HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 14598.11-2011 English PDF

US$439.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 14598.11-2011: Measuring relays and protection equipment -- Part 11: Voltage dips, short interruptions, variations and ripple on auxiliary power supply port
Status: Obsolete

GB/T 14598.11: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 14598.11-2011English439 Add to Cart 3 days [Need to translate] Measuring relays and protection equipment -- Part 11: Voltage dips, short interruptions, variations and ripple on auxiliary power supply port Obsolete GB/T 14598.11-2011
GB/T 14598.11-1997English719 Add to Cart 3 days [Need to translate] Electrical relays. Part 19: Sectional specification. Electromechanical all-or-nothing relays of assessed quality Obsolete GB/T 14598.11-1997

PDF similar to GB/T 14598.11-2011


Standard similar to GB/T 14598.11-2011

DL/T 540   GB/T 38953   GB/T 37155.2   GB/T 14598.26   GB/T 14598.2   GB/T 14598.2   

Basic data

Standard ID GB/T 14598.11-2011 (GB/T14598.11-2011)
Description (Translated English) Measuring relays and protection equipment -- Part 11: Voltage dips, short interruptions, variations and ripple on auxiliary power supply port
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K45
Classification of International Standard 29.120.70
Word Count Estimation 11,124
Date of Issue 2011-06-16
Date of Implementation 2011-12-01
Older Standard (superseded by this standard) GB/T 8367-1987
Quoted Standard IEC 60255-1; IEC 61000-4-11; IEC 61000-4-17; IEC 61000-4-29
Adopted Standard IEC 60255-11-2008, IDT
Regulation (derived from) Announcement of Newly Approved National Standards No. 9 of 2011
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies requirements for power system protection used for measuring relays and protection equipment, including devices used in conjunction with these control, monitoring and process interface equipment, AC and DC power supplies General requirements. The purpose of testing is to verify that the test device is energized and be bound by such as voltage dips, short interruptions and voltage variations and ripple whether they can work properly. The requirements of this section apply to new measuring relays and protection equipment, all tests specified type tests only.

GB/T 14598.11-2011: Measuring relays and protection equipment -- Part 11: Voltage dips, short interruptions, variations and ripple on auxiliary power supply port


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Measuring relays and protection equipment Part 11. Voltage dips, short interruptions, variations and ripple on auxiliary power supply port ICS 29.120.70 K45 National Standards of People's Republic of China Replacing GB/T 8367-1987 Measuring relays and protection equipment Part 11. Auxiliary power port voltage dips, short Interrupt, voltage and ripple changes Part 11. Voltagedips, shortinterruptions, variationsandrippleon (IEC 60255-11.2008, IDT) Issued on. 2011-12-01 2011-06-16 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

