HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (17 Jan 2026)
Path: Home > GB > Page125 > GB 29364-2012                   Home > Standard_List > GB > Page125 > GB 29364-2012

GB 29364-2012 English PDF

US$329.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 29364-2012: Indicating and control unit for fire resistant door sets
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 29364-2012English329 Add to Cart 3 days [Need to translate] Indicating and control unit for fire resistant door sets Valid GB 29364-2012

PDF similar to GB 29364-2012


Standard similar to GB 29364-2012

GB 20517   GB 15322.1   GB 14287.3   GB 16808   GB 20517   GB/T 45839   

Basic data

Standard ID GB 29364-2012 (GB29364-2012)
Description (Translated English) Indicating and control unit for fire resistant door sets
Sector / Industry National Standard
Classification of Chinese Standard C81
Classification of International Standard 13.220.20
Word Count Estimation 14,140
Quoted Standard GB/T 9969; GB 12978; GB 16838; GB/T 17626.2; GB/T 17626.3; GB/T 17626.4; GB/T 17626.5; GB/T 17626.6; GB/T 17626.11
Regulation (derived from) National Standards Bulletin 2012 No. 41 National Standards Commission recently released 16 national standards for fire protection
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This Chinese standard specifies the fire door monitor the terms and definitions, requirements, testing, inspection rules, signs and instructions. This standard applies to general industrial and civil use of fire doors installed monitors, other monitors in

GB 29364-2012: Indicating and control unit for fire resistant door sets

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Indicating and control unit for fire resistant doorsets ICS 13.220.20 C81 National Standards of People's Republic of China Fire Door Monitor Published 2012-12-31 2013-07-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China issued

Foreword

This standard Chapter 4,6,7 content is mandatory, the rest are recommended. This standard was drafted in accordance with rules GB/T 1.1-2009 given. Please note that some of the content of this document may involve patents. The issuing authority of this document does not assume responsibility to identify these patents. The standard proposed by the People's Republic of China Ministry of Public Security. By the standards of the National Fire Protection fire detection and alarm Technical Committee of Standardization Technical Committee (SAC/TC113/SC6) centralized. This standard is drafted. Shenyang Fire Research Institute Ministry of Public Security. The main drafters. Ding Hongjun, Ma Hang, Zhang Ying Cong Luan military, Yan Ru, Ding Wanjun, Llewelyn, Xie Feng, Shao Yu. This standard is the first release. Fire Door Monitor

1 Scope

This standard specifies the terms and definitions monitor fire doors, requirements, testing, inspection rules, signs and instructions for use. This standard is applicable to general industrial and civil buildings Fire doors monitor use, installed in other environments may monitor parameters According to this standard.

2 Normative references

The following documents for the application of this document is essential. For dated references, only applies to the version dated paper Pieces. For undated references, the latest edition (including any amendments) applies to this document. GB/T 9969 General Industrial Product Manual GB 12978 Fire electronic products inspection rules GB 16838 fire electronic product environmental test methods and severities GB/T 17626.2 Electromagnetic compatibility testing and measurement techniques electrostatic discharge immunity test GB/T 17626.3 Electromagnetic compatibility testing and measurement techniques RFEMS Test GB/T 17626.4 Electromagnetic compatibility testing and measurement techniques Electrical fast transient burst immunity test GB/T 17626.5 Electromagnetic compatibility testing and measurement techniques surge (impact) immunity test GB/T 17626.6 Electromagnetic compatibility testing and measurement techniques conducted disturbances, induced fields Immunity GB/T 17626.11 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions immunity tests and voltage variations

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 For displaying and controlling fire door open, close control of the device state (hereinafter referred to as "monitor"). 3.2 Fire door closers electric electriccloserforfireresistantdoorsets It can be in the open state after the receipt of a command to close the fire door, and its state information feedback to monitor the electric fire door installed Means (hereinafter referred to as "electric door closers"). 3.3 Fire doors electromagnetic release electromagneticreleasedeviceforfireresistantdoorsets The normally open fire doors remains open, releasing fire door to be closed after receiving the instruction, and feeds back the status information to the monitor itself An electric apparatus (hereinafter, referred to as "release"). 3.4 Magnetic switch fire door magneticcontactforfireresistantdoorsets For monitoring the fire door open or closed state, and means which can fire door state information to the monitor (hereinafter referred to as "tamper switch"). 3.5 Fire doors fault condition abnormalstatesoffireresistantdoorsets Fire door open state in a non-normal or abnormal closed state.

