HOME   Cart(12)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

LY/T 2754-2016 English PDF

US$149.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
LY/T 2754-2016: Technical regulations of hardwood cuttage propagation on figs(Ficus carica L.)
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
LY/T 2754-2016English149 Add to Cart 3 days [Need to translate] Technical regulations of hardwood cuttage propagation on figs(Ficus carica L.) Valid LY/T 2754-2016

PDF similar to LY/T 2754-2016


Standard similar to LY/T 2754-2016

LY/T 2407   GB/T 30762   LY/T 1650   LY/T 2752   LY/T 2756   LY/T 2748   

Basic data

Standard ID LY/T 2754-2016 (LY/T2754-2016)
Description (Translated English) Technical regulations of hardwood cuttage propagation on figs(Ficus carica L.)
Sector / Industry Forestry Industry Standard (Recommended)
Classification of Chinese Standard B61
Word Count Estimation 5,598
Date of Issue 2016-10-19
Date of Implementation 2017-01-01
Regulation (derived from) State Forestry Administration Announcement No 2016 No.19
Issuing agency(ies) State Forestry Administration

LY/T 2754-2016: Technical regulations of hardwood cuttage propagation on figs(Ficus carica L.)

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Technical specification for hard branch cutting of fig) ICS 65.020.20 B61 People's Republic of China Forestry Industry Standard Technical instructions for fig hardwood cutting Released on October 18,.2016 2017-01-01 implementation State Forestry Administration released

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the Shandong Provincial Forestry Department. This standard is under the jurisdiction of the National Economic Forest Standards Committee. This standard was drafted. Shandong Forestry Science Research Institute, Shandong Economic Forest Management Station. The main drafters of this standard. Sun Lei, Qu Yongzhen, Jia Ming, Tan Shuling, Zhao Dengchao, Meng Xiaoyu, Liu Binghua, Shu Xiuge, Liang Jing, Yang Qingshan. Technical instructions for fig hardwood cutting

1 Scope

This standard specifies the technical content of fig (Ficuscarica L.) cutting seedlings, post-cutting management, seedling emergence and so on. This standard applies to the breeding of fig varieties seedlings.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 5084-2005 Farmland irrigation water quality standard GB 6000 Main afforestation tree seedling quality grading GB 15618 Soil Environmental Quality Standard GB 18877-2009 Organic-inorganic compound fertilizer LY/T 2290 forest seedling label

3 cutting seedlings

3.1 Variety selection Choose the best varieties that have been cultivated, such as 'green skin', 'Branrick', 'Boh Jihong', 'Jin Aifen', 'Jin Zao', 'Ma Si Yi Tao Fen' and so on. 3.2 Spike collection and storage In the northern region, in the middle and late November of each year, when the fig tree leaves are deciduous, the seed tissue is fully developed, and when the leaf nutrient has returned, the base is selected. A robust 1-year-old shoot with a thickness of 1cm~2.5cm, cut from the base, remove dead leaves and undeveloped young fruit, bundled into bundles, choose Clean and moist river sand, digging sand and ditch, and carrying sand. If the amount of inserts is large, refer to 5.5. The location of the sand storage site should be high and dry, sheltering from the wind. No water. In the southern region, where the annual branches are not frozen, the branches can be cut before the spring germination. 3.3 Selection Daejeon nursery should be out of the seedbed and cut into seedlings on the seedbed. The nursery should choose a good texture, loose and fertile, and good water and drainage. Sandy soil, pH 6.5~7.5, salt content less than 0.2%, organic matter >10g/kg, total nitrogen >0.8g/kg, effective phosphorus >5mg/kg, The effective potassium is >80mg/kg, and the thickness of the soil layer is more than 50cm, which meets the requirements of GB 15618. 3.4 Seedbed preparation and treatment After the spring soil is thawed, apply appropriate amount of organic fertilizer or compound fertilizer, deep ploughing and simmering, and simmering in the ground. The width of the raft is 1.2m~1.5m, and the height is 15cm~ 25cm, it is advisable to evenly water the soil with 80% carbendazim WP 1000 times solution, and cover the black mulch after pouring water. 3.5 Insert preparation and processing Before the end of March, at the end of March, the cuttings are taken out from the river sand, and cut into 15cm~20cm according to the principle of taking along with the cutting.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of LY/T 2754-2016_English be delivered?

Answer: Upon your order, we will start to translate LY/T 2754-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of LY/T 2754-2016_English with my colleagues?

Answer: Yes. The purchased PDF of LY/T 2754-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.