| US$579.00 · In stockDelivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
 GB/T 14598.8-2008: Electrical relays -- Part 20: Protection systems
 Status: Valid
 GB/T 14598.8: Evolution and historical versions
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |  
			| GB/T 14598.8-2008 | English | 579 | Add to Cart | 5 days [Need to translate] | Electrical relays -- Part 20: Protection systems | Valid | GB/T 14598.8-2008 |  
			| GB/T 14598.8-1995 | English | 879 | Add to Cart | 4 days [Need to translate] | Electrical relays. Part 20: Protection (protective) systems | Obsolete | GB/T 14598.8-1995 |  
	 
       PDF similar to GB/T 14598.8-2008 
 Basic data             | Standard ID | GB/T 14598.8-2008 (GB/T14598.8-2008) |           | Description (Translated English) | Electrical relays -- Part 20: Protection systems |           | Sector / Industry | National Standard (Recommended) |           | Classification of Chinese Standard | K45 |           | Classification of International Standard | 29.120.70 |           | Word Count Estimation | 25,256 |           | Date of Issue | 2008-06-18 |           | Date of Implementation | 2009-03-01 |           | Older Standard (superseded by this standard) | GB/T 14598.8-1995 |           | Adopted Standard | IEC 60255-20-1984, MOD |           | Regulation (derived from) | Announcement of Newly Approved National Standards No. 10 of 2008 (total 123) |           | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |           | Summary | This standard specifies the entire protection system and its components, performance requirements. This section applies to protection system protection devices and equipment connected with the protection of an impact on its performance of the device. This section applies to the following objects: protection system or its components manufacturer, protection system users, control panel factory, electrical equipment installers, consulting engineer. IEC standard specifies different components of the system to protect the technical requirements of the relevant part of this section references prepare these standards. | GB/T 14598.8-2008: Electrical relays -- Part 20: Protection systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Electrical relays Part 20. Protection systems
ICS 29.120.70
K45
National Standards of People's Republic of China
Replacing GB/T 14598.8-1995
Electrical relays - Part 20. Protection System
(IEC 60255-20. 1984, MOD)
Posted 2008-06-18
2009-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
 Table of ContentsIntroduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
4 protection system used in instrument transformers 3
5 AC input excitation circuit 4
6 auxiliary power supply 4
Trip and closing circuit 7 5
8 logic circuit 5
9 protection system communication link requirement 5
10 signal indicates 6
11 6 insulation
12 Ground 7
13 general performance and test requirements 7
14 Test 9
Appendix A (informative) protection system block 12
And transient characteristics of Annex B (informative) Response of the current transformer protection performance of the device 13
Annex C (informative) auxiliary power protection device 14
Annex D (informative) auxiliary circuit ground 15
Annex E (informative) protection against external disturbance 16
Annex F (informative) trip and close circuit 17
Annex G (informative) instrument transformers grounded 18ForewordThe partial modification of international standard IEC 60255-20. 1984 "Electrical relays - Part 20. Protection System" (in English).
For ease of use, this section made the following editorial changes.
a) 'this International Standard' to replace the word 'this section';
b) with a decimal point '. 'Instead of as a decimal point,' ';
c) Remove the preface to international standards.
This Part replaces GB/T 14598.8-1995 "Electrical relays - Part 20. Protection System."
Section compared with the GB/T 14598.8-1995 The main changes are as follows.
--- Added "Normative References" chapter and referenced standards;
--- Appendix B Note 2 to 3 °;
--- Remove the Appendix H.
This section of the Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G is an informative annex.
This part is proposed by the China Electrical Equipment Industrial Association.
The measure in part by the National Standardization Technical Committee centralized relays and protection equipment.
This part mainly drafted by. Jicheng Electronics Co., Xuchang Relay Research Institute, XJ Electric Co., Ltd., Nanjing South
Swiss Relays Electric Co., Ltd., Beijing Sifang Automation Co., Ltd., Guodian Nanjing Automation Co., Ltd., Beijing Purple measured
Control Limited.
The main drafters of this section. Guang Yuan Wen, Li Zhiyong, Zhang deep, Wen Jifeng, Liu Jianfei, Liu Xiao Meng, Hu Jia is.
This part of the standard replaces the previous editions are.
--- GB/T 14598.8-1995.
Electrical relays - Part 20. Protection System1 ScopeGB/T 14598 provisions of this part of the whole protection system and each part of the composition of performance requirements.
This section applies to the protection of the system and its performance impact protection devices and protective devices connected to it.
This section applies to the following objects.
--- Protection system or its components manufacturer;
--- User protection system;
--- Control panel factory;
--- Electrical equipment installers;
--- Consultant engineer.
Different IEC standard specifies the technical requirements for the various components of the protection system, prepare the relevant parts of this section refers to these standards.
Appendix A lists a block diagram of a protection system, the figure also shows the development of the various components of the system to protect the relevant technical specifications
IEC technical committees.
Decided to recommend that the user should be made consistent with the provisions related to the technical committees, these technical committees of the whole protection system
Be responsible for.2 Normative referencesThe following documents contain provisions which, through reference GB/T 14598 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 2900.49-2004 Electrotechnical terminology - Power System Protection (IEC 60050-448.1995, IDT)
GB 1207-2006 electromagnetic voltage transformer (IEC 60044-2.2003, MOD)
GB 1208-2006 current transformers (IEC 60044-1.2003, MOD)
GB/T 8367 Measuring relays and protection equipment and auxiliary energizing quantity interrupt AC component (ripple) (GB/T 8367-1987,
eqv IEC 60255-11. 1980)
GB/T 14047 for measuring relays and protection equipment (GB/T 14047-1993, idt IEC 60255. 1988)
GB/T 14598.1 Electrical relays - Part 23. Contact performance (GB/T 14598.1-2002, IEC 60255-23.1994,
IDT)
GB/T 14598.3-2006 Electrical relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and tests
(IEC 60255-5.2000, IDT)
GB/T 14598.7 Electrical relays - Part 3. dependent or independent time Single input energizing quantity measuring relays
(GB/T 14598.7-1995, idt IEC 60255-3. 1989)
GB/T 14598.13 Electrical relays - Part 22-1. Electrical disturbance tests for measuring relays and protection equipment --- 1MHz
Burst immunity test (GB/T 14598.13-2008, IEC 60255-22-1.2007, MOD)
GB/T 15166 (all parts) AC high voltage circuit breakers
 
 Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 14598.8-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 14598.8-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 14598.8-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 14598.8-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries Question 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected] . In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 14598.8-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 14598.8-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.    |