue 2015-10-09
Date of Implementation 2016-06-01
Older Standard (superseded by this standard) GB/T 21407-2008
Quoted Standard GB/T 2900.53; GB 5083-1999; GB/T 9327; GB/T 12325; GB/T 12326; GB/T 14315; GB/T 14549; GB/T 15543; GB 14048.1-2012; GB/T 17626.2; GB/T 17626.3; GB/T 17626.4; GB/T 17626.5; GB/T 17626.6; GB/T 17626.8; GB/T 17799.2; GB/T 18290.2; GB/T 18451.1; GB/T 18451.2; GB/T 19070-2003
Regulation (derived from) National Standard Announcement 2015 No.31
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the grade and nomenclature, technical requirements, test methods, inspection rules, marks, packaging, storage, transportation and storage of horizontal axis double-fed variable speed constant frequency wind turbines (hereinafter referred to as "units"). This standard is applicable to doubly fed variable speed constant frequency wind turbines with wind swept area greater than 200m2.

GB/T 21407-2015: Doubly fed variable speed constant frequency wind turbine

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Doubly fed variable speed constant frequency wind turbine ICS 27.180 F11 National Standards of People's Republic of China Replacing GB/T 21407-2008 Doubly Fed Variable Speed \u200b\u200bConstant Frequency Wind Turbine Issued on. 2015-10-09 2016-06-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 2 Unit 4 constituting 3 Level 5 Unit 3 and naming 6 Technical requirements 5 7 Test requirements and methods 12 16 8 Inspection Rules 9 signs, packaging, storage, transportation and storage 18 Operation and maintenance of 10 units of claim 20 11 Other 20

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard replaces GB/T 21407-2008 "doubly-fed VSCF wind turbine." This standard compared with GB/T 21407-2008, in addition to editorial changes, the major technical changes are as follows. --- Expand the scope of the standard rotor swept area greater than 200m2 units; --- Terms and definitions in the "doubly-fed wound rotor induction generator," "motor side converter" "network-side converter" and "design speed" Etc. delete the definition in the text are not mentioned; --- Added "VSCF means" "Standard Unit" "Taiwan-bit test" and "drag test" four terms; --- Delete the original standard Chapter 4, "Abbreviations"; --- Increase the Chapter 4, "Unit Structure"; --- Increased Chapter 5, "the unit level with the name"; --- Increased Chapter 10, "the unit operation and maintenance requirements"; --- Increased Chapter 11, "other"; --- The technical requirements of the "general requirements" to "basic requirements", adding. "Base Unit design requirements" "Aircraft Design Requirements" "Crew qualified certification requirements" and other provisions; --- The "normal environmental conditions" to "environmental conditions", and points out the environmental conditions and grid conditions in two parts. --- The "performance requirements" to "plant performance and technical requirements", and performance indicators made a partial revision; --- Added "functional requirements", "electrical performance requirements" and "anti-corrosion requirements" provisions; --- The "general assembly requirements" to "unit and its major components (systems) assembly and installation," adds "general requirements" in the article "Unit Manufacturing processes, "" blade manufacturing process requirements, "" mechanical assembly requirements "" Requirements foundation construction crew "" crew to the whole assembly Seeking "" unit commissioning requirements "and" unit commissioning requirements "; --- The "simulation test bench 5.6 Requirements" and "5.7 Unit field testing requirements" after editorial changes "test" into Chapter; --- In the "test" provisions added "test requirements", the "bench test" to "test factory", the "field test unit" To "test wind farm" provisions and made editorial changes. Added "mechanical connection performance test" "level in the test method Gas performance test "," test drive train station position "" the hub assembly station test position "" power performance test "" Grid suitability test "" ENERGY Quality Testing "and" mechanical load test "; --- In the "test category" added "acceptance test"; --- Test items are given by way of listing; --- The standard reference sample "GB/T 5080.7" to "GB/T 19960.1-2005"; --- Remove the "7.5.1 Failure Rate determination"; --- The "packaging and storage" are described separately in strips; --- The "Transport and storage" are described separately in strips; --- The "special requirements of users," revised Chapter 11, "other"; --- Delete "Appendix A" and "Appendix B". The standard proposed by China Machinery Industry Federation. This standard by the National Standardization Technical Committee on mechanical wind (SAC/TC50) centralized. This standard was drafted. Guodian United Power Technology Co., Ltd., Zhejiang Yunda Wind Power Co., Ltd., Shenyang University of Technology Wind Power Operation Institute, Shanghai Electric Wind Power Equipment Co., Sinovel Technology Co., Ltd., China Ming Yang Wind Power Group Co., Ltd., Shenyang Chinese Wind Power Technology Co., Ltd. The main drafters. Zhang Jian Zhi, Feng Jian, Sun Lixiang, Qu Xiaojuan, Pan Lei, Caian Min, Wang Hailong, Zhousheng Bing, Wei Yan Well, HE Ming, Luo Yong water, proper, Wang Xiaodong, Xu Qing shift, Campbell, the Yangming Ming, Zhang Xian, the Chen Xiangquan, Song Xiaowen. This standard previously issued as follows. --- GB/T 21407-2008. Doubly Fed Variable Speed \u200b\u200bConstant Frequency Wind Turbine

1 Scope

This standard specifies the horizontal shaft double-fed VSCF wind turbine (hereinafter referred to as "units") of rank and name, technical requirements, test Test methods, inspection rules, marking, packaging, storage, transportation and storage and so on. This standard applies to rotor swept area greater than 200m2 of doubly-fed VSCF wind turbine.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2900.53 Electrotechnical terminology Wind Turbine GB 5083-1999 General production equipment with safety and health GB/T 9327 rated voltage of 35kV (Um = 40.5kV) power cables conductor connection fittings crimp and mechanical Test methods and requirements GB/T 12325 power quality supply voltage deviation GB/T 12326 Power quality voltage fluctuation and flicker GB/T 14315 power cable conductor crimp copper and aluminum terminals and connecting pipe GB/T 14549 Power quality utility grid harmonic GB/T 15543 Power quality Unbalance GB 14048.1-2012 Low-voltage switchgear and control equipment - Part 1. General GB/T 17626.2 Electromagnetic compatibility Testing and measurement techniques - Electrostatic discharge immunity test GB/T 17626.3 electromagnetic compatibility test and measurement technology RFEMS test GB/T 17626.4 Electromagnetic compatibility Testing and measurement techniques - Electrical fast transient burst immunity test GB/T 17626.5 electromagnetic compatibility test and measurement technology surge (impact) immunity test GB/T 17626.6 Electromagnetic compatibility Testing and measurement techniques Immunity to conducted disturbances induced field GB/T 17626.8 Electromagnetic compatibility Testing and measurement techniques - Power frequency magnetic field immunity test GB/T 17799.2 Electromagnetic compatibility - Generic standards - Immunity for industrial environments GB/T 18290.2 Solderless connections Part 2. Solderless crimped connections - General requirements, test methods and practical guidance GB/T 18451.1 wind turbine design requirements GB/T 18451.2 wind turbine power performance testing GB/T 19070-2003 Test Method for Wind Turbine Controller GB/T 19072-2010 wind turbine tower GB/T 19073-2008 wind turbine gearboxes Corrosivity of atmospheres - Classification GB/T 19292.1 metals and alloys GB/T 19568-2004 wind turbine assembly and installation specifications GB/T 19960.1-2005 wind turbines - Part 1. General requirements GB/T 19963-2011 wind farm power system technical requirements GB/T 20319-2006 acceptance of wind turbines

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 21407-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 21407-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 21407-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 21407-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 21407-2015?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 21407-2015 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information