GB 26860-2011: Safety code of electric power industry - Electric part of power plants and transformer substations
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB 26860-2011 | English | 378 |
Add to Cart
|
1 days [Need to translate]
|
Safety code of electric power industry - Electric part of power plants and transformer substations
| Valid |
GB 26860-2011
|
PDF similar to GB 26860-2011
Basic data
| Standard ID | GB 26860-2011 (GB26860-2011) |
| Description (Translated English) | Safety code of electric power industry - Electric part of power plants and transformer substations |
| Sector / Industry | National Standard |
| Classification of Chinese Standard | K09 |
| Classification of International Standard | 29.020 |
| Word Count Estimation | 31,346 |
| Date of Issue | 2011-07-29 |
| Date of Implementation | 2012-06-01 |
| Quoted Standard | GB/T 2900.20-1994; GB/T 2900.50-2008 |
| Regulation (derived from) | Announcement of Newly Approved National Standards No. 12 of 2011 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This Chinese standard specifies the electricity production units and staff in the workplace in the power of the basic electrical safety requirements. This standard applies to having a voltage level of 66kV and above all the use of facilities for power generation companies in the electrical equipment and related areas, has 35kV and above voltage level facilities, transmission, transformation and distribution companies all use of electrical equipment and its associated places, with facilities 220kV and above voltage level of the electricity use in electrical equipment unit and its associated sites. Other power companies and power units can also use and reference. |
GB 26860-2011: Safety code of electric power industry - Electric part of power plants and transformer substations
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Safety code of electric power industry.Electric part of power plants and transformer substations
ICS 29.020
K09
National Standards of People's Republic of China
Electrical safety work order
Power plants and substations electrical parts
Issued on. 2011-07-29
2012-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Job Requirements 2
5 security organizations Measure 3
6 Safety Measures 6
7 electrical equipment operation 8
8 lines when the job security of power plants and substations 9
9 9 Live Working
10 generators and high-voltage electric motor repair, maintenance 11
11 works on sulfur hexafluoride (SF6) electrical equipment 12
12 working on the low-voltage power distribution equipment and low voltage wires 12
Work on the secondary system 12 13
14 electrical test 13
15 Power cable for 13
14 16 Additional security requirements
Appendix A (informative) Electrical a first job ticket format 15
Annex B (informative) Electrical second job ticket format 18
Annex C (informative) electrically charged work job ticket format 20
Annex D (informative) emergency repair single-format 22
Appendix E (normative) insulated safety equipment test project period and claim 23
Annex F (normative) nameplate Shape 26
Annex G (informative) Operation Order Format 27
Foreword
Chapter 5 of this standard 7.3.4 are recommended, the rest are mandatory.
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Electricity Council.
This standard by the National Standardization Technical Committee of high voltage electrical safety (SAC/TC226) centralized.
This standard was drafted. State Grid Corporation, China Southern Power Grid Co., Ltd., China Datang Corporation, Zhejiang Energy Group
Limited.
The main drafters of this standard. it became Chen, Tsai Chung-ho plot, Liu Heng Ming, Zhang Lei, Lu Maode, Dai Keming, Wang Shangshun, Hu Xiang Yu Nie present, Lin Yonggang,
He along Kun, Zhao Yawei, Li Zhiyong, Lu Jianming, Ge Naicheng.
Electrical safety work order
Power plants and substations electrical parts
1 Scope
This standard specifies the electrical power production units and basic safety requirements for power staff in the workplace.
This standard is applicable to a 66kV and above voltage level of the power generation business facilities all use electrical equipment and related sites;
Transmission has 35kV and above voltage grade facilities, substation and distribution companies all use electrical equipment and related sites; having
Power units using 220kV and above voltage level of electrical equipment in facilities and related sites. Other power companies and power unit
Also available for reference.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2900.20-1994 Electrotechnical terminology voltage switchgear (IEC 60050 (IEV).1994, NEQ)
GB/T 2900.50-2008 Electrotechnical terminology Generation, transmission and distribution of generic terms (IEC 60050-601-1985, MOD)
3 Terms and Definitions
GB/T 2900.20-1994, GB/T 2900.50-2008 defined and the following terms and definitions apply to this document.
3.1
Power [station] electricalgeneratingstation
By the building, energy conversion equipment and all the necessary auxiliary equipment consisting of electrical energy production plants.