4 Requirements

4.1 Appearance The appearance of the monitor should meet the following requirements. a) text, symbols and signs clear and complete; b) the sample surface without etching, coating loss and blistering, no scratches, cracks, burrs and other mechanical damage; c) fastening parts without loosening. 4.2 Main component performance 4.2.1 General requirements Member monitor styling products should meet the relevant standards, and should meet the requirements of 4.2.2 - 4.2.6. 4.2.2 Indicators, displays 4.2.2.1 should start signal is indicated in red, and the door release electric feedback signal of the operation signal and the door sensor; yellow indicator Fault, self-test status; Green indicates power operating state and the release of the feedback signal. 4.2.2.2 Indicator, the Chinese display function should be clearly marked. 4.2.2.3 100lx ~ 500lx under ambient light conditions in front of the 22.5 ° angle range, and a power status indicator should display At 3m clearly visible; the other indicator display displays the character should be legible in at 0.8m. 4.2.2.4 using flash mode indicator display each lighting time of not less than 0.25s, which is not less than flicker frequency of 1Hz. 4.2.2.5 When a lamp using the same, the display state of the display of the exact location, should be clear and legible. 4.2.2.6 character in ambient light conditions 100lx ~ 500lx, the display should be displayed in the front viewing angle 22.5 °, 0.8m at Readable. 4.2.3 Fuse Rated current of the fuse or other overcurrent protection device of the power line should not exceed 2 times the maximum working current of the monitor; when It is greater than the maximum operating current. 6A, the current value of the fuse preferably 1.5 times, and should be close to the fuse or other overcurrent protection device and cleared by Chu marked its parameter values. 4.2.4 Terminals On each of the terminals should clearly and firmly its number or symbol label, use shall be stated in the respective relevant documents. And standby power charger 4.2.5 4.2.5.1 charger current should not exceed the rated power backup battery manufacturers specified. 4.2.5.2 backup power source connected to the positive lead red, black or blue extremely negative. 4.2.6 switches and buttons Key or switch and a position near the Chinese application clearly marked its function. 4.3 overall performance 4.3.1 Basic functions 4.3.1.1 monitor the main power should be 220V, 50Hz AC power, power line input terminal should be located. 4.3.1.2 When the monitor connected for electric door release and magnetic switches power supply voltage should be 24V DC or 12V; interface parameters electric door closers, magnetic switches and release should be consistent with the monitor. 4.3.1.3 shall monitor a protective grounding terminal. 4.3.1.4 monitor when using the text display information, should be Chinese. 4.3.1.5 should be able to monitor and display the electric door release opening connected thereto, the closed state, and should have a dedicated status light. 4.3.1.6 monitor should be able to directly control the operation mode of each electric door release and connected thereto, and provided the total start indicator, When the start signal is issued, the lamp should be illuminated. 4.3.1.7 monitor should be able to receive the fire alarm signal from a fire alarm system, and an electric door within 30s or released Issues a start signal, a total lamp lighting start. 4.3.1.8 Monitor feedback signal to be received within the electric door closers, magnetic switches, or release action 10s, and optical feedback means should be Shown, indicating the name of, or part thereof, should be kept to a feedback controlled optical pointing device resumes; after sending a start signal is not received within the required feedback channels 10s Number, the total should be made to start light flashes, and display the respective electric door closers, magnetic contacts or site of release, to monitor receipt of a counter holder The feedback signal. 4.3.1.9 Fault monitor should fire door status indicator total, in a fault condition when the fire door, the lamp should be lit, light concurrent silent Alarm signal. SPL (1m at the front) of the acoustic signal should be 65dB ~ 85dB; prompt fault acoustic signal at least once every minute, every Time duration should be 1s ~ 3s. 4.3.1.10 monitor should be able to record fire door connected thereto status information (including the address of the fire door, opening, closing and fault conditions and the corresponding Time, etc.), a recording capacity of not less than 10,000, and having the above-described information upload function. 4.3.2 self-test function It should be able to monitor its status indicators and audio components, a display check function. When monitor the implementation of the self-test, should not cause its Operation of the external apparatus connected. 4.3.3 standby power function 4.3.3.1 monitor should be equipped with backup power, and meet the following requirements. a) standby power shall be sealed, maintenance-free rechargeable battery. b) Battery capacity should ensure reliable operation of the monitor properly in the following cases 3h. 1) in the power operation state monitor; 2) opening and closing fire doors provide the required power. c) prevent battery overcharge, over-discharge function; discharge at the battery without exceeding the limit specified by the manufacturer should be able to 24h The complete charging of the battery. 