HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189760 (5 Oct 2024)

GB/T 21562.3-2015 PDF in English


GB/T 21562.3-2015 (GB/T21562.3-2015, GBT 21562.3-2015, GBT21562.3-2015)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 21562.3-2015English155 Add to Cart 0-9 seconds. Auto-delivery. Railway applications -- Specification and demonstration of reliability, availability, maintainability and safety (RAMS) -- Part 3: Guide to the application for rolling stock RAM Valid
Standards related to (historical): GB/T 21562.3-2015
PDF Preview

GB/T 21562.3-2015: PDF in English (GBT 21562.3-2015)

GB/T 21562.3-2015 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 45.060 S 04 Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 3. Guide to the application for rolling stock RAM (IEC/TR 62278-3.2010, Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 3. Guide to the application of IEC 62278 for rolling stock RAM, MOD) ISSUED ON. DECEMBER 31, 2015 IMPLEMENTED ON. JULY 1, 2016 Issued by. General Administration of Quality Supervision, Inspection and Quarantine of the PRC; Standardization Administration of the PRC. Table of Contents Foreword ... 3  Introduction ... 5  1 Scope ... 6  2 Terms and definitions ... 7  3 Approach ... 7  3.1 General ... 7  3.2 Entities involved in the life cycle phases of rolling stock ... 7  4 Application ... 8  4.1 Object of the application ... 8  4.2 Application of GB/T 21562-2008 ... 8  5 SPECIFY RAM requirements ... 10  5.1 Introductory remarks ... 10  5.2 Preliminary RAM analysis ... 10  5.3 RAM requirements ... 19  5.4 Process for choosing RAM figures ... 29  5.5 RAM program ... 29  6 RAM assurance during life cycle ... 44  6.1 General ... 44  6.2 Tender phase ... 46  6.3 Design phase ... 47  6.4 Demonstration phase ... 50  7 RAM parameters of LCC model ... 54  7.1 General ... 54  7.2 Overview of LCC modelling ... 55  7.3 RAM parameters for LCC model ... 56  Appendix A (Informative) Breakdown structure (examples) ... 58  References ... 83  Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 3. Guide to the application for rolling stock RAM 1 Scope This Part of GB/T 21562 provides guidance on applying the RAM requirements in GB/T 21562-2008 to rolling stock during the system life cycle phases from invitation to tender to demonstration in operation. The Part is aimed at the customers/operators and main suppliers of rolling stock (including D-series high-speed train). It mainly specifies the following contents. - Tasks which the customer/operator of rolling stock is responsible for.  SPECIFY the RAM requirements, ADDRESS the type of operation in terms of the end customer needs, service availability, and economic considerations;  EVALUATE different tenders, in terms of RAM requirements, on a common basis with the aid of specific RAM documents;  CONFIRM whether, during design/development phase, the rolling stock satisfies the RAM requirements by examining step by step detailed and specific RAM documents as an output of the RAM activities performed; VALIDATE that the rolling stock, as delivered, satisfies the specified RAM requirements. - Tasks which the main supplier of rolling stock is responsible for.  UNDERSTAND the customers/operators’ RAM requirements;  PROVIDE substantive performance in a tender to show that the product offered is likely to satisfy the RAM requirements by performing preliminary RAM analysis;  PROVIDE substantive performance during design/development phase to show that the product offered is likely to satisfy the RAM requirements by performing detailed RAM analysis;  DEMONSTRATE that the product delivered satisfies the RAM requirements. Regarding LCC model, this Part specifies only the required key RAM parameters. This Part excludes the following contents. - RAM values connected to the different RAM requirements (However, 5.4 provides a simple guideline of actions for more in-depth decision making and selection of appropriate values); - Specific RAM documents and activities (However, this Part provides, only as an example, typical data and document templates for recording the output of a RAM analysis). 2 Terms and definitions The following terms and definitions are applicable to this document. 2.1 Part number The alphanumeric code, generally assigned by the main supplier, to represent a family of products with the same characteristics of form, fit, and function. 3 Approach 3.1 General To determine the requirements of GB/T 21562-2008 and the basic conditions for these requirements, for each phase of the life cycle, the following questions shall be addressed. - WHAT. What activities/tasks are to be performed and the supporting documents to be produced? - WHO. Who has the responsibility for these activities/tasks? - HOW. Which type of method or tool shall be used? This process is adopted for the development of the Part and shall be applied in accordance with the structure of the application. 3.2 Entities involved in the life cycle phases of rolling stock Depending on the organizational and management structure of the railway system concerned, a number of entities, performing different functions, may be involved within the life cycle phases of rolling stock. The entities in the contract e) ESTABLISH and IMPLEMENT an adequate and effective configuration management system including, at least. 