US$689.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 21744-2008: Ration of workers for manufacturing large rail traffic engineering equipment Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 21744-2008 | English | 689 |
Add to Cart
|
5 days [Need to translate]
|
Ration of workers for manufacturing large rail traffic engineering equipment
| Valid |
GB/T 21744-2008
|
PDF similar to GB/T 21744-2008
Standard similar to GB/T 21744-2008 GB 146.2 TB/T 2489 GB/T 21562.3 GB/T 21745
Basic data | Standard ID | GB/T 21744-2008 (GB/T21744-2008) | | Description (Translated English) | Ration of workers for manufacturing large rail traffic engineering equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | S02 | | Classification of International Standard | 03.100.30 | | Word Count Estimation | 30,326 | | Date of Issue | 2008-05-05 | | Date of Implementation | 2008-07-01 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard provides rail transportation equipment manufacturing engineering major fixed working hours, equipped with the appropriate personnel and job content in accordance with professional technical level. This standard applies to rail transportation equipment manufacturing engineering work in large-scale labor management. |
GB/T 21744-2008: Ration of workers for manufacturing large rail traffic engineering equipment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Ration of workers for manufacturing large rail traffic engineering equipments
ICS 03.100.30
S02
National Standards of People's Republic of China
Rail traffic engineering of large equipment
Integrated Manufacturing labor quota
Posted 2008-05-05
2008-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 rail transportation equipment manufacturing large-scale integrated engineering labor quota 1
2.1 rail laying machine manufacturing 1
2.2 Track crane manufacturer 4
2.3 Track bridging machine manufacturing 7
2.4 10 rail car manufacturing
Appendix A (normative) the relevant provisions of 19
Foreword
Rail Transit Project Work Quota series of standards from the "Urban Rail Transit light rail project Work Quota", "Urban Rail Transit to
Under Railway Engineering Work Quota "," Urban Rail Transit Project Work Quota communication signal "," Urban Rail Transit Traction Power Supply Project
Work Quota "," large-scale rail transportation equipment manufacturing integrated engineering labor quota "," rail transit engineering components manufacturing Work Quota "
And other standard components. "Rail transportation equipment manufacturing large-scale integrated engineering labor quota" is the rail transit project Work Quota series of standards
one.
Appendix A of this standard is a normative appendix.
This standard was proposed by the Ministry of Labor and Social Security.
This standard by the National Standardization Technical Committee on Labor and personnel quotas.
This standard by the National Standardization Technical Committee work and personnel quotas railway engineering work and personnel quotas technical committee responsible for the interpretation.
This standard was drafted. China Railway Group Limited.
The main drafters of this standard. Pangde Jing, Wang Shucheng, Zhou Xuemin, Zhang Weibin, Qi Bao, Liu Jun, Chi Peng, summer peace.
Introduction
The development of standards for the construction and production guide and regulate rail traffic engineering, strengthen labor administration and enterprises to rationally allocate labor system
Plans to provide the main basis for a given job; while budgetary estimate quota Jixietaiban quotas and other economic and financial fixed labor costs for the rail transit project
Management standard.
This standard is in accordance with "advanced, rational, scientific, standardized" principle and rail traffic engineering of large equipment manufacturing processing steps, each step outlined
(Post) content of the work, practices; the provisions of the respective steps (positions) of the labor quota, configured in accordance with professional grade technical personnel, machinery
(Equipment) and standard conditions adjustment factor.
Rail traffic engineering of large equipment
Integrated Manufacturing labor quota
1 Scope
This standard specifies the rail transportation of large engineering equipment manufacturing time quota, in line with the appropriate level of professional and technical personnel and
content.
This standard applies to rail transportation equipment manufacturing engineering large-scale work in labor management.
2 rail transportation equipment manufacturing large-scale integrated engineering labor quota
2.1 rail laying machine manufacturing
2.1.1 The arm and arm mount machine
a) Work. using the appropriate equipment workpiece casting, heat treatment, cutting, scribing, turning, boring, milling, grinding, planing, drilling
Hole, gear system, slotting, assembly, welding and mechanical assembly.
b) man-days fixed in Table 1.
c) According to the above steps to configure the appropriate level of compliance with professional and technical staff of 86 people.
Table 1 machine arm and the machine arm mount units each ten-days
Project thermal processing cutting scribe Turning milling drilling planing prepared tooth assembly welding installation of an integrated
Fixed 10.4 15.0 1.18 9.71 10.2 1.80 11.3 1.03 28.0 4.68 28.0 121.3
2.1.2 cab
a) Work. using the appropriate equipment workpiece casting, heat treatment, cutting, scribing, turning, boring, milling, grinding, drilling, group
Equipment, welding and mechanical assembly.
b) man-days fixed in Table 2.
c) According to the above steps to configure the appropriate level of compliance with professional and technical staff of 35 people.
Table 2 cab units of man-days per
Project thermal processing cutting scribe Turning milling drilling assembly welding installation of an integrated
Fixed 2.00 16.0 3.25 20.0 6.38 40.0 6.38 24.0 3.63 121.64
2.1.3 Column
a) Work. using the appropriate equipment workpiece casting, heat treatment, cutting, scribing, turning, boring, milling, grinding, planing, drilling
Hole, gear system, slotting, assembly, welding and mechanical assembly.
b) man-days fixed in Table 3.
c) According to the above steps to configure the appropriate level of compliance with professional and technical staff of 76 people.
Table 3 man-days per unit of column
Project thermal processing cutting scribe Turning milling drilling planing prepared tooth assembly welding installation of an integrated
Fixed 18.1 40.5 8.25 19.5 3.75 118 60.1 2.38 254 214 77.6 816.18
2.1.4 drag winch and installation
a) Work. using the appropriate equipment workpiece casting, heat treatment, cutting, scribing, turning, boring, milling, grinding, planing, drilling
Hole assembly, welding and mechanical assembly.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 21744-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 21744-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 21744-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 21744-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|