HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 14598.8-2008 English PDF

US$579.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 14598.8-2008: Electrical relays -- Part 20: Protection systems
Status: Valid

GB/T 14598.8: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 14598.8-2008English579 Add to Cart 5 days [Need to translate] Electrical relays -- Part 20: Protection systems Valid GB/T 14598.8-2008
GB/T 14598.8-1995English879 Add to Cart 4 days [Need to translate] Electrical relays. Part 20: Protection (protective) systems Obsolete GB/T 14598.8-1995

PDF similar to GB/T 14598.8-2008


Standard similar to GB/T 14598.8-2008

DL/T 540   GB/T 38953   GB/T 37155.2   GB/T 14598.26   GB/T 14598.27   GB/T 14598.2   

Basic data

Standard ID GB/T 14598.8-2008 (GB/T14598.8-2008)
Description (Translated English) Electrical relays -- Part 20: Protection systems
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K45
Classification of International Standard 29.120.70
Word Count Estimation 25,256
Date of Issue 2008-06-18
Date of Implementation 2009-03-01
Older Standard (superseded by this standard) GB/T 14598.8-1995
Adopted Standard IEC 60255-20-1984, MOD
Regulation (derived from) Announcement of Newly Approved National Standards No. 10 of 2008 (total 123)
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the entire protection system and its components, performance requirements. This section applies to protection system protection devices and equipment connected with the protection of an impact on its performance of the device. This section applies to the following objects: protection system or its components manufacturer, protection system users, control panel factory, electrical equipment installers, consulting engineer. IEC standard specifies different components of the system to protect the technical requirements of the relevant part of this section references prepare these standards.

GB/T 14598.8-2008: Electrical relays -- Part 20: Protection systems

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electrical relays Part 20. Protection systems ICS 29.120.70 K45 National Standards of People's Republic of China Replacing GB/T 14598.8-1995 Electrical relays - Part 20. Protection System (IEC 60255-20. 1984, MOD) Posted 2008-06-18 2009-03-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 2 4 protection system used in instrument transformers 3 5 AC input excitation circuit 4 6 auxiliary power supply 4 Trip and closing circuit 7 5 8 logic circuit 5 9 protection system communication link requirement 5 10 signal indicates 6 11 6 insulation 12 Ground 7 13 general performance and test requirements 7 14 Test 9 Appendix A (informative) protection system block 12 And transient characteristics of Annex B (informative) Response of the current transformer protection performance of the device 13 Annex C (informative) auxiliary power protection device 14 Annex D (informative) auxiliary circuit ground 15 Annex E (informative) protection against external disturbance 16 Annex F (informative) trip and close circuit 17 Annex G (informative) instrument transformers grounded 18

Foreword

The partial modification of international standard IEC 60255-20. 1984 "Electrical relays - Part 20. Protection System" (in English). For ease of use, this section made the following editorial changes. a) 'this International Standard' to replace the word 'this section'; b) with a decimal point '. 'Instead of as a decimal point,' '; c) Remove the preface to international standards. This Part replaces GB/T 14598.8-1995 "Electrical relays - Part 20. Protection System." Section compared with the GB/T 14598.8-1995 The main changes are as follows. --- Added "Normative References" chapter and referenced standards; --- Appendix B Note 2 to 3 °; --- Remove the Appendix H. This section of the Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G is an informative annex. This part is proposed by the China Electrical Equipment Industrial Association. The measure in part by the National Standardization Technical Committee centralized relays and protection equipment. This part mainly drafted by. Jicheng Electronics Co., Xuchang Relay Research Institute, XJ Electric Co., Ltd., Nanjing South Swiss Relays Electric Co., Ltd., Beijing Sifang Automation Co., Ltd., Guodian Nanjing Automation Co., Ltd., Beijing Purple measured Control Limited. The main drafters of this section. Guang Yuan Wen, Li Zhiyong, Zhang deep, Wen Jifeng, Liu Jianfei, Liu Xiao Meng, Hu Jia is. This part of the standard replaces the previous editions are. --- GB/T 14598.8-1995. Electrical relays - Part 20. Protection System

1 Scope

GB/T 14598 provisions of this part of the whole protection system and each part of the composition of performance requirements. This section applies to the protection of the system and its performance impact protection devices and protective devices connected to it. This section applies to the following objects. --- Protection system or its components manufacturer; --- User protection system; --- Control panel factory; --- Electrical equipment installers; --- Consultant engineer. Different IEC standard specifies the technical requirements for the various components of the protection system, prepare the relevant parts of this section refers to these standards. Appendix A lists a block diagram of a protection system, the figure also shows the development of the various components of the system to protect the relevant technical specifications IEC technical committees. Decided to recommend that the user should be made consistent with the provisions related to the technical committees, these technical committees of the whole protection system Be responsible for.

2 Normative references

The following documents contain provisions which, through reference GB/T 14598 in this section constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section. GB/T 2900.49-2004 Electrotechnical terminology - Power System Protection (IEC 60050-448.1995, IDT) GB 1207-2006 electromagnetic voltage transformer (IEC 60044-2.2003, MOD) GB 1208-2006 current transformers (IEC 60044-1.2003, MOD) GB/T 8367 Measuring relays and protection equipment and auxiliary energizing quantity interrupt AC component (ripple) (GB/T 8367-1987, eqv IEC 60255-11. 1980) GB/T 14047 for measuring relays and protection equipment (GB/T 14047-1993, idt IEC 60255. 1988) GB/T 14598.1 Electrical relays - Part 23. Contact performance (GB/T 14598.1-2002, IEC 60255-23.1994, IDT) GB/T 14598.3-2006 Electrical relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and tests (IEC 60255-5.2000, IDT) GB/T 14598.7 Electrical relays - Part 3. dependent or independent time Single input energizing quantity measuring relays (GB/T 14598.7-1995, idt IEC 60255-3. 1989) GB/T 14598.13 Electrical relays - Part 22-1. Electrical disturbance tests for measuring relays and protection equipment --- 1MHz Burst immunity test (GB/T 14598.13-2008, IEC 60255-22-1.2007, MOD) GB/T 15166 (all parts) AC high voltage circuit breakers

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 14598.8-2008_English be delivered?

Answer: Upon your order, we will start to translate GB/T 14598.8-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 14598.8-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 14598.8-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 14598.8-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 14598.8-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information