HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB 19079.20-2013 English PDF

US$139.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 19079.20-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 20: Ice hockey area
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 19079.20-2013English139 Add to Cart 3 days [Need to translate] Operation conditions and technical requirements for gymnasium and playground -- Part 20: Ice hockey area Valid GB 19079.20-2013

PDF similar to GB 19079.20-2013


Standard similar to GB 19079.20-2013

GB/T 20394   GB 24429   GB 17498.6   GB 19079.21   GB 19079.22   GB 19079.13   

Basic data

Standard ID GB 19079.20-2013 (GB19079.20-2013)
Description (Translated English) Operation conditions and technical requirements for gymnasium and playground -- Part 20: Ice hockey area
Sector / Industry National Standard
Classification of Chinese Standard Y55
Classification of International Standard 97.220
Word Count Estimation 6,645
Quoted Standard GB 9664; GB/T 10001.1
Regulation (derived from) National Standards Bulletin 2013 No. 27
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the puck open spaces should have the basic conditions and technical requirements. This standard applies to all types of hockey to the community open spaces.

GB 19079.20-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 20: Ice hockey area


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Operation conditions and technical requirements for gymnasium and playground.Part 20. Ice hockey area ICS 97.220 Y55 National Standards of People's Republic of China Sports venues open conditions and technical requirements Part 20. hockey place Part 20. Icehockeyarea Issued on. 2013-12-31 2014-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

All technical content in this Part of GB 19079 is mandatory. GB 19079 "sports venues open conditions and technical requirements" is divided into the following sections. --- Part 1. swimming places; --- Part 2. Karting place; --- Part 3. Bungee place; --- Part 4. rock climbing places; --- Part 5. Skating place; --- Part 6. skiing; --- Part 7. figure skating place; --- Part 8. Shooting place; --- Part 9. Archery place; --- Part 10. Dive sites; --- Part 11. rafting place; --- Part 12. gliding wing place; --- Part 13. Balloon and Airship place; --- Part 19. expansion spaces; --- Part 20. hockey place; --- Part 21. Boxing place; --- Part 22. Taekwondo place; --- Part 23. trampoline place; --- Part 24. Aircraft movement places; --- Part 25. skydiving section; --- Part 26. aerospace model places; --- Part 27. Directional, radio direction finding places; --- Part 28. Sanda place; --- Part 29. climbing places; --- Part 30. Mountain outdoor venues; --- Part 31. Alpine Adventure venues; This is Part 20 GB 19079's. This section drafted in accordance with GB/T 1.1-2009 given rules. This section is proposed and managed by the State Sports General Administration. This section is drafted. State Sports General Administration Winter Sports Management Center, the State Sports General Administration of Sports Science Institute. The main drafters of this section. to Tiande, Ji Junfeng, paragraph Kikuyoshi, Wang Qiang. Sports venues open conditions and technical requirements Part 20. hockey place

1 Scope

This part of GB 19079 specifies the puck open spaces should have the basic conditions and technical requirements. This section applies to all types of hockey open to the public place.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 9664 Hygienic standard for culture and entertainment GB/T 10001.1 Public information graphical symbols - Part 1. Common symbols

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Puck place icehockeyarea Place to meet people to hockey training, competition, fitness and leisure activities. Note. Includes indoor ice rink and outdoor ice rink. 3.2 Hockey equipment icehockeyfacilitiesandequipment When people need to use the hockey event equipment and safety equipment. Note. Supplies include hockey skates, hockey sticks, hockey; hockey protective gear including helmets, elbow pads, chest protector, shin, gloves, drop pants, jockstrap, neck protection and so on. 3.3 Puck technical guidance personnel icehockeytechnicalinstructor Teaching theory and skills of ice hockey personnel.

