HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

CNCA CGP-07-2021 English PDF

US$759.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
CNCA CGP-07-2021: Green Product Certification Implementation Rules - Thermal Insulation Materials

CNCA CGP-07: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
CNCA CGP-07-2021English759 Add to Cart 6 days [Need to translate] Green Product Certification Implementation Rules - Thermal Insulation Materials CNCA CGP-07-2021
CNCA CGP-07-2020English789 Add to Cart 6 days [Need to translate] (Green product certification implementation rules) CNCA CGP-07-2020

PDF similar to CNCA CGP-07-2021


Standard similar to CNCA CGP-07-2021

CEL 038   CNCA 00C-007   CFNR-LC-01-01   CNAS AL09   CNCA CGP-01   CNAS CL07   

Basic data

Standard ID CNCA CGP-07-2021 (CNCA-CGP-07-2021)
Description (Translated English) Green Product Certification Implementation Rules - Thermal Insulation Materials
Sector / Industry China Compulsory Certification (CCC) Implementation Rules
Classification of Chinese Standard CNC
Word Count Estimation 33,380
Issuing agency(ies) China National Accreditation Administration for Certification and Accreditation

CNCA CGP-07-2021: Green Product Certification Implementation Rules - Thermal Insulation Materials

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Green Product Certification Implementation Rules - Thermal Insulation Materials Number. CNCA -CGP-07.2021 Green product certification implementation rules Insulation material Issued by the National Certification and Accreditation Administration Commission June 1, 2021 release Implementation on June 1, 2021

contents

1 Scope of application...2 2 Authentication mode...2 3 Certification process and certification time limit...2 4 Certification application...2 5 Initial inspection...4 6 Product sampling inspection...7 7 Evaluation and approval of certification results...8 8 Supervision after certification...8 9 Expanding or shrinking the application...10 10 Certification...11 11 Use of the certification mark...12 12 Charges...12 13 Miscellaneous...12 Attachment 1 List of key raw materials for record...14 Appendix 2 Green Product Self-evaluation Form...17 Appendix 3 Green Product Certification Factory Assurance Capability Inspection Requirements...22 Appendix 4 Sampling Inspection Plan...29

1 Scope of application

This rule applies to rock wool, glass wool, molded polystyrene foam, flexible foam rubber and foam Green product certification for glass. Due to changes in laws and regulations or related product standards, technology, industrial policies and other factors The adjustment of the application scope shall be subject to the announcement issued by the CNCA.

2 Authentication mode

The certification mode is. initial inspection, product sampling inspection, and supervision after certification.

3 Certification process and certification time limit

3.1 Certification process The basic process of certification includes. 1) Application for certification 2) Initial inspection 3) Product sampling inspection 4) Evaluation and approval of certification results 5) Supervision after certification Note. The initial inspection includes data technical review and on-site inspection. 3.2 Certification time limit From the day when the certification commission is officially accepted to the day when the certification certificate is issued, generally no more than 90 days, including Including initial inspection, certification result evaluation and approval, and certificate production time. Because the client did not submit the materials in time, could not accept the on-site inspection as planned, and did not submit the documents in time. Comply with rectification, failure to send inspection samples in time, failure to pay fees in time, and special sample inspection cycle If the authentication time is prolonged due to other reasons, it will not be counted.

4 Certification application

4.1 Classification of certification units The division of certification units for insulation materials is shown in Table 1.The same production enterprise, the same product, but the production site When the locations are different, they should be used as different authentication units. 5) The certification client, manufacturer, and production plant have no major safety and environmental pollution accident statements in the past three years, (If the company has been established for less than three years, it will be provided from the date of company establishment to the date of application); 6) Product process flow chart; 7) Organization chart of the production plant; 8) The product meets the requirements of current national or industry standards and has a valid type inspection report (provided by CMA Issued by a qualified testing agency); 9) The production plant is built according to GB/T 19001, GB/T 24001, GB/T 23331 and GB/T 45001 respectively Establish and operate quality management system, environmental management system, energy management system and occupational health and safety Effective certification documents of the management system; 10) Submit the key raw material filing list according to the certification unit (see Annex 1); 4.4 Acceptance After receiving the application documents, the certification body shall conduct a compliance review of the application documents in accordance with the relevant review requirements. If the application documents do not meet the requirements, the certification client should be notified to supplement them. After the documents are complete, work in 3 A notice of acceptance or non-acceptance will be issued within days. Upon acceptance, the certification body signs a certification agreement with the certification client.

