|
US$1219.00 · In stock Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 21745-2008: Ration of workers for manufacturing rail traffic engineering components Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 21745-2008 | English | 1219 |
Add to Cart
|
8 days [Need to translate]
|
Ration of workers for manufacturing rail traffic engineering components
| Valid |
GB/T 21745-2008
|
PDF similar to GB/T 21745-2008
Standard similar to GB/T 21745-2008 GB 146.2 TB/T 2489 GB/T 21562.3 GB/T 21744
Basic data | Standard ID | GB/T 21745-2008 (GB/T21745-2008) | | Description (Translated English) | Ration of workers for manufacturing rail traffic engineering components | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | S02 | | Classification of International Standard | 03.100.30 | | Word Count Estimation | 55,585 | | Date of Issue | 2008-05-05 | | Date of Implementation | 2008-07-01 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the various rail traffic engineering steel bridges, processing, manufacturing, installation, straddle-type steel bearings, straddle-type joint turnout, various turnout processing, -speed maglev track beam functions, low-speed maglev rail labor quota row of manufacture, capacity and job content. This standard applies to all kinds of steel rail transit project, turnout product manufacturing and other projects in the labor management. |
GB/T 21745-2008: Ration of workers for manufacturing rail traffic engineering components---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Ration of workers for manufacturing rail traffic engineering components
ICS 03.100.30
S02
National Standards of People's Republic of China
Rail engineering components manufacturing Work Quota
Posted 2008-05-05
2008-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
Introduction Ⅱ
1 Scope 1
2 rail traffic engineering component manufacturing Work Quota 1
2.1 parts processing component product 1
2.2 component manufacturing, installation 13
3 Rail Transit Project straddle Pedestal 26
3.1 component manufacturing 26
3.2 Steel Manufacturing 27
4 Light Rail Transit Project straddle Joint Turnouts 29
4.1 component manufacturing 29
4.2 Machining 31
4.3 Turnout assembly 32
4.4 installation site 32
5 Rail Transit Project Turnout manufacture 33
5.1 parts processing rail 33
5.2 Frog high manganese steel manufacturing, processing 40
5.3 Turnout coupling of processing 41
6-speed maglev rail project features 44 beam
6.1 component manufacturing 44
6.2 overall machining 46
6.3 Painting 46
6.4 track beam machining 46
7 Rail Transit Project low speed maglev track panel 47
7.1 component manufacturing 47
7.2 Machining 48
7.3 overall assembly, painting, engraving mark 48
7.4 installation site 49
Appendix A (normative) the relevant provisions of 50
Foreword
Rail Transit Project Work Quota series of standards from the "Urban Rail Transit light rail project Work Quota", "Urban Rail Transit to
Under Railway Engineering Work Quota "," Urban Rail Transit Project Work Quota communication signal "," Urban Rail Transit Traction Power Supply Project
Work Quota "," large-scale rail transportation equipment manufacturing integrated engineering labor quota "," rail transit engineering components manufacturing Work Quota "
And other standard components. "Rail traffic engineering component manufacturing Work Quota" is one of Work Quota series standard rail transit project.
Appendix A of this standard is a normative appendix.
This standard was proposed by the Ministry of Labor and Social Security.
This standard by the National Standardization Technical Committee on Labor and personnel quotas.
This standard by the National Standardization Technical Committee work and personnel quotas railway engineering work and personnel quotas technical committee responsible for the interpretation.
This standard was drafted. China Railway Group Limited.
The main drafters of this standard. Pangde Jing, Wang Shucheng, Yanfeng Xi, full Xiang Fan, Liu, on behalf of the good order, Zhou Xuemin, Zhang Shaotong, Xu Xiuwen,
Summer peace.
Introduction
The development of standards for the construction and production guide and regulate rail traffic engineering, strengthen labor administration and enterprises to rationally allocate labor system
Plans to provide the main basis for a given job; while budgetary estimate quota Jixietaiban quotas and other economic and financial fixed labor costs for the rail transit project
Management standard.
This standard is in accordance with "advanced, rational, scientific, standardized" principle and rail transport engineering components manufacturing processing steps, briefly each station
Sequence (Post) content of the work, practices; the provisions of the respective steps (positions) labor quota, quota, mechanical (equipment) conditions, employing technology
Energy requirements and the adjustment factor standard.
Rail engineering components manufacturing Work Quota
1 Scope
This standard specifies the various rail projects in steel bridges, processing, manufacturing, installation, Pedestal straddle, straddle articulated
Turnout, turnout and processing all kinds of high-speed maglev rail beam functional parts, labor quota low speed maglev track panel manufacturing capacity and job content.
This standard applies to all kinds of steel rail transit project, turnout products manufacturing and other projects in labor management.
2 rail traffic engineering component manufacturing Work Quota
2.1 parts processing component product
2.1.1 plate pretreatment
a) Work. Unit with steel, finisher, remove oxide, spray primer, drying, stacking.
b) man-days fixed in Table 1.
c) Based on the above work content corresponding configuration in accordance with professional grade technical staff of 11 people.
Table 1 plate pretreatment units of man-days per tonne
Flat rolled steel project
Steel rust
Machinery painting
Quota 0.0417 0.0417 0.0417
2.1.2 for sample
a) Work. handmade-like rod model.
b) fixed working hours are shown in Table 2.
Staff c) According to the above steps to configure the appropriate level of expertise in line with a total of 2 people.
Table 2 as the sample in minutes per tonne
Handmade items like rods, model
10.8 Quota
Note. The table handmade sample rods, model ton tonnage means the product.
2.1.3 crossed
a) Work. according to process requirements for steel and steel scribe.
b) fixed working hours are shown in Table 3.
c) According to the above steps to configure the appropriate level of compliance with professional and technical staff of six people.
Table 3 dash in minutes each
project
Plate width/mm
1,002,004,006,009,001,200 1500 1800
Plate length /
mm
100 0.500 1.00 2.00 3.00 4.00 5.00 5.50 6.00
300 1.00 2.00 2.50 3.50 5.00 6.00 7.00 8.00
600 2.00 2.50 3.00 4.00 5.50 6.50 8.00 9.00
1000 2.50 3.00 3.50 4.50 6.00 7.00 8.50 10.0
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 21745-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 21745-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 21745-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 21745-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|