HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GA/T 509-2004 English PDF

US$799.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GA/T 509-2004: Terminology of urban traffic signal control system
Status: Obsolete
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GA/T 509-2004English799 Add to Cart 4 days [Need to translate] Terminology of urban traffic signal control system Obsolete GA/T 509-2004

PDF similar to GA/T 509-2004


Standard similar to GA/T 509-2004

GB 5768.2   JT/T 489   GB 5768.1   GA/T 850   GA/T 993   GA/T 299   

Basic data

Standard ID GA/T 509-2004 (GA/T509-2004)
Description (Translated English) Terminology of urban traffic signal control system
Sector / Industry Public Security (Police) Industry Standard (Recommended)
Classification of Chinese Standard R80
Classification of International Standard 01.040.93
Word Count Estimation 20,294
Date of Issue 2004-08-09
Date of Implementation 2004-10-01
Summary This standard specifies the terminology used in urban traffic signal control systems. This standard applies to urban traffic signal control system design, management, mathematics, scientific research and other related fields.

GA/T 509-2004: Terminology of urban traffic signal control system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Terminology of urban traffic signal control system ICS 01.040.93 R80 People's Republic of China Public Safety Industry Standard Urban Traffic Signal Control System Terminology Released on.2004-08-09 Implementation of.2004-10-01 Ministry of Public Security

Content

Foreword III 1 Scope 1 2 Basic terms and definitions 1 3 Terms and definitions of traffic control principles 1 4 Control methods related terms and definitions 7 5 Traffic signal related terms and definitions 8 6 System related terms and definitions 9 Reference 11 Chinese index 12 English index 14

Foreword

This standard is proposed and managed by the Ministry of Public Security Road Traffic Management Standardization Technical Committee. This standard was drafted by the Traffic Management Science Research Institute of the Ministry of Public Security. The main drafters of this standard. Zhao Yongjin, Qiu Hongtong, Wang Changjun, Yuan Jianhua, Yuan Lei, Bao Yongqiang. Urban Traffic Signal Control System Terminology

1 Scope

This standard specifies special terms in urban traffic signal control systems. This standard applies to the design, management, teaching, research and other related fields of urban traffic signal control systems.

2 Basic terms and definitions

2.1 Legally valid light color information that is passed or stopped on the road to vehicles and pedestrians. 2.2 Signal light A device for displaying a traffic signal (2.1) in which the red, yellow, and green lights are arranged in order. 2.3 Signal control Use traffic lights (2.2) to direct vehicles and pedestrians running on the road. 2.4 Traffic signal Signal machine A device that can change the order of road traffic signals (2.1), adjust timing, and control the operation of road traffic lights (2.2). [GA 47-2002, Terms and Definitions 3.1] 2.5 A device that detects the presence and passing state of the vehicle. 2.6 Traffic signal control system trafficsignalcontrolsystem UTCS It is composed of intersection signal equipment, detection equipment, communication equipment, control computer and related software for urban road traffic control. system.

3 Terms and definitions related to traffic control principles

3.1 The characteristics of time and space changes of traffic flow.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GA/T 509-2004_English be delivered?

Answer: Upon your order, we will start to translate GA/T 509-2004_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GA/T 509-2004_English with my colleagues?

Answer: Yes. The purchased PDF of GA/T 509-2004_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.