| 
           
             
       
   
   US$789.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 1739-2020: Access control system - Controller Status: Valid    
      
    
  
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF | 
		 
			| GA/T 1739-2020 | English | 789 | 
   Add to Cart
   | 
                    6 days [Need to translate]
                 | 
                    Access control system - Controller
                 | Valid | 
                    GA/T 1739-2020
                 | 
		 
	 
     
     
  
	 
       PDF similar to GA/T 1739-2020 
    
   
    
     
          
  
  
    
  Basic data             |  Standard ID  |          GA/T 1739-2020 (GA/T1739-2020) |               |  Description (Translated English)  |          Access control system - Controller |               |  Sector / Industry  |          Public Security (Police) Industry Standard (Recommended) |               |  Classification of Chinese Standard  |          A91 |               |  Classification of International Standard  |          13.310 |               |  Word Count Estimation  |          34,392 |               |  Date of Issue  |          2020-09-09 |               |  Date of Implementation  |          2021-02-01 |               |  Issuing agency(ies)  |          Ministry of Public Security |         
  GA/T 1739-2020: Access control system - Controller---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.  
Access control system--Controller
ICS 13.310
A91
Public Safety Industry Standards of the People's Republic of China
Access control system controller
2020-09-09 release
2021-02-01 implementation
Issued by the Ministry of Public Security of the People's Republic of China
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions, abbreviations and symbols 1
3.1 Terms and definitions 1
3.2 Abbreviations 2
3.3 Symbol 2
4 Equipment composition 2
5 Classification and marking 3
5.1 Security Level 3
5.2 Installation category 4
5.3 Environmental category 4
5.4 Identification 4
6 Function and performance 5
6.1 Access control point 5
6.2 Instructions/Notice 6
6.3 Identification 8
6.4 Coercion 9
6.5 Priority control 10
6.6 Communication 10
6.7 Self-protection 10
7 Power supply 12
8 Electrical safety 12
8.1 Insulation resistance 12
8.2 Electric strength 12
8.3 Leakage current 12
8.4 Temperature rise 12
8.5 Flame retardant 12
8.6 Overcurrent protection 12
8.7 Overvoltage operation 13
8.8 Marking resistance 13
9 Environmental adaptability 13
9.1 High temperature (working state) 13
9.2 Low temperature (working state) 13
9.3 Constant heat and humidity 13
9.4 Temperature change (working state) 13
9.5 Sinusoidal vibration 13
9.6 Shock 13
9.7 Salt spray cycle durability 13
9.8 Enclosure protection class 13
10 Electromagnetic compatibility 14
10.1 Immunity to power supply voltage dips and short-term interruptions 14
10.2 Electrostatic discharge immunity 14
10.3 Radio-frequency electromagnetic field radiation immunity 14
10.4 Immunity to conducted disturbances induced by radio frequency fields 14
10.5 Immunity to electrical fast transient pulse groups 14
10.6 Surge (impact) immunity 14
10.7 Radio disturbance limit 14
11 Test method 14
11.1 General conditions 14
11.2 Simplified function test 15
11.3 Inspection of access control points 15
11.4 Instruction/notification requires inspection 17
11.5 Identification requirements inspection 18
11.6 Duress function test 19
11.7 Priority control function inspection 19
11.8 Communication function test 19
11.9 Self-protection function test 19
11.10 Power supply requirement test 20
11.11 Electrical safety test 21
11.12 Environmental adaptability test 22
11.13 Electromagnetic compatibility test 23
12 Inspection rules 24
12.1 Inspection classification 24
12.2 Inspection items and sequence 24
12.3 Batching rules and sampling rules 25
12.4 Judgment Rules 26
13 Document Provision 26
13.1 File content 26
13.2 Information provided with ACU 26
13.3 File format 26
13.4 Identification file 27
14 Marking, packaging, transportation and storage 27
14.1 Marking 27
14.2 Packaging 27
14.3 Transportation 27
14.4 Storage 27
Appendix A (Normative Appendix) Timing Diagram 28
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This standard was proposed and managed by the National Standardization Technical Committee for Security and Alarm System (SAC/TC100).
Drafting organizations of this standard. Beijing Axis Technology Development Co., Ltd., the First Research Institute of the Ministry of Public Security, and the Department of National Security and Alarm
Central Product Quality Supervision and Inspection Center (Beijing), National Security Alarm System Product Quality Supervision and Inspection Center (Shanghai), Haoyun Technology Co., Ltd.
Co., Ltd., Shenzhen Jieshun Technology Industrial Co., Ltd.
The main drafters of this standard. Zhu Feng, Tao Lei, Jin Wei, Lu Yuhua, Shi Yuan, Long Zhongsheng, He Jun, Long Gang, Zhu Hongliang, Li Jingshan, Yan Jin,
Sun Liping, Wu Wen, Li Wenjie.
Access control system controller
1 Scope
This standard specifies the equipment composition, classification and identification, function and performance, power supply, electrical safety, and environmental fitness of entrance and exit controllers.
Compliance, electromagnetic compatibility, test methods, inspection rules, document provision, as well as marking, packaging, transportation and storage.
This standard applies to the design, manufacture and inspection of entrance and exit controllers.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 2423.3-2016 Environmental Test Part 2.Test Method Test Cab. Constant Humidity Test
GB/T 2828.1 Sampling inspection procedure by attributes Part 1.Batch inspection sampling plan retrieved by acceptance quality limit (AQL)
GB/T 2829 Periodic Inspection Sampling Procedures and Tables by Attributes (Applicable to the Inspection of Process Stability)
GB/T 4208-2017 Enclosure protection grade (IP code)
GB/T 9254-2008 Information Technology Equipment Radio Disturbance Limits and Measurement Methods
GB/T 15211-2013 Environmental adaptability requirements and test methods for security alarm equipment
GB/T 15408 Security System Power Supply Technical Requirements
GB 16796-2009 Safety requirements and test methods for security alarm equipment
GB/T.20138-2006 The degree of protection of electrical equipment enclosures against external mechanical collisions (IK code)
GB/T 30148-2013 EMC immunity requirements and test methods for safety protection alarm equipment
GB/T 37078 Technical requirements for entrance and exit control system
3 Terms and definitions, abbreviations and symbols
3.1 Terms and definitions
The following terms and definitions defined in GB/T 37078 apply to this document.
3.1.1
Multiple occupancy
Ensure that at any time, the number of staying targets is not less than the minimum number of staying targets (two or more) set in the designated controlled area
System functions.
Note. Also called multi-occupancy.
3.1.2
Resident target inventory rolcal
List the system functions of the vouchers and/or target information staying in the controlled area.
Note. Also called roll call.
3.1.3
Self-protection
Measures used to prevent, detect and/or report, intentionally and unintentionally damage and/or interfere with the normal operation of the equipment.
   
   
  
  
    
  Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 1739-2020_English be delivered?Answer: Upon your order, we will start to translate GA/T 1739-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 1739-2020_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 1739-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):  List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to  [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.  
        
   
        
       
          
               
 
          |