| US$279.00 · In stockDelivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
 LY/T 2131-2019: Technical Regulations for Cultivation of Carya cathayensis Sarg.
 Status: Valid
 LY/T 2131: Evolution and historical versions
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |  
			| LY/T 2131-2019 | English | 279 | Add to Cart | 3 days [Need to translate] | Technical Regulations for Cultivation of Carya cathayensis Sarg. | Valid | LY/T 2131-2019 |  
			| LY/T 2131-2013 | English | 639 | Add to Cart | 3 days [Need to translate] | Technical regulations for production of Carya cathayensis Sarg. | Obsolete | LY/T 2131-2013 |  
	 
       PDF similar to LY/T 2131-2019 
 Basic data             | Standard ID | LY/T 2131-2019 (LY/T2131-2019) |           | Description (Translated English) | Technical Regulations for Cultivation of Carya cathayensis Sarg. |           | Sector / Industry | Forestry Industry Standard (Recommended) |           | Classification of Chinese Standard | B38 |           | Classification of International Standard | 65.020.20 |           | Word Count Estimation | 12,166 |           | Date of Issue | 2019-10-23 |           | Date of Implementation | 2020-04-01 |           | Older Standard (superseded by this standard) | LY/T 2131-2013 |           | Regulation (derived from) | Announcement of the State Forestry and Grassland Administration No. 17 of 2019 |           | Issuing agency(ies) | State Forestry and Grassland Administration | LY/T 2131-2019: Technical Regulations for Cultivation of Carya cathayensis Sarg.---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.(Technical regulations for pecan cultivation)
ICS 65.020.20
B 38
LY
People's Republic of China Forestry Industry Standard
Replacing LY/T 2131-2013
Pecan cultivation technical regulations
Technical Regulations for Cultivation of Carya cathayensis Sarg.
2019-10-23 released
2020-04-01 implementation
Published by the National Forestry and Grassland Administration
 ContentsForeword ... II
1 Scope ... 1
2 Normative references ... 1
3 Terms and definitions ... 1
4 Seedlings ... 1
5 Planting ... 2
6 Tree Cultivation ... 3
7 Forest management ... 4
8 Pest Control ... 5
Appendix A (informative appendix) Hickory cultivation management worksheet ... 6
Appendix B (Informative) Control of main pests and diseases of pecan ... 7ForewordThis standard replaces LY/T 2131-2013 "Hickory Production Technical Regulations". Compared with LY/T 2131-2013, the main technical changes are as follows.
-It is stipulated that the slope of the planting land is not greater than 25o.
-Increased the ecological cultivation of young and grown forests.
-Added content to protect flowers and fruits.
-Added the work item list of pecan cultivation and management.
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by Anhui Agricultural University.
This standard is under the jurisdiction of the National Economic Forest Products Standardization Technical Committee (SAC/TC 557).
The main drafting organizations of this standard. Anhui Agricultural University, Zhejiang Agriculture and Forestry University, Chinese Academy of Forestry Research Institute of Subtropical Forestry, China Forestry
Research Institute of Forestry, National Academy of Forestry and Grassland Administration.
The main drafters of this standard. Huang Xingzhao, Huang Jianqin, Chang Jun, Jiang Chunqian, Xu Xiaoniu, Fu Songling, Bai Yanfeng, Zhang Longwa, Xia Guohua, Liu
Chang Yong.
This standard was first issued in.2013 and this is the first revision.
Pecan cultivation technical regulations1 ScopeThis standard specifies the production techniques of Carya cathayensis Sarg.
Management, pest control, harvesting and nut processing.
This standard applies to the production and cultivation of Tianmu walnut. Dabieshan pecan (C.dabieshanensis), Hunan pecan (C.hunanensis)
Production and cultivation can also be used as a reference.2 Normative referencesThe following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB 3095 Ambient Air Quality Standard
GB 5084 farmland irrigation water quality standards
GB 15618 soil environmental quality agricultural land soil pollution risk control standard3 terms and definitionsThe following terms and definitions apply to this document.
3.1
Female flower opening
The stigma of the female flower becomes purple-red, and the female flower is said to be open when mucus is secreted.
3.2
Assisted pollination
Pollen method of putting pollen into a pollen bag and hanging it on the air outlet or on the top of a bamboo pole, shaking while walking4 Seedlings4.1 Grafting
4.1.1 Rootstock
Rootstocks should be selected to have a ground diameter of more than 0.7㎝ and grow robust pecan seedlings.
4.1.2 Scion
During the dormancy period of pecans, the middle and upper periphery of the crown of the plucking mother tree are cut, and the annual branches are robust, full of buds, and short internodes.
