|
US$149.00 ยท In stock Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 19079.29-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 29: Ice climbing place Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB 19079.29-2013 | English | 149 |
Add to Cart
|
2 days [Need to translate]
|
Operation conditions and technical requirements for gymnasium and playground -- Part 29: Ice climbing place
| Valid |
GB 19079.29-2013
|
PDF similar to GB 19079.29-2013
Basic data | Standard ID | GB 19079.29-2013 (GB19079.29-2013) | | Description (Translated English) | Operation conditions and technical requirements for gymnasium and playground -- Part 29: Ice climbing place | | Sector / Industry | National Standard | | Classification of Chinese Standard | Y55 | | Classification of International Standard | 97.220 | | Word Count Estimation | 5,534 | | Quoted Standard | GB/T 23268.1 | | Regulation (derived from) | National Standards Bulletin 2013 No. 27 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the climbing sports should have the basic conditions for an open and basic technical requirements. This standard applies to all types of climbing open to the community sports facilities. |
GB 19079.29-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 29: Ice climbing place ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Operation conditions and technical requirements for gymnasium and playground.Part 29. Ice climbing place
ICS 97.220
Y55
National Standards of People's Republic of China
Sports venues open conditions and technical requirements
Part 29. climbing places
Part 29. Iceclimbingplace
Issued on. 2013-12-31
2014-12-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
All technical content in this Part of GB 19079 is mandatory.
GB 19079 "sports venues open conditions and technical requirements" is divided into the following sections.
--- Part 1. swimming places;
--- Part 2. Karting place;
--- Part 3. Bungee place;
--- Part 4. rock climbing places;
--- Part 5. Skating place;
--- Part 6. skiing;
--- Part 7. figure skating place;
--- Part 8. Shooting place;
--- Part 9. Archery place;
--- Part 10. Dive sites;
--- Part 11. rafting place;
--- Part 12. gliding wing place;
--- Part 13. Balloon and Airship place;
--- Part 19. expansion spaces;
--- Part 20. hockey place;
--- Part 21. Boxing place;
--- Part 22. Taekwondo place;
--- Part 23. trampoline place;
--- Part 24. Aircraft movement places;
--- Part 25. skydiving place;
--- Part 26. aerospace model places;
--- Part 27. Directional, radio direction finding places;
--- Part 28. Sanda place;
--- Part 29. climbing places;
--- Part 30. Mountain outdoor venues;
--- Part 31. Alpine Adventure venues;
This is Part 29 GB 19079's.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This section is proposed and managed by the State Sports General Administration.
This section is drafted. State Sports General Administration mountaineering Management Center, the State Sports General Administration of Sports Science Institute.
The main drafters of this section. Ma Xinxiang, Ding Xianghua, Caorong Wu, Zhou Peng, Wang Yunlong.
Sports venues open conditions and technical requirements
Part 29. climbing places
1 Scope
GB 19079 of the provisions of this part of the climbing sports should have the basic conditions for open and basic technical requirements.
This section applies to all types of sport climbing places open to the public.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 23268.1 sports protective equipment requirements - Part 1. Dynamic mountaineering rope
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Sport climbing iceclimbing
On the ice wall formed naturally or artificially constructed for the climbing activities.
3.2
Ice climbing places iceclimbingplace
A venue to meet people climbing sports training, competition, fitness and leisure activities. Including naturally formed ice waterfall, glacier ice
Climbing wall and other natural breaks and artificially constructed ice climbing sites.
3.3
Ice climbing technical equipment techniqueequipmentforiceclimbing
Carry equipment when climbing sports use. Including ropes, belts, helmets, carabiners, slings, protection, ice ax, crampons, ice picks and so on.
3.4
Ice climbing technical guidance personnel iceclimbinginstructor
Teach the theory and technical ice climbing, ice climbing instructors to carry out activities.
4 Qualifying
Ice climbing technical guidance personnel should hold the relevant national vocational qualification certificate before taking.
5 places, facilities and conditions
5.1 Nature climbing places
5.1.1 shall meet the horizontal distance between the adjacent climbing not less than 3m.
5.1.2 complete freeze ice wall should be placed piton protection Equip.
5.1.3 Each top-set force protection system should not be less than 8kN.
5.2 Artificial climbing places
5.2.1 shall meet the horizontal distance between the adjacent climbing not less than 3m.
5.2.2 Each top protection system should be connected to the support structure, and the discontinuity of less than 8kN.
5.2.3 should be frozen ice wall complete, and has strong support structure.
5.3 technical climbing equipment
5.3.1 The climbing rope should be used to protect Dynamic mountaineering ropes. Dynamic mountaineering rope technical indicators should be consistent with GB/T 23268.1 requirements.
5.3.2 crampons, ice axes, ice picks, helmets, seat belts, locks and other equipment should be climbing sling special products, with a quality product inspection
Proof, and periodic inspection.
6 Security
6.1 should establish and improve the safe production responsibility system for posts, rescue and safety management system, equipment and facilities maintenance system, environmental management and health
system.
6.2 should develop emergency response plans.
6.3 During the open should be provided with at least one technical climbing instructors.
6.4 should be equipped with "ice climbing event INSTRUCTIONS" prominently on matters related to safety and special requirements to make real clear instructions and warnings
Shows, and safety tips.
6.5 induction climbing places employees should wear clearly marked.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 19079.29-2013_English be delivered?Answer: Upon your order, we will start to translate GB 19079.29-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 19079.29-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB 19079.29-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|