[GB/T 2900.50-2008, in the definition of 2.3 601-03-01]
3.2
Substations (Power Systems) substation (ofapowersystem)
Part of the power system, which is concentrated in a designated place, including terminals, switches and control equipment transmission or distribution lines,
Buildings and transformers. Typically include power system security and control of the necessary facilities (such as protective devices).
Note. Depending on the nature of the system contains a substation can add a prefix to define the word in front of the substation. For example .( a transmission system) Transmission and Distribution
Stations, power distribution substation, 500kV substation, 10kV substation.
[GB/T 2900.50-2008, in the definition of 2.3 601-03-02]
3.3
Power lines electricline
Between two o'clock in the system for transmission and distribution wires, insulation and annexes facilities.
[GB/T 2900.50-2008, in the definition of 2.3 601-03-03]
3.4
Breaker circuit-breaker
Can closing, carrying, breaking the normal current run loop, but also within the specified closing time, carrying and breaking provisions of the overload current (including
Short-circuit current) of the switching device, also known as switches.
NOTE. rewrite GB/T 2900.20-1994, definitions 3.13.
3.5
Isolation switch disconnector
At the location, between the contacts have to meet the requirements of insulation distance and visible sign off; when the closing position, can carry a normal circuit
Current and abnormal conditions (eg short circuit) under the current switching apparatus within a predetermined time under the conditions.
[GB/T 2900.20-1994, the definition 3.24]
3.6
Low [electricity] Presser lowvoltage; LV
For AC power distribution system voltage 1000V and below grade.
[GB/T 2900.50-2008, the definition of 2.1 601-01-26]
3.7
High [electricity] voltage highvoltage; HV
(1) usually means over-pressure voltage levels.
(2) In certain cases, it refers to the power system transmission voltage level.
[GB/T 2900.50-2008, the definition of 2.1 601-01-27]
3.8
The use of electrical equipment operatingelectricalequipment
All with a voltage, a portion of the electrical equipment with a voltage or via the operation that is supplied with a voltage.
4 operational requirements
4.1 Staff
4.1.1 physician identified, without prejudice to working condition (medical examination at least once every two years).
4.1.2 have the necessary safety knowledge and skills of personnel engaged in electrical work should have a shock first aid rescue method.
4.1.3 have the necessary electrical knowledge and business skills, familiar with the electrical equipment and systems.
4.2 job site
4.2.1 job site production conditions, safety, work tools and safety equipment shall comply with the national standards or industry requirements,
Safety equipment and labor protection products before use should be qualified available.
4.2.2 appropriate breaks and construction vehicles often working on someone with first aid kits, first aid supplies store, and designate a person check, supplement or
replace.
4.3 job measures
4.3.1 should work to ensure the safety of electrical equipment on the institutional measures may include job applications, work arrangement, written security requirements, work
Licensing, monitoring work, and the work stopped, and the end of the transfer and other procedures.
4.3.2 carry out all or part of power outage work on electrical equipment, equipment operation and maintenance unit should be made to apply power outages by scheduling
Need of competent jurisdiction to apply in advance outage scheduling mechanism, arrangements for maintenance work only after consent.
4.3.3 repair work should be carried out before the work is arranged, clear place of work, tasks, responsible person, work environment, work programs and books
Surface safety requirements, division of tasks and working class members.
4.4 Other Requirements
4.4.1 The workers should be informed of their risk factors and preventive measures exist job site.
4.4.2 found directly endanger the safety of emergency, the scene shall have the authority to stop work and to organize the evacuation job site.
5 Security Measures Organization
5.1 General Requirements
5.1.1 Safety Measures Organization as one of the measures to ensure the safety of the system, including job tickets, work permits, monitoring, intermittent, transfer and termination
Wait. Job ticket issuer, who is responsible for the work (guardian), work permits who dedicated guardians and members of the working class should be the entire job process
To fulfill their security responsibilities.
5.1.2 job ticket is one written permission of the safety requirements for electrical equipment on the job can contain number, place of work, job content, plan
Working hours, work permit time, the end of the work time, the scope of power and safety measures, and work ticket issuer, work permits people workload
Responsibility and working class members and so on.
5.1.3 In addition to working with the ticket Required fields work, the other may be given orally or by telephone command mode.
5.2 Job Ticket types
5.2.1 requires all high-voltage power equipment, and some power outages or security measures do work, filled with a first electrical work sheet (see Appendix A).
