US$369.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. CJ/T 539-2019: General technical specifications of Tramway signal system Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
CJ/T 539-2019 | English | 369 |
Add to Cart
|
4 days [Need to translate]
|
General technical specifications of Tramway signal system
| Valid |
CJ/T 539-2019
|
PDF similar to CJ/T 539-2019
Basic data Standard ID | CJ/T 539-2019 (CJ/T539-2019) | Description (Translated English) | General technical specifications of Tramway signal system | Sector / Industry | Urban Construction Industry Standard (Recommended) | Classification of Chinese Standard | Q84 | Classification of International Standard | 33.040 | Word Count Estimation | 16,187 | Date of Issue | 2019 | Date of Implementation | 2020-06-01 | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China |
CJ/T 539-2019: General technical specifications of Tramway signal system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General technical specifications of Tramway signal system
ICS 33.040
Q84
The People's Republic of China Urban Construction Industry Standard
General technical requirements for tram signal system
2019-10-28 released
2020-06-01 Implementation
Issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China
Table of contents
Preface Ⅲ
1 Scope 1
2 Normative references 1
3 Terms, definitions and abbreviations 1
4 General requirements 2
5 Performance requirements 3
6 Reliability, availability, maintainability and safety requirements 4
7 System composition 4
8 Functional requirements 6
9 Interfacing with other systems 10
10 Electromagnetic compatibility protection 11
11 Test methods and inspection rules 12
12 Signs, labels and accompanying documents 12
13 Packaging, transportation and storage 13
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the Standard Rating Institute of the Ministry of Housing and Urban-Rural Development.
This standard is under the jurisdiction of the Urban Rail Transit Standardization Technical Committee of the Ministry of Housing and Urban-Rural Development.
The organization responsible for drafting this standard. Tonghao Wanquan Signal Equipment Co., Ltd.
Participated in the drafting of this standard. Beijing Quanlu Communication Signal Research and Design Institute Group Co., Ltd., Shenyang Hunnan Modern Tram
Co., Ltd., Guangzhou Tram Co., Ltd., China Communications Tunnel Bureau Electrification Engineering Co., Ltd., Suzhou Gaoxin Tram Co., Ltd., Zhejiang
Jiangzhonghe Technology Co., Ltd., Shanghai Fuxin Intelligent Traffic Control Co., Ltd., Wuhan Optics Valley Transportation Construction Co., Ltd.
The main drafters of this standard. He Weiting, Li Jingjing, Lin Weiyong, Xu Haidong, Li Xiaogang, Li Zhaoling, Dai Jilong, Guan Jie, Xu Zhiqiang,
Jiang Jiasheng, Lu Qiao, Ren Qiwei, Tang Xiaoxiang, Chen Xianwei, Zhao Dong, Zhou Genhuo, He Mengqi, Wang Yuejun, Li Guolong, Huang Zhengxin.
General technical requirements for tram signal system
1 Scope
This standard specifies the general requirements, performance requirements, reliability, availability, maintainability and safety requirements of the tram signal system.
System composition, functional requirements, interface requirements with other systems, electromagnetic compatibility protection, test methods and inspection rules, signs, labels, accompanying documents,
Packaging, transportation and storage.
This standard applies to tram signal systems.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 12758 General technical conditions for urban rail transit signal system
GB/T 21562 Rail transit reliability, availability, maintainability and safety specifications and examples
GB/T 24338.5 Rail Transit Electromagnetic Compatibility Part 4.Signal and Communication Equipment Emission and Immunity
GB/T 28808 Rail transit communication, signal and processing system control and protection system software
GB/T 28809 Rail Transit Communication, Signal and Processing System Signal Safety Related Electronic System
GB 50174 Data Center Design Specification
GB 50343 Technical Specification for Lightning Protection of Building Electronic Information System
TB/T 3027 Technical conditions for computer interlocking of railway stations
3 Terms, definitions and abbreviations
3.1 Terms and definitions
The following terms and definitions apply to this document.
3.1.1
Tramwaysignalsystem
According to the relative position and status of the tram and the line equipment, the tram operation command, operation control, and road connection can be realized manually or automatically.
A unified and coordinated automatic control system for road traffic signal control.
3.1.2
Dedicatedtrackcircuit
It is suitable for trams and realizes the non-insulation resonant track circuit for section idle or occupancy detection.
3.1.3
Mainlineswitchcontrolsystem
A system used to realize the interlocking control of main line turnouts, signals, and section idle or occupied detection equipment.
3.1.4
Level crossing signal control system levelcrossingsignalcontrolsystem
Connect with the road traffic signal control system to realize the coordinated control of road traffic signals and tram signals at level crossings
system.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CJ/T 539-2019_English be delivered?Answer: Upon your order, we will start to translate CJ/T 539-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of CJ/T 539-2019_English with my colleagues?Answer: Yes. The purchased PDF of CJ/T 539-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|