1) All system documentation; 2) All other system deliverables. Both the customer and the main supplier shall provide evidence by documents about the fulfilment of the above mandatory requirements, within their responsibility. The RAM program shall include these documents. 5 SPECIFY RAM requirements 5.1 Introductory remarks The purpose of this chapter is to establish the process to define RAM requirements for rolling stock and for the subsystems, assemblies, and parts (distinguished by their boundary limits) belonging to the rolling stock. This chapter gives detailed information on the requirements of phases 1, 2, 4, and 5 of system life cycle described in 6.1, 6.2, 6.4, and 6.5 of GB/T 21562- 2008. The system definition process shall first collect all available data and relevant information about the rolling stock under consideration. The final goal is the derivation of RAM targets through the appropriate analysis of all the information collected and organized in a structured way. 5.2 Preliminary RAM analysis 5.2.1 General This clause complements 6.1.3.4, 6.2.3.1, 6.2.3.2, 6.4.3.1, and A.2 of GB/T 21562-2008 and gives further details. The preliminary RAM analysis shall identify the application environment and the operating conditions of the rolling stock, to recognize the fundamental concepts based on the overall RAM requirements. The analysis includes. - Similar system review. CREAT a list of similar existing rolling stock, and EXTRACT suitable RAM-related information; - Preliminary system analysis. All available and relevant rolling stock documentation is reviewed in order to define, at a preliminary level, the maintenance conditions (including logistic support). Items contained in each of these are listed below. a) Mission profile. 1) Reference route; 2) Commercial operating speed (operating distance/operating time); 3) Mean distance of a run; 4) Mean distance between two train stops; 5) Operating time or distance per year; 6) Revenue of operating time or distance per year; 7) Stand-by time per day; 8) Idle time per day (i.e. time when the rolling stock is neither in operation nor stand-by); 9) Planned total time of use (life expectancy in years). b) Route profile. 1) Number of tunnels related to reference route; 2) Number of viaducts related to reference route; 3) Cumulative distance in tunnels; 4) Cumulative distance on surface, including viaducts; 5) Gradients and curves of the route and related lengths. c) Operating conditions. 1) Equivalent speed related to the time the equipment is powered during a given calendar period (cumulated distance/time the equipment is powered over the period); 2) Time an equipment is powered over a given calendar period (This parameter can be defined for each equipment, but is generally defined for categories of equipment); 3) Time during which traction is activated; 4) Time or percentage of time during which electric braking is activated; e) Maintenance conditions. 1) DEVELOP a maintenance plan (including minimum preventive maintenance interval, maximum contemporary number of personnel required for maintenance interval tasks, maximum standstill time to complete maintenance interval tasks, etc.); 2) Number, location, and description of the sites for maintenance; 3) Description of the standard equipment, tools, and resources at the maintenance sites. 5.2.2.3 Breakdown structure and boundary limits 5.2.2.3.1 General Breakdown structure of the rolling stock is the most important baseline of the identification process. Establishing a breakdown structure of the rolling stock, gives a clear reference outline for all the activities and analyses, and supports RAM program through the life cycle. Generally, the operating scope of the breakdown structure is to set up the borders of a system. By using an appropriate breakdown level for the system, LIST all the subsystems belonging to the rolling stock; and DRAW out the relationships existing between the different subsystems of the rolling stock. RAM analyses can use the two methods. - Functional breakdown; - Physical breakdown. The functional breakdown is often used to perform preliminary criticality analyses. The last functional level allows consequences of functional failure modes to be developed and the next physical level allows the critical subsystem list to be developed. The physical breakdown is used to perform maintainability analyses. The last level of this breakdown is the line replaceable unit (LRU), as defined in 5.5.4.4. This breakdown is sometimes called the logistic breakdown structure. 5.2.2.3.2 Common rules to set up a physical breakdown structure The decomposition process of the breakdown structure shall be divided into different levels step by step. All the subsystems and their functional relationships shall be determined. The decomposition process is based on a hierarchical breakdown in a top down specification might be applied. 