DL/T 1192-2020 English PDF

US$489.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
DL/T 1192-2020: Protector for splicing sleeve of overhead transmission line
Status: Valid

DL/T 1192: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
DL/T 1192-2020English489 Add to Cart 4 days [Need to translate] Protector for splicing sleeve of overhead transmission line Valid DL/T 1192-2020
DL/T 1192-2012English359 Add to Cart 3 days [Need to translate] Protector of splicing fitting for overhead transmission line Obsolete DL/T 1192-2012

PDF similar to DL/T 1192-2020


Standard similar to DL/T 1192-2020

GB/T 17737.100   GB/T 21711.1   

Basic data

Standard ID DL/T 1192-2020 (DL/T1192-2020)
Description (Translated English) Protector for splicing sleeve of overhead transmission line
Sector / Industry Electricity & Power Industry Standard (Recommended)
Classification of Chinese Standard L24
Classification of International Standard 29.120.20
Word Count Estimation 21,277
Date of Issue 2020-10-23
Date of Implementation 2021-02-01
Older Standard (superseded by this standard) DL/T 1192-2012
Quoted Standard GB/T 191; GB/T 699; GB/T 1591; GB/T 2822; GB/T 8162; GB/T 1804-2000; DL/T 318; DL/T 371; DL/T 875; JB/T 5054.1; JB/T 5054.2
Regulation (derived from) National Energy Administration Announcement No. 5 (2020)
Issuing agency(ies) National Energy Administration
Summary This standard specifies the classification and naming, basic parameters, technical requirements, test methods, inspection rules, markings, packaging, transportation and storage of connection protection devices for overhead transmission lines (referred to as connection protection devices). This standard is applicable to the design, manufacture, test, inspection and use of protective devices for connecting pipes for tension wires of overhead transmission lines and ground wires (referred to as ground wires).

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DL/T 1192-2020_English be delivered?

Answer: Upon your order, we will start to translate DL/T 1192-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DL/T 1192-2020_English with my colleagues?

Answer: Yes. The purchased PDF of DL/T 1192-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DL/T 1192-2020?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DL/T 1192-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information