5 Initial inspection

5.1 Preparation for inspection 5.1.1 Inspection plan and inspection team composition The certification body shall develop a plan for its on-site inspection, which shall be based on the relevant green product evaluation standards. Requirements, and adapt to the purpose and scope of the inspection. The certification body shall select qualified personnel to form an inspection team. When determining the size and composition of the inspection team, It should be based on the operation of the production plant’s management system, the scope of the certified product, the technical characteristics, data and The complexity of the information system and the professional background and practical experience of the inspector are determined. Before the inspection team enters the on-site inspection, it should complete the self-assessment form and relevant information submitted by the certification client according to Annex 2. Technical review of confirmatory information. 5.1.2 Data technical review 5.1.2.1 Assessment purpose Through the technical review of the application documents, self-assessment form and confirmatory materials submitted by the certification client, understand And master the degree of compliance of the products and companies applying for certification to GB/T 35608-2017, as well as the company’s factory Ensure the degree of ability-related management documents to comply with this implementation rule, determine whether it can enter the on-site inspection, and Further identify the ideas and key points of follow-up factory inspections. 5.1.2.2 Reviewer days The number of man-days for the technical review of data for a certification unit is 2 person-days. With the increase of the certification unit, it depends on the product The degree of complexity can increase man-days as appropriate, up to 3 man-days. 5.1.2.3 Review content The content of the assessment includes the application documents submitted by the certification client, self-assessment form and corroborating materials, focusing on Technical review is carried out in the following three aspects. 1) The legality review of the organization Including the existence and legitimacy of the qualifications of relevant institutions such as certification clients, manufacturers and production plants, and OEM/ODM intellectual property relationship (when applicable), etc. 2) Review of completeness, adaptability and effectiveness of documents The content of the document should be able to completely cover the corresponding requirements specified in this Annex 2 to avoid the occurrence of missing items. The content of the document should be suitable to support the compliance of the applicant enterprise and product with the requirements of GB/T 35608-2017 and this rule Review. The status of the relevant conformity assessment results represented by the content of the document should be valid. For example, the certification certificate should be in Within the validity period. 3) Compliance judgment of the factory's guarantee ability. 5.1.2.4 Review time limit After the certification body accepts the certification application, in principle, it should complete the technical review of the data within 15 working days. The time for the certification client to prepare the self-assessment form and the corresponding supporting information is not included in the calculation. 5.1.2.5 Review conclusion The data technical review conclusions can include the following aspects. 1) On-site inspection can be carried out if it meets the requirements; 2) Basically meet the requirements, but some content needs to be supplemented and perfected, and the whole can be submitted during the on-site inspection. Change the evidence; 3) It does not meet the requirements and cannot be inspected on site. 5.2 On-site inspection 5.2.1 Basic principles 1) In principle, the on-site inspection should be performed after the technical review of the materials meets the requirements or basically meets the requirements (can be The inspection will be completed within 30 working days after submitting the rectification evidence directly. The contents of the on-site inspection include. a) Green product certification factory assurance ability inspection; b) Product consistency check; c) Green evaluation requires compliance verification. 2) The on-site inspection shall cover all products and production sites for which certification is applied. For certification with green products Relevant, but located in other places and departments other than the actual production site of the production enterprise, select appropriate according to the situation The inspection plan, including adopting the enterprise’s self-declaration or other conformity assessment results. 3) During the on-site inspection, the factory shall normally produce one or more products within the scope of application for certification. 5.2.2 Factory assurance ability inspection The factory assurance ability inspection shall cover all production sites involved in the certification unit, and shall be carried out in accordance with Annex 3 "Green Product certification factory assurance ability inspection requirements" are carried out. 5.2.3 Product consistency check The certification body randomly selects the certified products from the products that have been confirmed as qualified by the enterprise, including but not limited to Consistency check of the following. 1) The consistency between the certified product and the application document or certificate; 2) The product name, model, manufacturer, and related logos and applications clearly stated on the body or packaging of the certified product Consistency of the request or certificate; 3) Consistency between the key raw materials of the certified product and the key raw materials of the registered product. During the initial factory inspection, the consistency of the products of all certified units shall be checked. 5.2.4 Verification of compliance with green evaluation requirements According to GB/T 35608-2017, verify the basic requirements, resource attribute indicators, Compliance with energy attribute indicators, environmental attribute indicators and some quality attribute indicators. Certification body Its actual internal control operation status should be at the production site, including the involved documents, records, objects, personnel, equipment It shall meet the relevant regulations of some quality attribute indicators in GB/T 35608-2017, see Annex 4 for details. 6.2 Sampling inspection plan After the certification body accepts the certification entrustment and determines the inspection plan, it can conduct product sampling inspections. Sampling inspection See Annex 4 for the plan. 6.3 Implementation of sampling inspection Sampling inspection should be determined by the certification body and possess CMA qualification (need to cover the test basis mentioned in Annex 4) The laboratory is completed. The laboratory shall inspect the samples and ensure that the inspection conclusions are true and accurate. A complete record of the process is made and archived to ensure the traceability of the inspection process and results. 6.4 Use other test results If the certification principal can provide an inspection report that also meets the following requirements for the products of the certification unit, the certification The certification body can use this inspection report as the result of the product sampling inspection. 1) Sampling inspection report issued by a CMA-qualified laboratory; 2) The inspection items, technical requirements, sampling methods, inspection methods, etc. in the report comply with GB/T 35608-2017 And the provisions of this rule; 3) In principle, the date of issuance of the inspection report is within 12 months before the on-site inspection.