800 times to 1000 times of milomycin or methyl tobzine, dry after treatment, sealed with nylon film, and stored in a cold storage at 0 ° C to 5 ° C for future use.
4.1.3 Grafting period
Graft during the period when the rootstock compound leaves spread out and the leaflets are fully grown.
4.1.4 Grafting
The rootstock is cut transversely, a cut is made on one side of the cross section, and the scion is inserted into the cut to graft. After the grafting, wipe the buds in time to remove the sprouts, loosen the weeds, and graft
After 60 ~ 100 days, remove the shackles.
4.2 Post-graft management
4.2.1 Topdressing
After mid-June, the fertilizer can be topdressed, mainly nitrogen; the last fertilizer is applied in early October, mainly phosphorus and potassium.
4.2.2 Shade
In the middle and late May, a shade shed should be set up to prevent the growth of seedlings due to high temperature sunburn.
4.2.3 Watering
When the surface of the seedbed becomes white, water it in time, spray it before 9.00 am and after 17.00 pm, and the wet soil layer is limited to 10cm. Irrigation water
The water quality should meet the requirements of GB 5084.
4.2.4 Seedling classification
Table 1 Seedling specifications
Seedling species seedling age
Ground diameter (cm) Seedling height (cm)
Ⅰ Ⅱ Ⅰ Ⅱ
Provincial and above
Certified Breed
1 (1) -0 or 1 (1) -1 ≥0.6 ≥0.4 ≥50 ≥35
1 (2) -0 or 1 (2) -1 ≥0.8 ≥0.6 ≥80 ≥50
Note. 1 Seedling age. the first number indicates the number of years the seedlings are in place, the second number indicates the number of years of cultivation after transplantation, and the number is short
Horizontal line spacing; the number in parentheses indicates the number of years of grafted seedlings.5 Planting5.1 Planting site selection
The annual average temperature is 15 ℃ ~ 18 ℃, the annual precipitation is 1000 mm ~ 1500 mm, and the altitude is.200 m ~ 800 m.
Good, hills or slopes with a slope not greater than 25º are suitable. The soil ranges from sandy loam to light clay, with a pH of 5.3 to 7.5 and a soil layer greater than 60 cm. Produce
There must be no sources of atmospheric pollution around the ground, and the ambient air must comply with GB 3095. The quality of irrigation water must meet GB 5084. The soil must meet GB 15618.
5.2 Planting planning
5.2.1 Ecological cultivation
According to local conditions, try to keep the original vegetation as much as possible. For the exposed parts, shade-resistant vegetation and legumes that consume water and have low fertility can be planted to protect
Holding water and improving soil.
5.2.2 Weir
Use the small stones in the forest to form a small platform 2m in the downhill direction of the pecan tree to retain water and soil. Excavation of rock ridges on slopes greater than 15o
Move the soil to make a horizontal tree tray.
5.2.3 Building a reservoir
Build 0.5m³ ~ 3m³ reservoirs in the forest, including cement ponds, plastic container ponds, plastic film ponds, etc.
5.3 Digging holes
5.3.1 Land preparation
It should be carried out in November. Strip-shaped land preparation is adopted for less than 15o, and block-shaped land preparation is adopted for more than 15o, and the vegetation between the strips and around the block is preserved.
5.3.2 Digging
The specification (length × width × depth) is 60cm × 60cm × 60cm, and each well is applied with fully decomposed farmhouse organic fertilizer 25 kg ~ 30 kg and 0.1 kg
Supercalcium phosphate was used as the base fertilizer, and then the topsoil was returned to the acupoint and covered with soil for planting.
5.4 Colonization
5.4.1 Fixed value density
The row spacing is 6 m × 6 m or 6 m × 5 m.
5.4.2 Setting time
Pecan seedlings are best afforested immediately after deciduous leaves and before spring sprouts, generally at the end of October to mid-November or mid to late March to early April.
5.4.3 Planting methods
Before planting, trim the overly long and split main root, and the main root length should not exceed 30 cm.
5.5 Young plantation
5.5.1 Replenishment
The next year after reforestation, seedlings will be replenished, and the same age seedlings will be replanted.
5.5.2 Weeding
Artificial weeding, weeding twice a year, from May to June, September to October, weeding weeds within 30 cm
Adult weeding points are expanded 30 cm to 40 cm each year.
5.5.3 Fertilization
Fertilization should not be applied in the current year. Fertilization should be carried out in the second and the second year from the second and the second half of August respectively. The two to three-year-old plants were compounded with 0.5 kg of compound fertilizer.
