HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 17215.352-2009 English PDF

US$334.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 17215.352-2009: Electricity metering equipment (AC) -- Particular requirements -- Part 52: Symbols
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 17215.352-2009English334 Add to Cart 3 days [Need to translate] Electricity metering equipment (AC) -- Particular requirements -- Part 52: Symbols Valid GB/T 17215.352-2009

PDF similar to GB/T 17215.352-2009


Standard similar to GB/T 17215.352-2009

GB/T 15284   GB/T 17215.321   GB/T 34067.2   GB/T 17215.241   GB/T 17215.302   GB/T 17215.686   

Basic data

Standard ID GB/T 17215.352-2009 (GB/T17215.352-2009)
Description (Translated English) Electricity metering equipment (AC) -- Particular requirements -- Part 52: Symbols
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard N22
Classification of International Standard 17.220.20
Word Count Estimation 17,142
Date of Issue 2009-11-15
Date of Implementation 2010-02-01
Older Standard (superseded by this standard) GB/T 17441-1998
Quoted Standard GB/T 5465.2-2008; GB/T 17215.211-2006; IEC 60211
Adopted Standard IEC 62053-52-2005, IDT
Regulation (derived from) Announcement of Newly Approved National Standards No. 13 of 2009 (No. 153 overall)
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the flag and the identification of electromechanical or static AC power meter and its attachments used text and graphics special number, and identification signs for electromechanical or static AC power meter and its attachments. Symbol specified in this part shall be marked on the nameplate, dials, an external label or accessories, or in an appropriate manner shown on the instrument display.

GB/T 17215.352-2009: Electricity metering equipment (AC) -- Particular requirements -- Part 52: Symbols


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electricity metering equipment (AC) .Particular requirements.Part 52. Symbols ICS 17.220.20 N22 National Standards of People's Republic of China GB/T 17215.352-2009/IEC 62053-52.2005 Replacing GB/T 17441-1998 AC measuring equipment - Specific requirements Part 52. Symbols (IEC 62053-52.2005, IDT) Posted 2009-11-15 2010-02-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ Introduction Ⅴ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 measuring element symbols 2 5 meter basic unit with 4 symbols 6 is measured mark 4 7 shows the level of accuracy, meter constants and symbols insulation class 5 8 meter working by transformer 6 Symbol The symbol rate of 9 7 10 auxiliary device symbol 8 Symbol support member 11 of the movable member 8 12 warning sign 8 Appendix A (normative) communication port symbol 9 Reference 10 Table 1 Symbol 2 measuring element Table 2 meter by 4 basic unit symbol Table 3 is measured mark (example) 5 Table 4 shows the level of accuracy, meter constant and insulation class symbol (example) 5 Table 5 meter working by transformer symbol (example) 6 Table 6 tariff device symbol (example) 7 Table 7 auxiliary device symbol (example) 8 Table 8 movable support member 8 symbols Table A. Communication port symbol (example) 9 GB/T 17215.352-2009/IEC 62053-52.2005