4.3.3.2 should monitor main and backup power conversion function. Working state of the main and backup power supply should have an indication, main and backup power is not to be converted Monitor malfunctions occur. 4.3.4 failure alarm When the following fault, monitor a clear distinction should be audible alarm signal in the 100s, optical fault signal, the acoustic signal should the fault A manually eliminated, when a fault signal is input again, should not restart; failure in the optical signal should be kept to a troubleshooting. Main power a) monitor off; b) monitor the electric door closers, release, disconnection between cable tamper switch, a short circuit; c) failure of the electric power supply closers, release, door switch; d) a connecting line between the power supply and standby battery charger circuit, short circuit; e) standby power failure. 4.4 Insulation Resistance Monitor insulation resistance value between the live terminal and the external insulating casing required not less than 20 M [Omega; between the housing and the power input terminal The insulation resistance value is not less than 50MΩ. 4.5 Electric strength Monitor plug between the housing and able to withstand a frequency of 50Hz, the AC voltage of 1250V rms voltage duration 1min Electrical strength test. During the test, not the breakdown phenomenon; After the test, the basic functions should be consistent with the previous test. 4.6 electromagnetic compatibility Monitor should withstand the test requirements under the conditions specified in Table 1. During the test, it should maintain a normal monitoring state; After the test, the basic Function should be consistent with the previous test. NOTE. normal monitoring state refers to monitor conditions in the normal power supply, no fault alarm operating state when the self-test operation. Table 1 Test conditions EMC Name of test Test conditions RF electromagnetic radiation Radio immunity test Field strength V/m Frequency Range MHz Scan rate 10oct/s Modulation amplitude working condition 10 80 ~ 1000 ≤1.5 × 10-3 80% (1kHz, sine) Normal monitoring state Induced by radiofrequency fields Conducted disturbances Interference Test Frequency Range MHz Voltage dBμV Modulation amplitude working condition 0.15 ~ 80 140 80% (1kHz, sine) the normal monitoring state Anti-static discharge Interference Test Discharge voltage kV Discharge the polarity Discharge interval Each discharge point number operation state Air discharge (insulator housing) 8 Contact discharge (shell conductors) 6 Positive and negative normal monitoring state ≥1 10 Electrical Fast Transient Burst Immunity Test Voltage peaks kV repeat frequency kHz polarity time min Working condition AC power cord. 2 × (1 ± 0.1) Other cable. 1 × (1 ± 0.1) AC power line. 2.5 × (1 ± 0.2) Other cable. 5 × (1 ± 0.2) Positive and negative each time a normal monitoring state Surge (impact) Immunity Test Surge (impact) voltage kV polarity duration ms The number of trials work status AC power cord - Line. 1 × (1 ± 0.1) AC power cord - Ground. 2 × (1 ± 0.1) Other connection wire - to. 1 × (1 ± 0.1) Positive and negative 10 (100% decline) AC power line. 5 Other connecting lines. 20 Normal monitoring state Voltage dips, short When interruptions and voltage Immunity change test Test time Rated voltage cycle The number of trials work status 10 (40% supply voltage) 1 (0V) 10 normal monitoring state 4.7 Transient power tolerance Press main power monitor "power (9s) ~ off (lS)" continuous procedure a fixed-off 500 times. During the test, should maintain a normal prison Vision state; After the test, the basic functions should be consistent with the previous test. 4.8 climatic environmental tolerance Monitoring should be able to withstand the trials Table 2 under the provisions of the climatic conditions. During the test, in an energized state and a monitor assembly It should maintain a normal monitoring state; After the test, the coating should be no damage and corrosion, should be consistent with the basic functions before the test. Table 2 climate conditions Name of test Test conditions Low temperature (run) test temperature duration Working condition 0 ± 3 16 normal monitoring state Damp heat (operational) test temperature Relative humidity duration Working condition 40 ± 2 90 ~ 95 4 normal monitoring state 4.9 Mechanical environmental resistance Monitors shall withstand the test in Table 3 under mechanical environmental conditions. During the test, a monitor in an energized state should be maintained Hold normal monitoring state; After the test, mechanical damage and should not have any loose fastener, should be consistent with the basic functions before the test. Table 3 Mechanical environmental conditions Name of test Test conditions Vibration (sinusoidal) (Run) test Cycle frequency range Hz Acceleration amplitude m/s2 Sweep rate oct/min Each sweep axis frequency Vibration direction work status 10 ~ 150 0.981 1 1 X, Y, Z normal monitoring state Vibration (sinusoidal) (Durability Test Cycle frequency range Hz Acceleration amplitude m/s2 Sweep rate oct/min Each sweep axis frequency Vibration direction work status 10 ~ 150 4.905 1 20 X, Y, Z is not energized state Crash Test Collision energy The number of collisions working condition 0.5 ± 0.04 3 normal monitoring state

