GB 50387-2006 (GB/T 50387-2017 Newer Version) PDF English
GB 50387-2006 (GB50387-2006) PDF English
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Name of Chinese Standard | Status |
GB/T 50387-2017 | English | 1319 |
Add to Cart
|
8 days
|
Code for engineering installation acceptance of metallurgical machinery hydromatic, lubricating and pneumatic system equipment
| Valid |
GB 50387-2006 | English | 85 |
Add to Cart
|
0-9 seconds. Auto-delivery.
|
Code for installation acceptance of metal mechanical hydromatic, lubricating and air-driven system equipment
| Obsolete |
Newer version: GB/T 50387-2017 Standards related to (historical): GB/T 50387-2017
PDF Preview
GB 50387-2006: PDF in English GB 50387-2006
GB
UDC
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
P GB 50387-2006
Code for installation acceptance of metal mechanical
hydromatic, lubricating and air-driven system equipment
ISSUED ON. SEPTEMBER 6, 2006
IMPLEMENTED ON. APRIL 1, 2007
Issued by. Ministry of Construction of the People's Republic of China;
General Administration of Quality Supervision, Inspection
and Quarantine of the People's Republic of China.
National Standard of the People's Republic of China
Code for installation acceptance of metal mechanical
hydromatic, lubricating and air-driven system equipment
Main drafting organization.
China Metallurgical Construction Association
Approval organization.
The Ministry of Construction of the People's Republic of China
Implementation Date.
April 1, 2007
China Planning Press
2007 Beijing
Foreword
According to the relevant requirements of Document JIANBIAO [2005] No.124
issued by the Ministry of Construction - “Notice on Printing and Distributing ‘the
Development and Revision Plan (the second batch) of National Engineering
Construction Standards and Codes in 2005’”, this code was formulated, in
combination with the characteristics of metallurgical construction, by China First
Metallurgical Construction Co., Ltd. jointly with the organizations concerned, under
the organization of China Metallurgical Construction Association.
In the process of formulating this code, the code drafting group learnt the relevant
current national laws, regulations and standards, conducted investigations and
studies, summarized the experience in the construction quality acceptance of
hydromatic, lubricating and air-driven system equipment in metal mechanical
equipment installation engineering over the years, discussed and revised the
provisions in the code repeatedly, solicited the opinions from related organizations
and experts, and finalized this code through review.
This code consists of eight chapters, covering General Provisions; Basic
Requirements; Equipment Foundation, Anchor Bolt and Bearing Plate; Equipment
and Materials in Site; Equipment Installation; Fabrication and Installation of Pipeline;
Pipeline Flushing, Purging and Pressure Test; and Commissioning and Test-run, as
well as six appendixes. The unit project in installation of hydromatic, lubricating and
air-driven system equipment totally comprises seven sub-section projects and
corresponding sub-item projects.
The provisions printed in bold type in this code are mandatory ones and must be
implemented strictly.
This code is under the jurisdiction of, and its mandatory provisions are interpreted
by the Ministry of Construction. China First Metallurgical Construction Co., Ltd. is in
charge of the explanation of specific technical specifications
In order to improve the quality of this code, all relevant organizations are kindly
invited to summarize and accumulate actual experiences when implementing this
code. Relevant comments and recommendations, whenever necessary, should be fed
back to China First Metallurgical Construction Co., Ltd. (Address. No.3, Gongye
Avenue, Qingshan District, Wuhan City, 430081, China; E-mail. jisc@cfmcc.com or
xiaolw@cfmcc.com) for amendment in future revision.
The chief drafting organization, co-drafting organization and chief drafters of this
code are.
Chief Formulation Organization. China First Metallurgical Construction Co.,
Ltd.
Co-formulation Organization. Shanghai Baoye Group Construction Co., Ltd.
Chief Drafters. Zhuo Guangyu, Xu Zuwen, Li Mingzhu, Wang Shiqing, Wu
Gangping, Liu Shiyin, Song Zhanjiang, Liu Zhiyuan, Liu Guangqiu, Luo Jin and Zou
Yichang.
Table of Contents
1 General Provisions ... 7
2 Basic Requirements ... 8
3 Equipment Foundation, Anchor Bolt and Bearing Plate ... 12
3.1 General Requirements ... 12
3.2 Equipment Foundation ... 12
3.3 Anchor Bolt ... 12
3.4 Bearing Plate... 13
4 Equipment and Materials in Site ... 14
4.1 General Requirements ... 14
4.2 Equipment ... 14
4.3 Raw Materials ... 14
5 Installation of Equipment ... 15
5.1 General Requirements ... 15
5.2 Installation of Oil Tank ... 15
5.3 Installation of Cooler and Steam Heater ... 15
5.4 Installation of Filter ... 16
5.5 Installation of Energy Accumulator ... 16
5.6 Installation of Pump ... 16
5.7 Installation of Complete Set of Hydraulic (Lubrication) Station ... 17
5.8 Installation of Brackets for Hydraulic (Air) Valve and Control Valve ... 17
5.9 Installation of Oil Purifier ... 18
5.10 Installation of Oil Feeder and Distributor ... 18
5.11 Installation of Water-separating Gas Filter, Atomized (Oil Gas) Lubricator
and Control Valve ... 18
6 Fabrication and Installation of Pipeline ... 19
6.1 General Requirements ... 19
6.2 Pipeline Welding ... 19
6.3 Pipeline Pickling ... 20
6.4 Pipeline Fabrication ... 20
6.5 Pipeline Installation ... 21
7 Pipeline Flushing, Purging and Pressure Test ... 24
7.1 General Requirements ... 24
7.2 Pipeline Flushing ... 24
7.3 Pipeline Purging ... 25
7.4 Pressure Test for Hydromatic and Lubricant Pipeline Systems ... 25
7.5 Pressure Test for Grease Pipeline System ... 25
7.6 Pressure Test for Air-driven Pipeline System ... 26
8.1 General Requirements ... 27
8.2 Commissioning and Test-run of Hydromatic Equipment ... 27
8.3 Commissioning and Test-run of Lubricant Equipment ... 28
8.4 Commissioning and Test-run of Grease Equipment ... 29
8.5 Commissioning and Test-run of Oil Fog Lubricating Equipment ... 29
8.6 Commissioning and Test-run of Technological Lubricating Equipment ... 30
8.7 Commissioning and Test-run of Air-driven System Equipment ... 31
Appendix A Quality Acceptance Records of Sub-item Projects in Installation of
Metal Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 32
Appendix B Quality Acceptance Records of Sub-section Projects in Installation of
Metal Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 33
Appendix C Quality Acceptance Records of Unit Projects in Installation of Metal
Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 34
Appendix D Commissioning and Test-run Records for Metal Mechanical
Hydromatic, Lubricating and Air-driven System Equipment ... 37
Appendix E No-load Linkage Test-run Records for Metal Mechanical Hydromatic,
Lubricating and Air-driven System Equipment ... 38
Appendix F Coding of hydramatic transmission, oil solid particle contamination
level (Excerpted from National Standard GB/T 14039-2002) ...
...... Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.
|