4 Qualifying

4.1 puck technical guidance personnel should hold the relevant national vocational qualification certificate before taking. 4.2 First aid personnel should go through relevant training and proved. 5 places, facilities and conditions 5.1 indoor ice rink 5.1.1 hockey venue Ice hockey venues per capita area of not less than 15m2, ice hockey and other skating venue site should be isolated. 5.1.2 ice surface temperature Ice surface temperature should not exceed -3 ℃. 5.1.3 ice thickness Ice thickness not less than 3.5cm. 5.1.4 ice requirements Ice surface should be smooth, flat, clean, and shall not affect the skating cracks. 5.1.5 boundary wall Ice shall be provided around the boundary wall, the height measured from the ice surface shall not be less than 1.17m. It should be provided with a minimum of two entrances and a sweeping ice car Entrance. Boundary wall to the side of the ice surface should be smooth, no projections, the boundary wall junction gap should not be greater than 3mm. 5.1.6 rink lighting Ice rink illumination should be not less than 400lx. 5.1.7 protection facilities Within rink channel shall be covered with a protective plastic mat skates, ice field facilities and equipment should be made of product quality inspection certificate. 5.1.8 protective glass Boundary wall should be installed in special protective glass, the height should not be less than 60cm. 5.1.9 Protection Network Ice rink outside the goal behind the rink if people activities in border wall behind the goal should install protective nets, which should ensure a high degree of Hockey not fly off. 5.1.10 goal Welding goal should be no breaks, open solder. 5.2 outdoor rink 5.2.1 rink Specifications Puck site area shall not be less than 500m2, ice hockey and other places should skate isolated places. 5.2.2 ice surface temperature and ice thickness Ice rink set up in the river, the lake should be considered icy, ice surface temperature, ice thickness, solar terms and other factors, confirming the premise of adequate security By only open to the public. 5.2.3 ice requirements Ice surface should be smooth, flat, clean, and shall not affect the skating cracks. 5.2.4 boundary wall Ice shall be provided around the boundary wall, the height measured from the ice surface shall not be less than 1.17m. It should be provided with a minimum of two entrances. Boundary wall to the ice Side should be smooth and free of projections, the boundary wall junction gap should not be greater than 3mm. 5.2.5 Protection Network Ice rink outside the goal behind the rink if people activities in border wall behind the goal should install protective nets, which should ensure a high degree of Hockey not fly off. 5.2.6 rink lighting Nighttime illumination shall be not less than 400lx. 5.2.7 protection facilities Within rink channel shall be covered with a protective plastic skate pad. Ice venue facilities and equipment should be made of product quality inspection certificate. 5.3 Hockey Equipment Hockey puck areas and equipment should be made of product quality inspection certificate. 5.4 Auxiliary Facilities 5.4.1 rink shall be provided with dressing area. 5.4.2 shall be provided toilet. 5.4.3 shall be provided with broadcasting equipment. 5.4.4 Public instructions should be consistent with the identification GB/T 10001.1 requirements. 6 health, environmental management Rink sanitation should meet the requirements of GB 9664's.

7 Security

7.1 should establish and improve the safe production responsibility system for posts, rescue and safety management system, equipment and facilities maintenance system, environmental management and health And other systems. 7.2 should develop emergency response plans. 7.3 shall be provided. "Puck activity INSTRUCTIONS" prominently on matters related to safety and special requirements to make real and clear instructions Warning. 7.4 point mark the event should have first aid and emergency personnel. Emergency medicine and equipment placed in an obvious location for easy access. 7.5 Ice top clubs should install safety plugs. 7.6 outdoor ice rink in hazardous areas should be set clear, eye-catching warning signs and security facilities. Participate in the activities of personnel 7.7 Hockey Puck technical guidance personnel shall comply with the requirements of worn hockey protective gear. 7.8 puck spaces should be equipped with at least two pucks technical guidance personnel, and technical guidance personnel list publicity puck and photo prominently. 7.9 puck places employees induction should wear clearly marked. 7.10 emergency exit and evacuation routes should be identified and kept clear.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 19079.20-2013_English be delivered?

Answer: Upon your order, we will start to translate GB 19079.20-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 19079.20-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB 19079.20-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.