5.2.2 Table 1 is greater than the safe distance from energized equipment related sites and work on the housing and the impossibility of contact with live conductive parts of the equipment
Work, filled with a second electrical work sheet (see Appendix B).
Table 1 safe distance from the device does not power failure
Voltage level
kV
safe distance
10 and below 0.70
20,35 1.00
66,110 1.50
220 3.00
330 4.00
500 5.00
750 7.20
1000 8.70
± 50 and below 1.50
± 500 6.00
± 660 8.40
± 800 9.30
Note 1. The table listed voltage level by a high-speed voltage levels safe distance.
Note 2. 13.8kV a safe distance from the implementation of 10kV.
Note 3. 750kV data are corrected altitude 2000m, 1000m above sea level by other levels of data correction.
5.2.3 live or work with live equipment is less than the distance specified in Table 1, but are not safe distance from power by charging work practices undertaken fill
Working with the job ticket electrically charged (see Appendix C).
5.2.4 accident emergency repair work using a single emergency repairs (see Appendix D) or job ticket. Accident repair work should be carried out using non-continuous
Work sheet.
5.3 work filled with votes
5.3.1 The work should use a unified ticket coupon format.
5.3.2 If these devices at the same stop, power transmission, can be filled with a first electrical work ticket.
a) belong to the same voltage level, place in the same plane, the work does not touch a live conductor of several electrical connections;
b) a transformer outage maintenance, but also with its circuit breaker overhaul;
c) station blackout.
Note 1. The AC system is a part of the electrical connection means isolating switches available with other electrical devices separate parts.
Note 2. The current system is an electrical connection, refer to bipolar converter transformer and disable all high-voltage DC device, change or disable pole unipolar runtime
Transformer, valve hall, DC field equipment, cooling system (bipolar public areas of operation of the device).
5.3.3 the same electrical substation same (including power plants booster station and converter station, the same below) on several internal electrical connection performed sequentially
Pressure level, the same type of work without power, can be filled with a second electrical work ticket.
5.3.4 the same voltage level in the same substation, in turn, the same type of line work, can be filled with an electrically charged Exposed Workers
For votes.
5.3.5 Operation and Maintenance work sheet by the issuance of additional Units or equipment operation and maintenance by a qualified and approved by the audit units issued.
On contract projects, work tickets can be issued in the form of both sides to implement.
5.3.6 pay a working ticket responsible person, another person to pay a work permit.
5.3.7 a responsible person should work simultaneously perform two or more votes.
5.3.8 hold the line into the job ticket substation overhead lines, cables, etc., should be opened only after the permission of the substation work permits
Beginning work.
5.3.9 At the same time to stop transmission of the repair work to fill with a work sheet, complete all safety measures before the start of work within the ticket. No maintenance work such as
Simultaneous completed, the remaining repair work should be filled with a new work sheet.
5.3.10 changing work shift member or responsible person, shall perform the change.
5.3.11 increases when tasks within the operating range of a power outage ticket, if not necessary to change the scope of security measures, the responsible person shall obtain working ticket
The issuance of work permits and the consent of the original work on the ticket by filling work item; For changes or additional security measures, should be filled with a new work sheet.
5.3.12 valid time electrical work ticket first, second electrical work ticket and live electrical work jobs votes to approve the overhaul plan
Working time is limited, the extension should formalities.
Security responsibilities listed persons 5.4 job ticket
5.4.1 work ticket issuer.
a) confirm the necessity of work and safety;
b) confirm the safety measures on the work sheet filled correctly, complete;
c) confirm that the faction leaders and work shift work appropriate staff, adequate.
5.4.2 staff in charge (Guardian).
a) proper organizational work safely;
b) confirm the safety measures listed in the work ticket is correct, complete, consistent with the actual site conditions, supplemented where necessary;
c) before the work shift work to inform all members of the dangerous point, supervision, monitoring the work of members of the Executive class site security and technical measures.
5.4.3 Working Licensee.
a) confirm the correct safety measures listed job ticket complete, consistent with site conditions;
b) confirm the work site layout measures to improve safety, make sure no dangerous sudden call of maintenance equipment;
c) there are questions about the job ticket list, should work ticket issuer for clarification, if necessary supplementary requirements.