5.3 RAM requirements 5.3.1 General This clause complements 4.5.2.2 and 6.4.3.2 of GB/T 21562-2008 and gives further details. This clause gives the most commonly used RAM requirements, guides the customer to choose the most appropriate requirements for his rolling stock, and also considers the legal requirements which may arise from regulations (if any). In choosing the appropriate RAM requirements, the customer shall give priority to the following items. - System characteristics (mission profile, operating condition, and function requirements, etc.); - Economic implications; - Practicalities (being able to measure RAM performance according to the field operations, depending on the organizational and logistical structure, and service procedures). The customer shall document his process for choosing RAM requirements stating the factors considered for the selected RAM requirements and giving a description of each selected requirement. 5.3.2 Reliability targets This clause provides guidance on the reliability target requirements (MTBF, failure rate per million hours, or failure rate per million kilometers) of significant (immobilizing) failure, major (service) failure, and minor failure. The reliability targets are applicable to the total rolling stock and all its subsystems, assemblies, and parts defined according to the boundary limits. For each failure category, the customer shall specify the following reliability targets. - Maximum accepted failure rate; - Minimum accepted MTBF/MTTF/MDBF. The terms “hours/kilometers” represent hours/kilometers of service. MTBF is intended for repairable units. MTTF is intended for non-repairable units. Examples of logistical and administrative delays are as follows. - Waiting time in the depot; - Waiting time for spare parts; - Time to prepare maintenance actions; - Time to shunt rolling stock. 5.4 Process for choosing RAM figures This clause complements 4.5.2.2 and 6.4.3.2 of GB/T 21562-2008 and gives further details. The aim of this clause is to provide simple guidance to help customers choose appropriate figures for RAM requirements. Considering the deliverables of the previous clauses, the customer shall complete the following tasks. a) ANALYZE rolling stock system identification and its breakdown structure; b) CONSIDER functional requirements involved and the related subsystems; c) DERIVE RAM requirements by analyzing the failure conditions of each functional requirement; d) CONSIDER RAM requirements of similar rolling stock; e) REVIEW past RAM performances achieved; f) CONSIDER technical evolution of the rolling stock under consideration; g) EVALUATE the impact of new functionalities requested; h) CONSIDER a realistic improvement of RAM requirements; i) CONSIDER other specific and documented needs. The above actions would enable the customer to make better choices with substantial supporting documentation. The customer shall document his process for choosing RAM figures stating how to choose each figure. 5.5 RAM program 5.5.1 General  Failure data collection from field; 5.4 Follow up of RAM critical products. 6. RAM deliverable documents and schedule 6.1 List of RAM deliverable documents; 6.2 Schedule for RAM analyses; 6.3 Periodical RAM activities report. The RAM program establishes all the program management tasks, including timing and implementation details of the program activities and documentation to accomplish the RAM program requirements. The RAM program includes declarations for the procedures, tools and time schedule foreseen for implementing the RAM program. The main supplier shall be responsible for establishing the RAM program, specifying the RAM program, for the contents of the documents submitted to the customer, and for reaching consensus through consultation with the customer on the acceptance timescale of the system quality plan. 5.5.4 Example of RAM analyses document template and data 5.5.4.1 General This clause provides an overview of RAM analyses document templates and data, to guide the user to handle the issues related to the RAM program. The following are examples of templates for the most common RAM documentation and analyses provided by the main supplier, to give substantive information/visual information of the RAM activities carried out and to show that the rolling stock satisfies the RAM requirements in each phase of the life cycle from the tender to the operation phase. A list of tools suitable for the different analyses and the management of all RAM activities is given in B.5 of GB/T 21562-2008. 5.5.4.2 Common data for the analyses A set of data for the identification of the object being analyzed. The types of the data are generally common through the different analyses and levels of the breakdown structure. They represent the header data set of the analysis. To simplify the understanding, a 3-level breakdown structure has been given in these examples, and the third level is the LRU level. maintenance actions. The depot may minimize standstill time for the rolling stock and complete maintenance within the lowest possible time, to release it, ready for service. For complex maintenance actions, if adequate trained personnel, resources, minimum set of spare parts, tools and equipment available within the depot cannot be provided, the maintenance actions shall be carried out elsewhere, e.g. within a specialized depot/workshop. In this case, the rolling stock shall be out of service. The first situation is referred to as “in-service maintenance” and the second one as “out-of-service maintenance”. Considering the above situations and RAM requirements, there are 2 possibilities for preventive maintenance. a) In-service maintenance, to address the target of minimizing standstill time, two choices can be considered for maintenance.  