Foreword

GB/T 17215 series of standards is made up of several-part, GB/T 17215 in the "AC measuring equipment - Specific requirements" by the The following components. --- Part 11. Electromechanical meters for active energy (0.5, 1 and Level 2) (GB/T 17215.311) --- Part 12. Mechanical reactive energy (classes 2 and 3) (GB/T 17215.312) --- Part 21. Static meters for active energy (classes 1 and 2) (GB/T 17215.321) --- Part 22. Static meters for active energy (0.2S and 0.5S grade level) (GB/T 17215.322) --- Part 23. Static reactive energy (classes 2 and 3) (GB/T 17215.323) --- Part 24. Static Apparent energy meter (1 and 2) (GB/T 17215.324) --- Part 31. Electromechanical and electronic meter pulse output means (stage 2) (GB/T 17215.331) --- Part 35. Energy consumption and demand telemetry (GB/T 17215.335) --- Part 41. Electromechanical maximum demand indicator (1.0) (GB/T 17215.341) --- Part 42. Multi-tariff and maximum demand of counters and (GB/T 17215.342) --- Part 51. tariff device auxiliary terminal flag (GB/T 17215.351) --- Part 52. Symbols (GB/T 17215.352) --- Part 61. Power consumption and voltage requirements (GB/T 17215.361) This section GB/T Part of 5,217,215. This section identical with IEC 62053-52.2005 "AC measuring equipment - Specific requirements - Part 52. Symbols." For ease of use, this section made the following editorial changes. a) with a decimal point '. 'Instead of a comma as the decimal point,' '; b) Remove the preface to the international standards. This Part replaces GB/T 17441-1998 "AC power meter mark." This section compared with the GB/T 17441-1998, the main changes are as follows. --- This section follow GB/T 1.1-2000 requirements in the preparation of the format; --- This part of the name changed to "AC measuring equipment - Specific requirements - Part 52. Symbols"; --- Remove the 11 terms and definitions. inductive meter, static meter, watt-hour meter, reactive power meter, Apparent power Degree table, multi-rate meter, maximum demand meter, memory, display, counters and constant; --- Fitted with an increase of 8.5 meter and a half of the primary energy meter (nominal value of the primary current can be changed) in Table 5; --- In Table 6, an increase of 9.11; --- Remove Appendix B; --- Increased by reference. --- Increased introduction, to facilitate users to understand the GB/T 17215 standard corresponding international standard IEC 62051 ~ IEC 62059 standard Registration system and numbering. This section of Appendix A normative appendix. This part is proposed by China Machinery Industry Federation. This part of the National Electrical Instrument Standardization Technical Committee (SAC/TC104) centralized. This section is drafted. Harbin Electrical Instrument Research Institute, Shanghai EF Electronics Technology Co., Ltd., Zhejiang Chint Instrument Co. GB/T 17215.352-2009/IEC 62053-52.2005 Ltd., Solarfun Electronics Co., Ltd., Changsha Weisheng Electronics Co., Ltd., Shenzhen Clou Electronics Co., Ltd., Hangzhou PAX Electronic Technology Limited. The main drafters of this section. Yuan Chuang Hui Xue Jin Tak, Lin Jie, Leihui Bo, strict order and good, Xiong Lanying, Chenke Chang, Han Dong, Xu forest. This part replaces the standards previously issued as follows. --- GB/T 17441-1998. GB/T 17215.352-2009/IEC 62053-52.2005

