|
US$209.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 15318-2010: Monitoring and testing for energy saving of heat treatment electric furnace Status: Valid GB/T 15318: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 15318-2010 | English | 209 |
Add to Cart
|
3 days [Need to translate]
|
Monitoring and testing for energy saving of heat treatment electric furnace
| Valid |
GB/T 15318-2010
|
| GB/T 15318-1994 | English | 239 |
Add to Cart
|
2 days [Need to translate]
|
Monitoring and testing method for energy saving of electroheat furnace in industrial heat treating
| Obsolete |
GB/T 15318-1994
|
PDF similar to GB/T 15318-2010
Basic data | Standard ID | GB/T 15318-2010 (GB/T15318-2010) | | Description (Translated English) | Monitoring and testing for energy saving of heat treatment electric furnace | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 9,974 | | Date of Issue | 2010-11-10 | | Date of Implementation | 2011-02-01 | | Older Standard (superseded by this standard) | GB/T 15318-1994 | | Quoted Standard | GB/T 10066.1-2004; GB/T 10066.4-2004; GB/T 10201-2008; GB/T 13324-2006; GB/T 17358-2009 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 8 of 2010 (total 163) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the monitoring of heat treatment furnace energy monitoring content, monitoring methods and assessment indicators. This standard applies to periodic and continuous furnace. This standard does not apply to induction heating and plasma heating equipment such as energy monitoring. |
GB/T 15318-2010: Monitoring and testing for energy saving of heat treatment electric furnace---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Monitoring and testing for energy saving of heat treatment electric furnace
ICS 27.010
F01
National Standards of People's Republic of China
Replacing GB/T 15318-1994
Heat treatment furnace energy monitoring
Issued on. 2010-11-10
2011-02-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard replaces GB/T 15318-1994 "industrial heat treatment furnace energy-monitoring methods."
This standard compared with GB/T 15318-1994, the main changes are as follows.
--- Standard name to read. "heat treatment furnace energy monitoring";
--- Adjust and standardize the "scope" one chapter (see Chapter 1);
--- Standardized "Normative references" quotations, adjusted normative document reference level (see Chapter 2);
--- Added "empty furnace power loss ratio" is defined (see Chapter 3, 3.2);
--- Increasing the terms and tables (see 4.3,4.4,5.7,5.8 table 3,6.3,6.4);
--- Cancel the original standard of Tables 1 and 3;
--- Original standard "K2 product (workpiece) Category conversion coefficient" is adjusted to current standard "K1 product (workpiece) material conversion process
Factor ", while adjusting the original standard bar Table 2 (see 5.4.3 Table 1);
--- Original standard "K4 heat treatment process of conversion coefficient" is adjusted to current standard "K2 commonly used heat treatment process conversion coefficient" (see
5.4.3, Table 2);
--- 6.1 commonly used in heat treatment furnace provided a clear "bk" value;
--- Adjust the original standard table 5 furnace, rated temperature and surface temperature rise (see Table 4);
--- Energy monitoring standardized reporting format (see Appendix A).
Appendix A of this standard is a normative appendix.
This standard by the National Standardization Technical Committee for Energy and management proposed.
This standard by the National Standardization Technical Committee Sub-Committee on Energy Management and Energy Management.
This standard is mainly drafted by. East of Jiangsu Feng Technology Co., Ltd., Guangdong Siltronic Metal Technology Co., Ltd., Beijing Electromechanical Research
The Chinese Society of Mechanical Engineering Branch of the heat treatment.
The main drafters of this standard. FAN Dong-li, the Jianhua, Dong Xiaohong, Liu Su people, Chen Zhiqiang, Gulin Lin.
This standard replaces the standards previously issued as follows.
--- GB/T 15318-1994.
Heat treatment furnace energy monitoring
1 Scope
This standard specifies the content monitoring heat treatment furnace energy monitoring, monitoring methods and assessment indicators.
This standard applies to periodic and continuous furnace.
This standard does not apply to energy monitoring induction heating and plasma heating and other equipment.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 10066.1-2004 Test methods for electroheat installations - Part 1. General section
GB/T 10066.4-2004 Test methods for electric equipment - Part 4. Indirect resistance furnaces
GB/T 10201-2008 rational use of electricity heat treatment guidelines
GB/T 13324-2006 term heat treatment equipment
GB/T 17358-2009 heat treatment power consumption calculation and measurement method
3 Terms and Definitions
GB/T 10201-2008 and GB/T 13324-2006 established in the following terms and definitions apply to this standard.
3.1
Comparable products of electricity consumption comparableelectricityconsumptionofunitproduct
Depending on the heat treatment products and processes, according to the relevant provisions of the production of qualified products translated into comparable standard product (reduced mass), namely,
Operators arrive at the actual power consumption and the production of quality products equivalent ratio. Units of kilowatt-hours per kilogram (kW · h/kg).
3.2
Air furnace power loss ratio powerratioofnoloadloss
The percentage of empty furnace power loss (P0) with a rated power (PC), see formula (1).
R = P0/PC × 100% (1)
4 heat treatment furnace energy monitoring project
4.1 Comparable products of electricity consumption
4.2 furnace surface temperature
4.3 Air furnace heating time
4.4 air furnace power loss ratio
5 heat treatment furnace energy monitoring method
5.1 Test conditions
Testing should be carried out in normal operating conditions of production in an electric furnace.
5.2 Testing time
Monitoring a production test time period.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 15318-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 15318-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 15318-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 15318-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 15318-2010?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15318-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|