5.4.4 Select Guardian.
a) explicitly guardianship and custody personnel range;
b) before work on the ward staff explain safety measures to inform the danger point and safety precautions;
c) supervise the implementation of the standards and safety measures custodial staff, and promptly correct unsafe behaviors.
5.4.5 Working Class Members.
a) familiar with the work content, workflow, control security measures, a clear point of danger, and perform confirmation procedures;
b) compliance with safety regulations, technical regulations and labor discipline, implementation of safety procedures and implement safety measures;
c) the proper use of safety equipment and labor protection products.
5.5 Work Permit
5.5.1 Upon completion of work permits in the construction job site safety measures, should complete the following procedures.
a) in conjunction with the responsible person to inspect the security measures made again;
b) the person in charge of the work specified in live equipment location and considerations;
c) in conjunction with the responsible people are confirmed on the work sheet, signature.
5.5.2 work permit either party responsible person, work permits people should not be allowed to change security measures.
5.5.3 live working responsible person in charge before work begins, the unit should maintain or duty dispatcher and equipment operation and performance of contact
For licensing procedures, after the end of the live working should be promptly reported.
5.6 Working guardianship
5.6.1 Work Permit, responsible person, dedicated members account guardian should work shift work content and on-site security measures. Work shift
After members perform confirmation procedures before beginning work.
5.6.2 responsible person, dedicated guardian should always be at the job site, the work of the members of the class monitor. Responsible person in the whole blackout
, You can participate in the work shift work; partial blackout, only if the security measures and reliable person in one place of work, will not mistakenly hit an electric unit
The case points before taking part in the work.
5.6.3 work ticket issuer or the responsible person should be based on security conditions in the field, the scope of work, work needs and other specific circumstances, additional special
Responsible guardian and determines guardianship personnel.
5.7 work intermittently, transfer and termination
5.7.1 When work stopped, working class members should withdraw from the job site, all the security measures remain unchanged. When the next day to return to work should get work
Licensee's license, and the responsible person should re-examine safety measures. It should be under the responsible person or guardians, led by dedicated staff
Enter the workplace.
5.7.2 During work interruption, if an urgent need, operator can switch on power transmission in the case where the ticket is not returned to work, but should first inform workers
As a responsible person in the class get to work all the staff have left the workplace can reply transmission and take the necessary measures to not perform.
5.7.3 before the end of repair work, please contact the device again applied operating voltage, according to the following requirements.
a) all staff to evacuate the workplace;
b) to recover all the work ticket system, remove the temporary cover bar, ground and badges, restore permanent cover bar;
c) shall be responsible for and operating personnel after a comprehensive check and correct, run by the personnel pressor test.
5.7.4 When the same electrical connections sequentially transferred to work in several duty stations, Staff responsible person should explain charged Fan
Wai, safety measures and precautions.
5.7.5 After all the work is completed, the responsible person should run the repair personnel to explain the status of projects, test results, findings and untreated
The problems, together with operating personnel check the device status, the status, fill out the work on the work sheet end time, said after the signature by both workers
For tickets to an end.
5.7.6 Except as provided in 5.7.2 given, but only after all the work the ticket the same power system are the end and get on duty dispatcher or shipped
After the row attendant licensing instructions before switch on power transmission.
6 Safety Measures
6.1 General Requirements
6.1.1 work on electrical equipment, should have power outages, electrical inspection, installation of ground wire, hanging badges and provided cover bar (fence), etc. to ensure the safety of
Technical measures.
6.1.2 work on the electrical equipment to ensure the safety of technical measures performed by the operating personnel or qualified operating personnel.
Insulation 6.1.3 Work safety equipment used should meet the requirements of Appendix E.
6.2 blackout
6.2.1 conforms to the device the following circumstances should a power outage.
a) maintenance equipment;
Specified in Table 2 of the device b) staff working at a distance of less than;
c) from the staff and equipment of more than 35kV and below the safety distance specified in Table 2, but less than the safety distance specified in Table 1,
At the same time nor insulating device partitions, safety cover bar and other measures;
d) portion adjacent staff charged, and no reliable security equipment;
e) Other required power equipment.
Table 2 people working in a safe distance from live parts of the device
Voltage level
kV
safe distance
10 and below 0.35
20,35 0.60
66,110 1.50
220 3.00
330 4.00
500 5.00
750 8.00
1000 9.50
± 50 and below 1.50
± 500 6.80
± 660 9.00
± 800 10.10
Note 1. The table listed voltage level by a high-speed voltage levels safe distance.
