|
US$329.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17984-2010: Twist drills -- Technical specifications Status: Valid GB/T 17984: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 17984-2010 | English | 329 |
Add to Cart
|
3 days [Need to translate]
|
Twist drills -- Technical specifications
| Valid |
GB/T 17984-2010
|
| GB/T 17984-2000 | English | 519 |
Add to Cart
|
4 days [Need to translate]
|
Twist drills-Technical specifications
| Obsolete |
GB/T 17984-2000
|
PDF similar to GB/T 17984-2010
Basic data | Standard ID | GB/T 17984-2010 (GB/T17984-2010) | | Description (Translated English) | Twist drills -- Technical specifications | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J41 | | Classification of International Standard | 25.100.30 | | Word Count Estimation | 14,165 | | Date of Issue | 2010-11-10 | | Date of Implementation | 2011-03-01 | | Older Standard (superseded by this standard) | GB/T 17984-2000 | | Quoted Standard | GB/T 1438.1; GB/T 1438.2; GB/T 1438.3; GB/T 1438.4; GB/T 1443; GB/T 1804; GB/T 6135.1; GB/T 6135.2; GB/T 6135.3; GB/T 6135.4 | | Regulation (derived from) | National Standard Approval Announcement 2010 No.8 (Total No.163) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the general level of precision twist and twist dimensions, material and hardness, appearance and surface roughness, logo and packaging technology requirements. This standard applies by GB/T 6135. 1 ~ 6135. 4 and GB/T 1438. 1 ~ 1438. 4 twist manufactured by various processes (rolling process is not suitable for the manufacture of precision grade twist). According to the agreement between the twist can also refer to other uses. This standard does not apply to self -occupied and twist drills. |
GB/T 17984-2010: Twist drills -- Technical specifications---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Twist drills. Technical specifications
ICS 25.100.30
J41
National Standards of People's Republic of China
Replacing GB/T 17984-2000
Twist technical conditions
Issued on. 2010-11-10
2011-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard replaces GB/T 17984-2000 "Twist technical conditions."
This standard and GB/T 17984-2000 compared to the main changes are as follows.
--- Modify the normative references, cancel the normative references cited in the standard year;
--- Revised 4.2 twist drill diameter working part taper down. To "0.02mm ~ 0.08mm" every length to 100mm
"0.02mm ~ 0.12mm";
--- Revised 4.3, "its shank diameter tolerance f11" be replaced by "its shank diameter tolerance allowed for the f11";
--- Revised 4.5, "on the next adjacent basic dimensions twist length" with the words "on the basic scale within the next adjacent twist length
Inch";
--- Modify the general level 4.9.1 twist groove indexing error in Figure 6;
--- Revised 4.11, twist drill core allowed increment "Allow" to "should";
--- Amend 4.12, increasing the general level of twist blade width of 9 and notes, and an increase in the formula in Appendix B. will
Precision Twist Drill primary blade width of 9 to 10;
--- Revised 5.1, high speed steel does not set specific grade;
--- 5.3.2 revised working part hardness, 5.3.3 whole twist drill shank hardness, hardness 5.3.4 taper flat tail, the original HV
Increased hardness HRC hardness basis;
--- Added Appendix B, all the charts and formulas under all moved to Appendix B in the formula and unified index is a decimal
Three significant number of points.
According to GB/T 17984-2000 "Twist technical conditions" amendments No. 1, to read as follows.
--- 5.3.2, "790HV ~ 900HV" to "780HV ~ 900HV";
--- Appendix A, Table A.1 No. 3, "the central contact against the cutting edge," to "close contact against the cutting corner
Edge on. "
The Standard Appendix A, Appendix B are informative appendices.
The standard proposed by China Machinery Industry Federation.
This standard tool by the National Standardization Technical Committee (SAC/TC91) centralized.
This standard is drafted by. Shanghai Tool Works Co., Ltd., Chengdu Tool Research Institute, Chengdu into a tool Group Co., Ltd., a Henan
Tools Co., Ltd., Beijing Capital Industrial Logistics Limited.
The main drafters of this standard. Li Zheng Wei, Chen Liping, Chen Shichang, Zhao Jianmin, Chen Lun, Fan Yingjie.
This standard replaces the standards previously issued as follows.
--- GB/T 17984-2000.
Twist technical conditions
1 Scope
This standard specifies the general level of precision twist and twist size, material and hardness, appearance and surface roughness, marking and packaging
Technical requirements.
This standard applies to press GB/T 6135.1 ~ 6135.4 and twist GB/T 1438.1 ~ 1438.4 with a variety of manufacturing process (rolling
Molding process suitable for manufacturing precision twist), according to the agreement between, can also refer to the use of other twist. This standard does not apply to wood
Workers drilling and homemade own twist.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 1438.1 taper shank twist drills - Part 1. Morse taper shank twist types and dimensions
GB/T 1438.2 taper shank twist drills - Part 2. Morse taper shank long series twist types and dimensions
GB/T 1438.3 taper shank twist drills - Part 3. Morse taper shank twist drills lengthened types and dimensions
GB/T 1438.4 taper shank twist drills - Part 4. Morse taper shank long twist types and dimensions
GB/T 1443 used machine tools and tool shank taper from folder
GB/T 1804 General tolerances Tolerances for linear and angular dimensions without individual tolerance
GB/T 6135.1 straight shank twist drills - Part 1. coarse straight shank types and dimensions small twist
GB/T 6135.2 straight shank twist drills - Part 2. Straight shank twist drill short and straight shank twist types and dimensions
GB/T 6135.3 straight shank twist drills - Part 3. shank long twist drill types and dimensions
GB/T 6135.4 straight shank twist drills - Part 4. Straight shank long twist drill types and dimensions
3 Symbol
d twist drill diameter
Total length l
l1 length of the channel
Radial δr working part of the shank axis runout
δk core drilling on the symmetry axis of the working part
δh oblique cutting edge runout of the working portion axis
δd trench indexing error
Kmin minimum web thickness
Recommended values \u200b\u200bof the land width fG
Upper limit fU blade width of
Lower limit fL width of the blade
4 Dimensions
4.1 twist drill diameter tolerance according to GB/T 6135.1 ~ 6135.4 and GB/T 1438.1 - 1438.4 of the regulations.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17984-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 17984-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 17984-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17984-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 17984-2010?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17984-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|