GB/T 14598 "for measuring relays and protection equipment" is divided into several parts. --- GB/T 14598.1 "Electrical relays - Part 23. Contact performance"; --- GB/T 14598.3 "relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and testing"; --- GB/T 14598.4 "Electrical relays - Part 14. Preferred values \u200b\u200bfor electrical relay contacts Contact load life test"; --- GB/T 14598.5 "Electrical relays - Part 15. Electrical characteristics of relay contacts life testing of test equipment"; --- GB/T 14598.6 "Electrical relays - Part 18. There are no size or universal relay"; --- GB/T 14598.7 "Electrical relays - Part 3. dependent or single input energizing quantity measuring relays with independent time"; --- GB/T 14598.8 "Electrical relays - Part 20. Protection System"; --- GB/T 14598.9 "measure 22-3 Part relays and protection equipment. Electrical disturbance tests - Radiated electromagnetic field disturbance tests"; --- GB/T 14598.10 "Section 22-4 for measuring relays and protection equipment. Electrical disturbance tests - Electrical fast transient/burst Immunity test "; --- GB/T 14598.13 "Electrical relays - Part 22-1. Electrical disturbance tests measure relays and protection equipment 1MHz burst immunity test "; --- GB/T 14598.14 "measuring relays and protection equipment division 22-2. Electrical disturbance tests - Electrostatic discharge tests"; --- GB/T 14598.15 "Electrical relays - Part 8. Thermal electrical relays"; --- GB/T 14598.16 "Electrical relays - Part 25. Electromagnetic emission tests for measurement relays and protection devices"; --- GB/T 14598.17 "Electrical relays - Part 22-6. Electrical disturbance tests for RF relays and protection equipment Field-induced immunity to conducted disturbances "; --- GB/T 14598.18 "measuring relays and protection equipment - Part 22-5. Electrical disturbance tests - Surge immunity test"; --- GB/T 14598.19 "Electrical relays - Part 22-7. Electrical disturbance tests for measurement and protection relay station frequency Immunity test "; --- GB/T 14598.20 "Electrical relays - Part 26. Measuring relays and protection equipment electromagnetic compatibility requirements"; --- GB 14598.27 "measuring relays and protection equipment - Part 27. Product safety requirements"; --- GB/T 14598.300 "microcomputer transformer protection devices General requirements"; --- GB/T 14598.301 "microprocessor-based generator and transformer fault recorder technical requirements"; --- GB /Z14598.302"±800kV special HVDC control and protection equipment technology guidance. " This section GB/T 14598 Part 11. This section drafted in accordance with GB/T 1.1-2009 given rules. Section compared with GB/T 8367-1987, major changes in the following. --- Standard name becomes "Part 11 for measuring relays and protection equipment. Auxiliary power port voltage dips, short interruptions and voltage Changes and Ripple "; --- Increased IEC 61000-4-11, IEC 61000-4-17, the requirements of IEC 61000-4-29; --- The corresponding increase test severity and acceptance criteria. Consistency correspondence between this part of international documents and normative references of our files are as follows. --- GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations resistance Interference Test (IEC 61000-4-11.2004, IDT) --- GB/T 17626.17-2005 electromagnetic compatibility test and measurement technology dc input power port immunity test ripple (IEC 61000-4-17.2002, IDT) --- GB/T 17626.29-2006 electromagnetic compatibility test and measurement technology dc input power port voltage dips, short of Off and voltage variations immunity tests (IEC 61000-4-29.2000, IDT) This section identical with IEC 60255-11.2008 "Part 11 for measuring relays and protection equipment. Auxiliary power port voltage sags Drop, short interruptions, variations and ripple voltage "(in English). For ease of use, this section made the following editorial changes. --- International Standard for Table 1, footnote "a" and "b" of the order have been adjusted. This Part replaces GB/T 8367-1987 "dc auxiliary energizing quantity measuring relays interrupt and alternating component (ripple)." This part is proposed by the China Electrical Equipment Industrial Association. This part of the National measuring relays and protection equipment Standardization Technical Committee (SAC/TC154) centralized. This section is drafted. Jicheng Electronics Co., Xuchang Relay Research Institute, XJ Electric Co., Ltd., Nanjing NARI-RELAYS Bao Electric Co., Ltd., Beijing Sifang Automation Co., Ltd., Xuchang Cape Electrical Testing Institute, China Electric Power Research Institute, Zhuhai Wanlida Electric Co., Ltd., violet and Control (Tianjin) Co., Ltd., Dongfang Electronics Co., Ltd., Hebei North Heng Electrical Technology Co., Ltd., Shanghai Electric Power Automation Tianzheng tomorrow Limited, Schneider Electric (China) Investment Co., Ltd., ABB (China) Limited Secretary Jiang Su Jinzhi Technology Co., Schneider Electric (China) Investment Co., Ltd. Shanghai Branch, Siemens (China) Co., Ltd. Siemens Power Automation Limited. The main drafters of this section. Guang Yuan Wen, Liu, Jin Quanren, Yao Zhiqing, Consonant, Fan Wei, Liquan Xi, Shen Xiao Fan, Wang Lei, Hu Jia is, Right constitutional army, Tian Jianjun, Mao Yasheng, Yao Li, Li Yan, Shen Jun, Dong Xingli, Zhu Bin, Hu Fei Huang, Zhang shock. This part of the standard replaces the previous editions are. --- GB/T 8367-1987. Measuring relays and protection equipment Part 11. Auxiliary power port voltage dips, short Interrupt, voltage and ripple changes

1 Scope

This section provides for measuring relays and protection equipment for power system protection used, including the control and use of these devices together, monitoring General requirements depending on the equipment and process interface AC and DC power. Based on this section. ● IEC 61000-4-11 AC voltage dips, short interruptions and voltage variation; ● IEC 61000-4-17 voltage ripple; ● IEC 61000-4-29 DC voltage dips, short interruptions and voltage variation. Purpose of the test is to verify that the pilot plant is being excited and being made, such as voltage dips, short interruptions, variations and ripple voltage at whether positive Indeed work. The requirements of this section apply to new measuring relays and protection equipment, all the tests prescribed only type testing. The purpose of this section is to provide. ● The definitions of terms used; ● test severity; ● test equipment; ● Test configurations; ● test procedures; ● acceptance criteria; ● test report.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. IEC 60255-1 Part 1 measurement relays and protection equipment. General requirements (Measuringrelaysandprotection equipment-Part 1. Commonrequirements) 1) IEC 61000-4-11 electromagnetic compatibility (EMC) - Part 4-11. Testing and measurement techniques - Voltage dips, short interruptions and voltage Variations immunity tests (Electromagneticcompatibility (EMC) -Part 4-11. Testingandmeasurementtech- niques-Voltagedips, shortinterruptionsandvoltagevariationsimmunitytests) IEC 61000-4-17 Electromagnetic compatibility (EMC) - Part 4-17. Testing and measurement techniques ripple dc input power port immunity Test (Electromagneticcompatibility (EMC) -Part 4-17. Testingandmeasurementtechniques-Rip- pleond.c.inputpowerportimmunitytest) 1) IEC original mistaken for IEC 60255-6, shall IEC 60255-1.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 14598.11-2011_English be delivered?

Answer: Upon your order, we will start to translate GB/T 14598.11-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 14598.11-2011_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 14598.11-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 14598.11-2011?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 14598.11-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information