|
US$289.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 21256-2025: Norm of energy consumption per unit production of main individual-process of crude steel manufacturing process Status: Valid GB 21256: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB 21256-2025 | English | 289 |
Add to Cart
|
3 days [Need to translate]
|
Norm of energy consumption per unit production of main individual-process of crude steel manufacturing process
| Valid |
GB 21256-2025
|
| GB 21256-2013 | English | 259 |
Add to Cart
|
3 days [Need to translate]
|
The norm of energy consumption per unit product of major individual -- Process of crude steel manufacturing process
| Valid |
GB 21256-2013
|
| GB 21256-2007 | English | 359 |
Add to Cart
|
3 days [Need to translate]
|
The norm of energy consumption per unit product of major procedure of crude steel manufacturing process
| Obsolete |
GB 21256-2007
|
PDF similar to GB 21256-2025
Basic data | Standard ID | GB 21256-2025 (GB21256-2025) | | Description (Translated English) | Norm of energy consumption per unit production of main individual-process of crude steel manufacturing process | | Sector / Industry | National Standard | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 14,120 | | Date of Issue | 2025-06-30 | | Date of Implementation | 2026-07-01 | | Older Standard (superseded by this standard) | GB 21256-2013, GB 32050-2015 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB 21256-2025: Norm of energy consumption per unit production of main individual-process of crude steel manufacturing process ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB21256-2025
ICS 27.010
CCSF01
National Standard of the People's Republic of China
Replaces GB 21256-2013, GB 32050-2015
Energy consumption limits per unit product for major processes in crude steel production
Released on June 30, 2025
Implementation on July 1, 2026
State Administration for Market Regulation
The National Standardization Administration issued
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document replaces GB 21256-2013 "Limits of energy consumption per unit product in major processes of crude steel production" and GB 32050-2015 "Limits of energy consumption per unit product in major processes of crude steel production"
Compared with GB 21256-2013 and GB 32050-2015, in addition to structural adjustments and editorial
In addition to the modifications, the main technical changes are as follows.
a) Added relevant content on the energy consumption limit per unit product of the electric arc furnace process (see 3.5, 4.5, 5.1.5, 5.2.5 and Chapter 6);
b) Added energy consumption limit levels (see Chapter 4);
c) The technical requirements have been changed to clarify the corresponding relationship between the limit value, entry value and energy consumption limit level (see Chapter 5, GB 21256-
2013, Chapter 4);
d) The advanced values of energy consumption per unit product in the main processes of crude steel production have been deleted (see 4.3 of GB 21256-2013);
e) The advanced values of main energy recovery in the main processes of crude steel production (see 4.4 of GB 21256-2013) have been deleted;
f) The advanced value of the limit under the electricity equivalent value conversion coefficient (see 4.5 of GB 21256-2013) has been deleted;
g) Energy-saving measures (see Chapter 6 of GB 21256-2013) have been deleted.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document is proposed and coordinated by the National Standardization Administration.
The previous versions of this document and the documents it replaces are as follows.
--- GB 21256-2007 was first issued in.2007 and revised for the first time in.2013;
--- This is the second revision, incorporating the content of GB 32050-2015 "Energy Consumption Limits per Unit Product for Electric Arc Furnace Smelting"
(The previous versions of GB 32050-2015 are. GB 32050-2015).
Energy consumption limits per unit product for major processes in crude steel production
1 Scope
This document specifies the energy consumption per unit product (hereinafter referred to as unit product energy consumption) limit level, technical requirements,
Statistical scope and calculation method.
This document applies to the energy consumption per unit product of sintering process, pelletizing process, blast furnace process, converter process and electric arc furnace process in steel enterprises.
Calculation, evaluation, and energy consumption control of new construction and renovation projects.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 12723 General rules for the compilation of energy consumption limits per unit product
GB 17167 General Rules for the Provision and Management of Energy Metering Instruments in Energy-consuming Units
GB/T 21368-2008 Requirements for the deployment and management of energy metering equipment in steel enterprises
3 Terms and Definitions
The terms and definitions defined in GB/T 12723 and the following apply to this document.
3.1
During the reporting period, the total amount of various energy actually consumed in the sintering process for producing one ton of qualified sintered ore after deducting the amount of recovered energy.
3.2
During the reporting period, the total amount of various energy actually consumed in the pelletizing process for producing one ton of qualified pellets after deducting the amount of recovered energy.
3.3
During the reporting period, the total amount of various energy actually consumed after deducting the amount of recovered energy for every ton of qualified pig iron produced in the blast furnace process.
3.4
process
During the reporting period, the total amount of various energy actually consumed in the converter process for producing one ton of qualified crude steel after deducting the amount of recovered energy.
3.5
process
During the reporting period, the total amount of various energy actually consumed after deducting the amount of recovered energy for every ton of qualified crude steel produced in the electric arc furnace process.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 21256-2025_English be delivered?Answer: Upon your order, we will start to translate GB 21256-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 21256-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB 21256-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB 21256-2025?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 21256-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|