Introduction

GB/T 17215 series of standards adopted basic IEC /T C13 international standard "energy measurement and load control equipment". Our reference IEC /T C13 standard structure developed with the corresponding energy measurement and load control standard system. After adjustment of IEC /T C13 standard Registration system will be based on their different categories, different objects and common technical requirements and particularity were incorporated into IEC 62051 ~ IEC 62059 total 9 Subdivision. IEC 62051 electrical measurement terms IEC 62052 General requirements AC measuring equipment IEC 62053 AC measuring equipment - Specific requirements IEC 62054 AC measurement equipment tariff and load control - Particular requirements IEC 62055 electrical measuring payment vending system IEC 62056 electrical measuring meter reading, tariff and load control of data exchange IEC 62057 electrical measurement test equipment IEC 62058 AC measuring equipment acceptance testing IEC 62059 AC measuring equipment credibility IEC 62053 AC measuring equipment - Specific requirements. Of the series of international standards into national standards numbering principles and methods of the process of national standards identified in the followings. The total number IEC /T C13 "energy measurement and load control equipment" corresponds to our standards. GB/T 17215. Each sub-section number Do as follows. IEC 62051 "Electrical measuring term" corresponds to GB/T 17215.1XX ( "1" represents IEC 62051, "XX" denotes the parts) IEC 62052 "General requirements AC measuring equipment" (GB/T 17215.2XX, "2" represents IEC 62052, "XX" represents the first of several section) IEC 62053 "AC measuring equipment - Specific requirements" (GB/T 17215.3XX, "3" represents IEC 62053, "XX" represents the first of several section) IEC 62054 "AC measuring equipment tariff and load control - Particular requirements" (GB/T 17215.4XX, "4" expressed IEC 62054, "XX" denotes the parts) IEC 62055 "Electrical measuring payment vending system" (GB/T 17215.5XX, "5" indicates IEC 62055, "XX" represents the first of several portions Minute) IEC 62056 "Electrical measuring meter reading, tariff and load control data exchange" (GB/T 17215.6XX, "6" represents IEC 62056, "XX" denotes the parts) IEC 62057 "Electrical Measurement Test Equipment" (GB/T 17215.7XX, "7" represents IEC 62057, "XX" denotes the parts) IEC 62058 "AC measuring equipment acceptance test" (GB/T 17215.8XX, "8" represents IEC 62058, "XX" represents the first of several section) IEC 62059 "AC measuring equipment credibility" (GB/T 17215.9XX, "9" represents IEC 62059, "XX" represents the first of several section) GB/T 17215 series of standards has been released in eight sections. GB/T 17215.211-2006 AC measuring equipment General requirements, tests and test conditions Part 11. measuring equipment (IEC 62052-11.2003, IDT) GB/T 17215.301-2007-Meter special requirements GB/T 17215.311-2008 AC measuring equipment - Specific requirements - Part 11. Electromechanical meters for active energy (0.5, 1 and GB/T 17215.352-2009/IEC 62053-52.2005 Level 2) (IEC 62053-11.2003, MOD) GB/T 17215.321-2008 AC measuring equipment - Specific requirements - Part 21. Static meters for active energy (1 and 2) (IEC 62053-21.2003, IDT) GB/T 17215.322-2008 AC measuring equipment - Specific requirements Part 22. Static meters for active energy (0.2S level And 0.5S level) (IEC 62053-22.2003, IDT) GB/T 17215.323-2008 AC measuring equipment - Specific requirements - Part 23. Static reactive power meter (level 2 and Level 3) (IEC 62053-23.2003, IDT) GB/T 17215.352-2009 AC measuring equipment - Specific requirements Part 52. Symbols (IEC 62053-52.2005, IDT) GB/T 17215.421-2008 AC measurement equipment tariff and load control Part 21. Particular requirements for time switches (IEC 62054-21.2004, IDT) GB/T 17215.352-2009/IEC 62053-52.2005 AC measuring equipment - Specific requirements Part 52. Symbols

1 Scope

GB/T 17215 provisions of this part of the mark and identification electromechanical or static AC power meter and attachments used in the text and Graphic symbols for marking and identification of electromechanical or static AC power meter and its attachments. Symbols specified in this part shall be marked on the nameplate or accessory, dials, external label, or in an appropriate manner to display in the instrument was Shown on.

2 Normative references

The following documents contain provisions which, through reference GB/T 17215 in this section constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section. GB/T 5465.2-2008 Graphical symbols for electrical equipment - Part 2. Graphical symbols (IEC 60417DB.2007, IDT) GB/T 17215.211-2006 AC measuring equipment General requirements, tests and test conditions Part 11. measuring equipment (IEC 62052-11.2003, IDT) IEC 60211 1.0 Ji maximum demand indicator

3 Terms and Definitions

GB/T 17215.211-2006 established as well as the following terms and definitions apply to this section. 3.1 Excess energy to measure the power over a pre-determined value of the instrument. [GB/T 2900.79-2008, the definition 311-06-07] 3.2 In a suitable manner indicates a continuous period of time equal to the maximum average power meter intervals. [GB/T 2900.79-2008, the definition 311-06-08] 3.3 For metering the electricity meter in both directions. 3.4 Counters and work through the transformer meter. It included all the instruments connected transformers (voltage and current transformers) turns ratio. Note. The value of the transformer primary side of the power may be obtained directly from the counters and readings. 3.5 Counters and work through the transformer meter. It included or current transformer ratio, or included in the voltage transformer turns ratio, but not GB/T 17215.352-2009/IEC 62053-52.2005

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 17215.352-2009_English be delivered?

Answer: Upon your order, we will start to translate GB/T 17215.352-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 17215.352-2009_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 17215.352-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information