All the maintenance actions are carried out in the depot;  Only removing/installing of products (replacing a product with a spare) is carried out in the depot. Other maintenance actions are carried out on the removed products in a specialized depot/workshop. b) Out-of-service maintenance, all the maintenance actions are carried out only in a specialized depot/workshop. For these situations, the maintenance levels of preventive maintenance analysis templates and data sheets are described as follows. - InS-PM (in-service preventive maintenance); - OutS-PM (out-of-service preventive maintenance). Besides the resources of the depot (personnel, tools, equipment, etc.), corrective maintenance shall also consider the impact of failure mode (divided into repairable failure mode or not repairable failure mode) on the RAM requirements. a) In-service maintenance. The choice shall be made based on the principle of minimizing standstill time.  Repairable failure mode. All maintenance actions for the repair are carried out in the depot;  Not repairable failure mode. Only removing/installing products is itself, its normal operation, or the supplier staff. Therefore, the customer shall define, before the beginning of the checking period and of each RAM requirement, detailed acceptance criteria to establish clear rules to be followed. 6.4.3 In service checking period The customer is responsible for defining an appropriate duration for the checking period. For defining a checking period, the customer shall consider that usually RAM targets may not be achieved in the first period of checking operation but after a burn-in period, during which a reliability growth monitoring process shall have been implemented. Generally, the steady level is achieved at least after two years of revenue service. Reliability growth monitoring process is a continuous monitoring of the field data, RAM analysis and matching of the results against the targets for contractual requirements. Additional requirements may be agreed between customer and supplier. Where results from field data fall short of contractual requirements, the main supplier shall undertake corrective actions. When choosing the checking period, it shall meet the following requirements. - Within the reliability growth process, the corrective actions shall be managed as described in 5.5, with a corrective action plan, as appropriate; - Before start of the RAM checking period, reliability growth process shall be concluded; - In order to manage a coherent field data collection, the rolling stock configuration status shall have been stable. If necessary technical modifications are carried out, the supplier shall precisely quantify the consequences of modified configuration (e.g. software update); - In choosing the checking period, the following shall be taken into account.  Number of rolling stock in the fleet and the cumulative annual distance of service;  Maintenance plan of the rolling stock;  RAM requirements chosen by the customer; 3-3. 7.3 RAM parameters for LCC model Starting from reliability parameters, the “conditions” of Table 5 and Table 6 directly affect the parameters of LCC model. Also, failure rate or MTBF/MTTF/MDBF (SEE Table 8) has an impact on LCC, which can be considered in the maintenance cost. Maintenance cost is one of the most significant costs of the whole LCC. For corrective or preventive maintenance, maintenance cost is time-dependent variable. Corrective maintenance cost of older rolling stocks is larger than that of new ones which have overcome the early failure period. The proportion spent on preventive maintenance peaks in years when expensive actions are carried out (i.e., major inspections, replacement of expensive parts, refurbishing, and overhaul, etc.). When preventive maintenance costs are evaluated, consideration shall be given to that, throughout the service life, these actions are only carried out 2 times~5 times. The maintenance costs from different operators or from different main suppliers of rolling stock shall be compared on the same equal basis. Regarding corrective and preventive maintenance costs, Figure 2~Figure 4 give relevant elements for building costs of products. Parameters to be considered include. - Spare parts costs (new or reconditioned); - Working time per maintenance activity (man-hour); - Man-hour cost; - Maintenance interval (for each action in preventive maintenance) within maintenance plan during its lifetime; - Quantities within the rolling stock breakdown structure; - Reliability of the product maintained (failure rate or MTBF/MTTF/MDBF). Availability parameters, because affected by the factors which cause rolling stock to be unable to put into operation, are difficult to determine. The immediate costs generated by the unavailability of the rolling stock may ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.