7 Evaluation and approval of certification results

The certification body conducts a comprehensive evaluation of the product sampling inspection and initial inspection conclusions. After the evaluation is passed, the certification In principle, the organization should issue a green product certification certificate to the certification client within 5 working days. The unit issues a certificate.

8 Supervision after certification

8.1 Monitoring time In principle, the company can arrange supervision 6 months after obtaining the certificate, and the time interval between each supervision should not exceed 1 year. like When one of the following situations occurs, the frequency of supervision can be increased, and the timing of supervision can be without prior notice. 1) The certified product has serious quality problems or the user submits a complaint, and it is verified to be the manufacturer, manufacturer Commercial responsibility 2) The certification body has sufficient reasons to question the conformity of the certified product with the certification standard; 3) There is sufficient information to indicate that the manufacturer and the production plant have changed the organization, production process, and quality management System, etc., which may affect product conformity or consistency. 8.2 Supervision content Each supervision shall cover all production enterprises (sites) and cover all valid certificates. Supervised content Should include. 1) Supervision and inspection of factory assurance ability; 2) Supervision and inspection of product consistency; 3) Green evaluation requires continuous compliance verification; 4) Supervision and inspection; 5) The validity verification of the rectification measures for non-conformance items in the last evaluation, the use of certification certificates and logos, Implementation of laws, regulations and other requirements, etc. 8.2.1 Supervision and inspection of factory assurance ability The factory assurance capability supervision and inspection shall cover all production sites involved in the certification unit. Terms must be checked every time It is the items 3, 5, 6, 10, and 11 of Annex 3.The remaining items can be checked appropriately and covered within one certification cycle All terms. 8.2.2 Supervision and inspection of product consistency The product consistency supervision and inspection shall cover at least the certified products of each unit, and the rest shall be in accordance with the provisions of 5.2.3 conduct. 8.2.3 Green evaluation requires continuous compliance verification Green evaluation requires continuous compliance verification in accordance with 5.2.4.Enterprises should respond to all certification units The products are self-evaluated and ensure that they meet the requirements. In principle, the certification body can extract representative certification units In a certification cycle, all certification units shall be covered. 8.2.4 Product supervision and inspection Carry out the supervision and inspection of certified products according to the certified units, and in principle, select representative certification units, one Cover all representative certified products of all certification units within one certification cycle. For other requirements of supervision and inspection, please refer to The provisions of this document 6.When other inspection results are used in accordance with 6.4, the products involved in the previous certification shall be selected The sample inspection report cannot be regarded as an admissible result of the current surveillance inspection. 8.3 Supervision and inspection man-days In principle, the number of man-days for supervision and inspection should not be less than 50% of the number of man-days for the initial on-site inspection. Management system When the operating conditions change, it needs to be re-approved. 8.4 Supervision and inspection conclusion The conclusions of supervision and inspection can be divided into the following three situations. 1) Supervision and inspection passed Green evaluation requires continuous compliance evaluation, factory assurance ability supervision and inspection, and product consistency supervision and inspection The inspection and product supervision and inspection passed, and no non-conformities were found in the factory assurance ability supervision and inspection. 2) Pass after verifying that the corrective actions are qualified Product supervision and inspection have passed, and the green evaluation requires continuous compliance verification, factory assurance capabilities and products Consistency supervision and inspection found that there are general non-conformities, and rectification within a time limit may be allowed, and the inspection team shall report to the inspection team for written materials for verification. If the measures are effective, the supervision and inspection are passed. 3) Failed to pass the supervision and inspection Green evaluation requires that continuous conformity evaluation fails, or product supervision and inspection fails, or factory guarantees Ability supervision and inspection, product consistency supervision and inspection have found that there are serious systemic defects and other problems, which shall be determined The supervisory inspection fails or the inspection is terminated. 8.5 Evaluation of supervision and inspection results The certification body conducts a comprehensive evaluation of information such as the conclusions of the supervision and inspection. Those who pass the evaluation can continue to be green Color product certification certificate, use green product certification mark. If the evaluation fails, the certification body shall follow 10.5 According to the corresponding circumstances, the relevant regulations shall make the cancellation/suspension/withdrawal of the certification certificate and shall be announced.