5 Test

5.1 General Table 4 Test procedure 5.1.1. 5.1.2 the test should be carried out under the following conditions. --- Temperature. 15 ℃ ~ 35 ℃; --- Humidity. 25% RH ~ 75% RH; --- atmospheric pressure. 86kPa ~ 106kPa. 5.1.3 EMC test equipment shall comply with the provisions of GB/T 17626.2 ~ 17626.6 and GB/T 17626.11, the environment and the climate machine Mechanical environmental testing equipment shall comply with the provisions of GB 16838. 5.1.4 the tolerance test data is ± 5%. 5.1.5 Sample 2 sets of monitor, be numbered before the test. 4.1 and 4.2 should be required for appearance and components of samples 5.1.6 checked before testing, meet the requirements before the test. Table 4 Test Procedure No. clauses pilot project Numbering 1 4.1 Visual inspection √ √ 4.2 Check main member 2 √ √ 3 5.2 Basic function tests √ √ 4 5.3 self-test function tests √ √ 5 5.4 standby power function test √ √ 6 5.5 Fault alarm function test √ √ 7 5.6 insulation resistance test √ 8 5.7 Electric strength test √ 9 5.8 Test RFEMS √ 10 5.9 RF field immunity test conducted disturbances induced √ 11 5.10 electrostatic discharge immunity test √ 12 5.11 electrical fast transient burst immunity test √ 13 5.12 surge (impact) immunity test √ 14 5.13 Voltage dips, short interruptions and voltage variations immunity test √ 15 5.14 power transient test √ 16 5.15 low temperature (run) test √ 17 5.16 Damp heat (running) test √ 18 5.17 vibration (sine) (running) test √ 19 5.18 vibration (sine) (durability) test √ 20 5.19 Crash Test √ 5.2 Basic function test 5.2.1 Sample Couplings electric door closers, and release each of two magnetic switches, may be connected to other circuits equivalent load, power, The sample is in the normal monitoring state. 5.2.2 Check sample power, power supply state, display state, and a ground terminal; analog electric door opening, a door sensor and a release switch, and closing Fire doors fault condition remains 100s, observe and record the operating state of the sample. 5.2.3 operation of the electric door closers, magnetic switches, and allowed to release the operation, the sample was observed and recorded and electric door closers, magnetic door open and release Off state. 5.2.4 emits a fire alarm signal from a fire alarm system to the sample, the sample to record the electric door closers, issued release start Time signal, and the sample was observed and recorded electric door closers, released state. The information recording and information transfer 5.2.5 inspection sample. 5.3 self-test function tests 5.3.1 The sample connect two electric door closers, magnetic switches and release, power, it is in the normal monitoring state. 5.3.2 Operation sample self-test mechanism, observe and record the operating state of the sample. 5.4 standby power function test 5.4.1 Sample according to design a circuit connected to a real load capacity, the equivalent load connected to other circuits. 4.3.3.1 accordance with the requirements of Test, observe and record the operating state of the sample. 5.4.2 in the sample is in a normal monitoring state, cut off the main power of the sample, the sample from the standby power supply, main power is restored and then observed And recording state of the sample. 5.5 fault alarm function test 5.5.1 The sample connect two electric door closers, magnetic switches and release, other equivalent load circuit can be connected, connected to electric Source, the sample is in the normal monitoring state. 5.5.2 4.3.4 required, the function of the fault test samples, observe and record the operating state of the sample. 5.5.3 Manual eliminate the fault acoustic signal, and another part of the signal a fault, the sample check mute function, the acoustic signal fault restart function And a fault signal display. 5.5.4 manual reset sample, recording the time the sample emits a fault signal is not ruled out; troubleshoot all input signals, manual reset again After the sample (not applicable to the automatic fault recovery function of sample), observed and recorded in the case of the samples indicated. 5.6 Insulation resistance test 5.6.1 Test Equipment Using the insulation resistance test equipment meets the following requirements (also available megger or shaking table test). a) Test Voltage. 500V ± 50V; b) measuring range. 0MΩ ~ 500MΩ; c) minimum scale. 0.1MΩ; d) chronograph. 60s ± 5s. 5.6.2 Test Procedure 5.6.2.1 after the sample has external insulation requirements shorting live terminal is connected to the positive output terminal of the insulation resistance test equipment, chassis ground The negative output terminal of the insulation resistance test apparatus. 500V ± 50V DC voltage is applied, the duration 60s ± 5s, the recording insulation resistance value. 5.6.2.2 A sample plug (or power terminal) after shorted, connected to the positive output terminal of the insulation resistance test equipment, chassis ground The negative output terminal of the insulation resistance test apparatus. 500V ± 50V DC voltage is applied, the duration 60s ± 5s, the recording insulation resistance value. 