Path:
Home >
GB/T >
Page265 > GB/T 10067.43-2014
Home >
Standard_List >
GB/T >
Page265 > GB/T 10067.43-2014
US$419.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 10067.43-2014: Basic specifications for electroheat installations -- Part 43: Forced convection pit resistance furnaces
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 10067.43-2014 | English | 419 |
Add to Cart
|
3 days [Need to translate]
|
Basic specifications for electroheat installations -- Part 43: Forced convection pit resistance furnaces
| Valid |
GB/T 10067.43-2014
|
PDF similar to GB/T 10067.43-2014
Basic data
| Standard ID | GB/T 10067.43-2014 (GB/T10067.43-2014) |
| Description (Translated English) | Basic specifications for electroheat installations -- Part 43: Forced convection pit resistance furnaces |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | K61 |
| Classification of International Standard | 25.180.10 |
| Word Count Estimation | 18,132 |
| Date of Issue | 6/24/2014 |
| Date of Implementation | 1/22/2015 |
| Quoted Standard | GB 5959.1-2005; GB 5959.4-2008; GB 5959.13-2008; GB/T 10066.1-2004; GB/T 10066.4-2004; GB/T 10067.1-2005; GB/T 10067.4-2005; JB/T 3649.1; JB/T 3649.2; JB/T 3649.3; JB/T 3649.4; JB/T 3649.5; JB/T 3649.6; JB/T 7629-1994; JB/T 9691-1999 |
| Regulation (derived from) | National Standard Announcement 2014 No. 14 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This standard specifies the general technical requirements for all kinds of indirect resistance furnace products, test methods, inspection rules, marking, packaging, transportation, storage, and ordering and delivery and so on. This standard applies to th |
GB/T 10067.43-2014: Basic specifications for electroheat installations -- Part 43: Forced convection pit resistance furnaces
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Basic specifications for electroheat installations Part 43. Forced convection pit resistance furnaces
ICS 25.180.10
K61
National Standards of People's Republic of China
Electric equipment basic technical conditions
Part 43. Forced convection pit Furnace
Part 43. Forcedconvectionpitresistancefurnaces
Issued on. 2014-06-24
2015-01-22 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Product Category 2
4.1 2 varieties and specifications
4.2 Part 3
4.3 The main parameters 3
5 Technical requirements 4
5.1 General requirements 4
5.2 pairs of complementary design and manufacture of claim 4
5.3 Performance Requirements 7
5.4 sets requirements 11
6 Test methods 11
6.1 General provisions 11
6.2 carbon potential (or nitrogen potential) measurement uniformity and stability 12
Check 6.3 RFQ and RFG pit furnace sealing performance of 12
7 inspection rules and technical grade 12
8 signs, packaging, transportation and storage 13
9 Ordering and Delivery 13
Foreword
GB/T 10067 "Basic electric device technical conditions" existing 19 sections.
--- Part 1. Common part;
--- Part 2. Arc heating device;
--- Part 3. induction electric device;
--- Part 4. Indirect resistance furnaces;
--- Part 31. IF coreless induction furnace;
--- Part 32. voltage-frequency multi-station frequency coreless induction furnace complete sets of equipment;
--- Part 33. frequency coreless induction melting Tonglu;
--- Part 41. network with resistance heating unit;
--- Part 42. Push resistance heating unit;
--- Part 43. Forced convection Pit resistance furnace;
--- Part 44. Box-type resistance furnace;
--- Part 45. vacuum hardening furnace;
--- Part 46. Bell-type resistance furnace;
--- 47 parts. vacuum heat treatment and brazing furnace;
--- Part 48. Car-resistance furnace;
--- Part 49. Natural convection Pit resistance furnace;
--- Part 410. single crystal furnace;
--- Part 411. Electric bath furnace;
--- Part 5. High-frequency dielectric heating equipment.
We will continue to develop other parts as needed.
This section GB/T Part of 4,310,067, should be GB/T Part 1 and Part 410 067 used in conjunction.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by the China Electrical Equipment Industrial Association.
This part of the National Electric Equipment Industry Standardization Technical Committee (SAC/TC121) centralized.
This section is drafted. Xi'an Institute Ltd. furnace, furnace Metallurgical Engineering Technology Center, the State Quality Supervision and Inspection Center Furnace,
Shaanxi Province electric engineering and technology research center.
The main drafters of this section. Xu Kuntian, Huangkui Gang, Zhu Lin.
Electric equipment basic technical conditions
Part 43. Forced convection pit Furnace
1 Scope
GB/T 10067 provisions of this part of the common technical requirements for all types of indirect resistance furnace products, test methods, inspection rules, marks,
Packaging, transportation, storage, and ordering and delivery and so on.
This section applies to the natural atmosphere and controlled atmosphere, the rated temperature in the range of 100 ℃ ~ 950 ℃ various types of experiments and industrial
Forced convection pit Furnace. Tempering, annealing and normalizing, carburizing steel parts as well as the main heating and heat treatment of metal parts, seepage
Nitrogen, carbonitriding, blue and so on.
This section also applies to similar forced convection Pit resistance furnace, the different parts can be otherwise.
This section does not apply to household and similar electric appliances.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 5959.1-2005 Safety of electric devices - Part 1. General requirements
GB 5959.4-2008 Safety of electric devices - Part 4. Particular requirements for resistance heating device
GB 5959.13-2008 Safety of electric devices - Part 13. Electric apparatus for explosive atmosphere of special requirements
GB/T 10066.1-2004 Test methods for electroheat installations - Part 1. General section
GB/T 10066.4-2004 Test methods for electric equipment - Part 4. Indirect resistance furnaces
GB/T 10067.1-2005 basic technical conditions for electric devices - Part 1. General section
GB/T 10067.4-2005 Electric equipment basic technical conditions - Part 4. Indirect resistance furnaces
JB/T 3649 (all parts) resistance furnace refractory products
JB/T 7629-1994 refractory fiber lining in the design and installation specifications
JB/T 9691-1999 Heating Equipment Model methodology
3 Terms and Definitions
GB/T 10066.4-2004 and as defined in the following terms and definitions apply to this document.
3.1
Workspace dimensions dimensionsofworkingzone
Pit furnace design requirements, and indicated on drawings allows placement of the workpiece furnace space dimensions.
Having a cylindrical pockets of pit furnaces, diameter and height of the workspace design requirements were equal to the inner diameter and effective height of the baskets.
3.2
Maximum load capacity maximumloading
Predetermined pit furnace design of each furnace can be loaded up to the weight of the workpiece. Having pockets of pit furnace does not include the weight of the baskets.
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB/T 10067.43-2014_English be delivered?
Answer: Upon your order, we will start to translate GB/T 10067.43-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB/T 10067.43-2014_English with my colleagues?
Answer: Yes. The purchased PDF of GB/T 10067.43-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to
[email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.