9 Expand or shrink the application

Within the validity period of the certification certificate, if the certification client needs to expand the scope of certification, the part of the expanded unit shall be According to the initial certification procedure, the number of expanded man-days per unit shall not be less than 1 man-day. When expanding the certified products in the certification unit, the materials provided by the certification client shall meet the certification requirements, and In the next supervision and inspection, verification will be given. If the certification unit needs to be reduced during the annual supervision, the number of on-site inspection man-days shall be reduced as appropriate. 10 Certification 10.1 Maintenance of certificates The validity period of the certificate is 5 years, and the validity of the certificate is maintained through regular supervision. If the validity period of the certification certificate has expired and it needs to be used continuously, the certification client shall Apply for renewal within the first 90 days. If the result of the last inspection after obtaining the certificate within the validity period of the certificate is qualified, the certification The institution shall directly renew the certificate after receiving the application for renewal. 10.2 Certificate Covered Content The certification certificate shall include the following basic contents. 1) The name and address of the certification client/manufacturer/manufacturer; 2) The name of the certification unit, and the product name, series, specification and model, etc.; 3) Certification basis; 4) Authentication mode; 5) Date of issuance and validity period; 6) The name of the certification body; 7) Certificate number; 8) Other content that needs to be marked in accordance with the law. 10.3 Change of certificate The certification client changes the organization, production address, production conditions, production process, production Equipment, production consistency control plan, product name/model, etc., which may affect the content of the certificate. When the certified product undergoes technical changes that may affect the compliance with the relevant standards; or the product standard changes When the new test may affect the conclusion of the test, the certification client shall submit a written application for change to the certification body. By the authentication machine The organization evaluates the degree of consistency between the changed content and the original certification scope, and conducts supplementary reviews, inspections or inspections based on the differences Inspection of. For those that meet the requirements, the certification body shall approve the change and issue a new certificate. The number and approval of the new certificate are The validity date remains unchanged, and the renewal date is indicated. 10.4 Enlargement and reduction of certificates When the certification client needs to extend the scope of the certificate to cover the certified product, it shall proceed in accordance with the provisions of Chapter 9.right

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of CNCA CGP-07-2021_English be delivered?

Answer: Upon your order, we will start to translate CNCA CGP-07-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of CNCA CGP-07-2021_English with my colleagues?

Answer: Yes. The purchased PDF of CNCA CGP-07-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version CNCA CGP-07-2021?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version CNCA CGP-07-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information