Note 2. 13.8kV a safe distance from the implementation of 10kV.
Note 3. 750kV data are corrected altitude 2000m, 1000m above sea level by other levels of data correction.
Each end of the device 6.2.2 power should be obvious break point, or should be able to reflect other electrical and mechanical equipment operating status indication and should not be in
Only by working off the circuit breaker on the power supply equipment.
6.2.3 Disconnect each side of the power equipment circuit breakers, disconnectors and control power switch on energy, the latch operating mechanism isolating switch.
6.2.4 High Voltage Switchgear Handcart switch should be pulled up to the "test" or "maintenance" position.
6.3 electrical test
6.3.1 Direct should use the appropriate electrical inspection electroscope voltage level at the ground of the device-by-phase electrical inspection. Former electrical inspection electroscope should first electric
Confirmed electroscope well on the device. When bad weather conditions, outdoor equipment and other electrical equipment can not directly test can be indirect electrical inspection.
330kV and above electrical equipment may be indirect electrical inspection electrical inspection methods.
6.3.2 examine the electrical high-voltage insulated gloves should be worn from the body with the electrical inspection equipment shall comply with the safety distance requirements in Table 1.
6.4 Grounding
6.4.1 installation of ground wire should not be a single person.
6.4.2 the body should not touch ungrounded conductor.
6.4.3 When the equipment does not verify that the voltage on, should immediately repair equipment ground (or co-installed ground wire grounding switch) and three-phase short circuit. cable
And should gradually phase fully discharge before grounding capacitor neutral point of a star-connected capacitors should be grounded.
6.4.4 possible transmission to each side of the power equipment should be grounded.
6.4.5 assembly and disassembly of the grounding line conductors with insulated rod end, the body should not touch the ground.
6.4.6 do not apply the method of winding to ground or shorted.
6.4.7 Three-phase short-circuit ground wire grounding wire, if using a split-phase grounding wire, three-phase should be set to one of the ground.
6.4.8 Complete grounding wire should have a transparent sheath of multi-strand copper wire and clamp composition dedicated grounding line section not less than 25mm2, and
Installation location should meet the requirements of the short-circuit current.
6.4.9 When installed ground wire, grounding terminal should be installed after the attachment end of the conductor, grounding wire should be good contact, reliable connection. Remove ground wire cis
Order to the contrary.
6.4.10 on power distribution equipment, grounding wire should be installed in the appropriate parts of the conductive portion of the apparatus.
6.4.11 already installed ground wire to oscillate, its distance from the live parts do not meet the safety distance requirements, measures should be taken.
6.4.12 In the frame of the door-type line side power outage maintenance, such as distance from the work site and the installed ground wire or grounding switch is less than 10m, work
Although the location outside the ground, or not to install another ground.
6.4.13 work in high-pressure back on the road, need to remove the portion of the ground wire should obtain licenses or operating personnel on duty dispatcher. After the work is completed
Immediately restored.
6.4.14 because when parallel or near energized equipment maintenance equipment may cause an induced voltage should be installed ground wire or use personal security lines.
6.5 Suspension nameplate and fitted cover bar
6.5.1 to power transmission in a workplace through to closing the isolation switch operating handle should hang "DO NOT TURN, some work" or "ban
Stop closing, the line was working "on the lanes.
6.5.2 Operation at the isolation switch on the computer screen operation should be set to "DO NOT TURN, some work" or "DO NOT TURN line there
Labeled human work ".
6.5.3 partial outage work, staff and security, not power equipment distance does not meet the specified in Table 1 should be provided temporary cover bar, with belt
Tram section shall comply with the provisions of Table 2. Temporary cover bar should be installed securely, and fly the "stop, high risk" on the lanes. 35kV
And insulating spacers of the following devices are available in direct contact with live parts in place a temporary cover bar.
6.5.4 to work on high-voltage equipment indoors, cover bar on both sides should be in the workplace and equipment contralateral run interval and closed to traffic aisles cover
On bar suspension "stop, high risk" on the lanes.
6.5.5 High Voltage Switchgear Handcart swi...
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB 26860-2011_English be delivered?
Answer: Upon your order, we will start to translate GB 26860-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically in 24 hours. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB 26860-2011_English with my colleagues?
Answer: Yes. The purchased PDF of GB 26860-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to
[email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.