US$499.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. CJ/T 407-2012: Technicl requirements of communication based automatic train control system for urban rail transit Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
CJ/T 407-2012 | English | 499 |
Add to Cart
|
4 days [Need to translate]
|
Technicl requirements of communication based automatic train control system for urban rail transit
| Valid |
CJ/T 407-2012
|
PDF similar to CJ/T 407-2012
Basic data Standard ID | CJ/T 407-2012 (CJ/T407-2012) | Description (Translated English) | Technicl requirements of communication based automatic train control system for urban rail transit | Sector / Industry | Urban Construction Industry Standard (Recommended) | Classification of Chinese Standard | Q84 | Classification of International Standard | 93.080 | Word Count Estimation | 19,199 | Quoted Standard | GB 9254; GB/T 24338.5; GB/T 20438.6; GB/T 24339.1; GB/T 24339.2; GB 50343; TB/T 3074 | Regulation (derived from) | Bulletin of the Ministry of Housing and Urban 1471; industry standard filing Notice 2012 No. 11 (total 155) | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China | Summary | This standard specifies the urban rail transport communication based train control system of the general requirements, performance requirements, functional requirements, external interface requirements, power, electromagnetic compatibility protection and |
CJ/T 407-2012: Technicl requirements of communication based automatic train control system for urban rail transit ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technicl requirements of communication based automatic train control system for urban rail transit
ICS 93.080
Q84
People's Republic of China urban construction industry standards
Urban rail transit based on the communication of the train
Automatic control system technical requirements
Posted on.2012-09-21
2013-02-01 implementation
Ministry of Housing and Urban-Rural Development, People's Republic of China released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and Definitions, Abbreviations 1
4 General Requirements 2
5 performance requirements 3
6 functional requirements 4
7 external interface requirements 11
8 power supply 12
9 electromagnetic compatibility protection 12
10 environmental conditions 12
Appendix A (informative) system reliability index reference value 13
Appendix B (Normative) system parameter values 14
References 15
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard proposed by the Ministry of Housing and Urban Standard and Design Institute.
This standard by the Ministry of Housing and Urban Urban Rail Transit Standardization Technical Committee.
This standard was drafted. Beijing Jiaotong University, Beijing Rail Transit Construction Management Co., Ltd., Beijing Metro Operations Co., Ltd., on
Shanghai Shentong Rail Transit Research and Consulting Co., Ltd., Guangzhou Metro Corporation, Beijing Urban Construction Design Institute of limited liability company.
The main drafters of this standard. Tang Tao, Hunchun Hai, Niu Yingming, Zhang Yanbing, Zhang Liang, Zhu Xiang, Liang Dongsheng, Yu Zhihong, Huang Youneng, Wang Haifeng.
Urban rail transit based on the communication of the train
Automatic control system technical requirements
1 Scope
This standard specifies the general requirements, performance requirements, functional requirements, external requirements of the city rail transit communication-based train automatic control system
Interface requirements, power supply, electromagnetic compatibility protection and environmental conditions and other technical requirements.
This standard applies to the subway, light rail, monorail, maglev system and automatic guided rail systems.
2 Normative references
The following documents for the application of this document is essential. For dated references, only dated versions apply to this document.
For undated references, the latest edition (including all amendments) applies to this document.
GB 9254 information technology equipment radio disturbance limits and measurement methods
GB/T 24338.5 electromagnetic compatibility of rail transit - Part 4. Transmission and immunity of signal and communication equipment
GB/T 20438.6 Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 6. GB/T 20438.2 and
GB/T 20438.3 application guide
GB/T 24339.1 Railway traffic communication, signaling and processing systems - Part 1. Safety related in closed transmission systems
Communication
GB/T 24339.2 Railway traffic communication, signaling and processing systems - Part 2. Safety related in open transmission systems
Communication
GB 50343 lightning protection technical specifications of building electronic information system
Railway signaling equipment lightning electromagnetic pulse protection technology
3 Terms and Definitions, Abbreviations
The following terms and definitions, abbreviations apply to this document.
3.1 Terms and definitions
3.1.1
Communication based train control communicationbasedtraincontrol
Adopting the technology of locomotive active locating technology and continuous vehicle-to-ground bidirectional data communication technology, which does not rely on the trackside occupancy detection equipment,
The implementation of safety features of the vehicle and the ground processor and continuous train automatic control system.
3.1.2
Automatic train control automatictraincontrol
Urban Rail Transit Signal System Realizes Automatic Train Monitoring ATS, Automatic Train Protection ATP, Automatic Train ATO and Calculation
Machine interlocking CI technology in general.
3.1.3
Automatic train automatic monitoring
Automatic command and control of traffic control, train operation monitoring and management technology in general.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CJ/T 407-2012_English be delivered?Answer: Upon your order, we will start to translate CJ/T 407-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of CJ/T 407-2012_English with my colleagues?Answer: Yes. The purchased PDF of CJ/T 407-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|