|
US$169.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 15945-2008: Power quality -- Frequency deviation for power system Status: Valid GB/T 15945: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 15945-2008 | English | 169 |
Add to Cart
|
3 days [Need to translate]
|
Power quality -- Frequency deviation for power system
| Valid |
GB/T 15945-2008
|
| GB/T 15945-1995 | English | 199 |
Add to Cart
|
2 days [Need to translate]
|
Quality of electric energy supply. Permissible deviation of frequency for power system
| Obsolete |
GB/T 15945-1995
|
PDF similar to GB/T 15945-2008
Basic data | Standard ID | GB/T 15945-2008 (GB/T15945-2008) | | Description (Translated English) | Power quality -- Frequency deviation for power system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F20 | | Classification of International Standard | 27.010 | | Word Count Estimation | 7,753 | | Date of Issue | 2008-06-18 | | Date of Implementation | 2009-05-01 | | Older Standard (superseded by this standard) | GB/T 15945-1995 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 11 of 2008 (No. 124 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the nominal frequency of 50Hz power system frequency deviation limits, and the passing rate measurement statistical methods. This standard does not apply to electrical equipment frequency deviation limits. |
GB/T 15945-2008: Power quality -- Frequency deviation for power system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Power quality. Frequency deviation for power system
ICS 27.010
F20
National Standards of People's Republic of China
Replacing GB/T 15945-1995
Power quality power system frequency deviation
Posted 2008-06-18
2009-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard replaces GB/T 15945-1995 "Power quality power system frequency tolerance."
This standard and GB/T 14945-1995 compared to the main changes are as follows.
--- Standard name changed to "power quality power system frequency deviation";
--- Increasing the term "nominal frequency of 2.1";
--- The original standard "4 measuring instrument" to expand and refine the content, the words "4 frequency deviation measurement";
--- Delete the original standard "frequency variation 2.2";
--- Original standard frequency deviation caused by the impact load limit on moves to Appendix A;
--- Added Appendix B "frequency pass rate statistics."
This standard Annex A, Annex B normative appendix.
The standard voltage and current rating by the National Standardization Technical Committee and the frequency and focal points.
This standard was drafted. China Electric Power Research Institute, the State Grid Corporation of China National Power Dispatching and Communication Center, the machine in Productivity
Heart, Harbin Electrical Instrument Research Institute, Guodian Longyuan Electric Power Engineering Co., Ltd., Shanghai Electric Institute of Science (Group) Co.,
the company.
The main drafters of this standard. Pan Yan, Zhuwei Jiang, Liu Xun, Lin snow, according to Li Yang, Yu Kunshan, Wangming Ren, Ma Yong, Li Songjie.
This standard replaces the standards previously issued as follows.
--- GB/T 15945-1995.
Power quality power system frequency deviation
1 Scope
This standard specifies a nominal frequency of 50Hz power system frequency deviation limits, measurements and statistical methods of passing rate.
This standard does not apply to the frequency deviation limits for electrical equipment.
2 Terms and definitions
The following terms and definitions apply to this standard.
2.1
System design selected frequency.
2.2
Difference between the actual value and the nominal value of the system frequency.
2.3
Production (or run) during cyclic or acyclic access to rapid changes in load power from the grid.
2.4
Actual operating frequency deviation of percentage of the total run time statistics with the corresponding time limits within accumulated operation.
3 frequency deviation limit
3.1 Power frequency deviation limit under normal operating conditions, the system is ± 0.2Hz. When the system capacity is small, the deviation limit can be relaxed to
± 0.5Hz.
Frequency deviation caused by the impact load limit of 3.2 of this standard, see Appendix A.
3.3 statistical methods in power system frequency pass rate of this standard, see Appendix B.
4 measuring frequency deviation
Measurement frequency deviation of 4.1
Measuring grid fundamental frequency, each taking 1s, 3s or 10s in the interval meter to integer integer cycle accumulation period of time than (and
1s, 3s or 10s overlapping single clock cycle should be discarded). Measurement interval do not overlap each 1s, 3s or 10s interval should be in 1s,
3s or 10s at the start of the count clock. This standard does not exclude a more advanced method of measuring the frequency of use.
4.2 Instrument accuracy
Measurement error shall not exceed ± 0.01Hz.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 15945-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 15945-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 15945-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 15945-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 15945-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15945-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|