5.7 Electric strength test 5.7.1 Test Equipment Strength test using electrical equipment meets the following conditions. a) Test Voltage. Voltage 0V ~ 1250V (RMS) continuously adjustable frequency of 50Hz, the short-circuit current of 10A (RMS); b) l, down rate. 100V/s ~ 500V/s; c) Timing. 60s ± 5s. 5.7.2 Test Procedure 5.7.2.1 before the test, the sample was ground protection element removal. 5.7.2.2 by the test apparatus to 100V/s ~ 500V/s boosting rate is applied to the 50Hz power line between the specimen and the casing, Test voltage 1250V (RMS voltage) for 60s ± 5s, tests were observed and recorded phenomenon occurred. 5.7.2.3 at 100V/s ~ 500V/s down rate of the voltage drops below the rated voltage value, the voltage output of the test apparatus off. 5.7.2.4 sample power is turned on, it is in the normal monitoring state. 5.7.2.5 basic function test, and compared with the basic functions before the test. 5.8 Test RFEMS 5.8.1 The test samples were arranged in a predetermined GB/T 17626.3 will monitor and electric door closers, magnetic switches, and even release Then, power, it is in the normal monitoring state, holding 20min. EMI test 5.8.2 Test Method GB/T 17626.3 predetermined application conditions shown in Table 1 in the sample, the sample was observed and recorded Working condition. 5.8.3 basic function test, and compared with the basic functions before the test. 5.9 conducted disturbances induced by radio frequency fields immunity test 5.9.1 The specimen is tested according to a predetermined configuration GB/T 17626.6 will monitor and electric door closers, magnetic switches, and even release Then, power, it is in the normal monitoring state, holding 20min. EMI test according to test Method 5.9.2 GB/T 17626.6 predetermined application conditions shown in Table 1 in the sample, the sample was observed and recorded Working condition. 5.9.3 basic function test, and compared with the basic functions before the test. 5.10 electrostatic discharge immunity test 5.10.1 The test samples were arranged in a predetermined GB/T 17626.2 will monitor and electric door closers, magnetic switches, and even release Then, power, it is in the normal monitoring state, holding 20min. EMI test 5.10.2 Test method according to GB/T 17626.2 predetermined application conditions shown in Table 1 and the coupling plate sample was observed And record the operating state of the sample. 5.10.3 basic function test, and compared with the basic functions before the test. 5.11 electrical fast transient burst immunity test 5.11.1 The specimen is tested according to a predetermined configuration GB/T 17626.4 will monitor and electric door closers, magnetic switches, and even release Then, power, it is in the normal monitoring state, holding 20min. EMI test 5.11.2 Test method according to GB/T 17626.4 predetermined application conditions shown in Table 1 in the sample. During the experimental period And record the operating state of the sample. 5.11.3 basic function test, and compared with the basic functions before the test. 5.12 Surge (impact) immunity test 5.12.1 The specimen is tested according to a predetermined configuration GB/T 17626.5 will monitor and electric door closers, magnetic switches, and even release Then, power, it is in the normal monitoring state, holding 20min. EMI test 5.12.2 Test method according to GB/T 17626.5 predetermined application conditions shown in Table 1, the sample was observed and recorded again Kind of job status. 5.12.3 basic function test, and compared with the basic functions before the test. 5.13 voltage dips, short interruptions and voltage variations immunity tests 5.13.1 claim normal monitoring state, electric door closers sample connect, release, and tamper switch. Connect the sample fits Mains voltage GB/T 17626.11 predetermined sag and interrupt the test apparatus, it is in the normal monitoring state. 5.13.2 main voltage fell to 40% for 20ms, repeated 10 times; and then will fall to main voltage 0V for 10ms, heavy Multiplexing 10, observe and record the operating state of the sample. 5.13.3 basic function test, and compared with the basic functions before the test. 5.14 Power transient test 5.14.1 claim normal monitoring state, the sample is connected to the electric door closers, magnetic switches and release, the specimen is connected to the gauge line with 4.7 Given power transient test apparatus, it is in the normal monitoring state. 5.14.2 opening test device, the sample according to the main power "power (9s) ~ off (lS)" continuous procedure a fixed-off 500 times, and observed Recording the operating state of the sample. 5.14.3 basic function test, and compared with the basic functions before ...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 29364-2012_English be delivered?

Answer: Upon your order, we will start to translate GB 29364-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 29364-2012_English with my colleagues?

Answer: Yes. The purchased PDF of GB 29364-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information