Divided rotten farmhouse fertilizer 15 kg ~ 20 kg; 4 years later, 1.0 kg of compound fertilizer was applied to the plant, and rotten cooked farmhouse fertilizer 20 kg ~ 30 kg. Fertilization method is the same as 7.2.2.6 Tree cultivation6.1 Shaping
It will be dry in the year of planting, with a height of 40cm ~ 60cm. After sprout, keep 2 to 4 main branches. Through topping, wiping buds, pulling branches, etc.,
Cultivate naturally open-hearted or trunk-layered trees.
6.2 Trim
Hickory tree sprouts when the naked buds turn greenish green. Cut off dense branches, remove diseased branches and dead branches and remove burned in time.
The trimming mouth is coated with antiseptic and paraffin to promote healing.7 Forest management7.1 Weeding and loosening
Weeding and loosening should be carried out simultaneously. Manually weeding and clearing the forest land before harvesting, and weeding with systemic herbicides (such as glyphosate) are prohibited. 15o Forest
The soil loosening is performed by a shovel and winter digging. The shovel is carried out after the rainy season, and the depth of the surface cutting grass and soil does not exceed 8 cm; winter excavation is in the dormant period after fruit harvest
Proceed with a depth of 20 cm.
7.2 Fertilization
7.2.1 Fertilizer types
Use compound fertilizer. The soil is fertile. When the trees grow vigorously, the proportion of N can be reduced, and the proportion of P and K can be increased.
7.2.2 Fertilizer application rate, time and method
Table 2 Fertilizer application table
time
Unit/strain
Compound fertilizer/organic fertilizer application
Fertilizer/kg
Account for total fertilization
Quantity ratio
Fertilization method
1 ~ 1.5/15 ~ 20 per plant per year. Gently dig a circular trench at 2/3 from the base of the canopy projection. Slope
Dig a semi-circular ditch on the uphill of the tree, the depth of the ditch is about 20 cm, and the fertilizer is evenly distributed.
Put it into the ditch, and then cover it with soil.
Late May 0.4 ~ 0.6/6 ~ 8 40%
End of August to mid-September 0.6 to 0.9/9 to 12 60%
7.3 Auxiliary pollination
7.3.1 Pollination time
From late April to early mid-May, within 10 days of female flowers opening.
7.3.2 Pollen Collection
Collect the male flowers that are about to loosen powder, place them in a place without direct sunlight to dry, collect the pollen, and put it in a low temperature of 2oC ~ 5oC for later use. Pollen retention
No more than 10 days.
7.3.3 Pollination weather
It will be carried out between 8.00 and 16.00 on a sunny day. If it rains within 12 hours after pollination, pollination should be re-pollinated.
7.3.4 Pollination methods
Assist pollination.
7.4 Flowers and Fruits
7.4.1 Time
The flowering period from the end of the month to the middle of May and the young fruit period from the end of May to the beginning of June.
7.4.2 Reagents
Copper sulfate should be used for calcareous soil, and triacontanol should be used for other soils.
7.4.3 Concentration
When spraying, the concentration of copper sulfate is 0.325 g/kg, and the concentration of triacontanol is 0.01 mg/kg ~ 1.00 mg/kg; when coated, the copper sulfate is 3.25
g/kg concentration, triacontanol concentration of 0.1 mg/kg (flowering) to 10.0 mg/kg (young fruiting).
See Appendix A for the main work items of pecan cultivation and management8 Pest controlSee Appendix B for the harmful symptoms, control period and control methods of common pests and diseases.Appendix A(Informative appendix)
Hickory Cultivation Management Worksheet
Main phenological items
I. dormant period
(After falling leaves to before budding)
1. Applying base fertilizer and deep turning
2. Winter pruning, pulling branches, cutting and renewing, etc.
Ⅱ. Germination stage
(Naked buds sprout until inflorescences appear)
1. Replanting missing plants and transplanting sprouts;
Grafting
3. Spring ploughing, irrigation and drainage
4. Topping and spring pruning
5. Control aphids
Ⅲ. Flowering stage
(Inflorescence elongated until young fruit appear)
1. Management after grafting, fertilizing, removing buds, topping, shading, etc.
2. Topdressing and weeding
3. Prevention and treatment of flower buds
4. Artificially assisted pollination
5. Prevention and treatment of dry rot
Ⅳ. Fruit expansion period
(Young fruit to harvest)
1. Watering and topdressing
2.Cultivation, weeding, shading
3. Topping and Summer Pruning
4. Untie the straps and help windbreak
5. Control of leaf-eating pests and dry worms
6. Prevention and cure of leaf blight, leaf spot, dry rot, etc.
7. Drought resistance, mooring protection, and irrigation
8. Clear the garden and prepare for harvest
9. Harvesting Pond
Ⅴ. Deciduous period
(After picking the fruit to the end of the leaf)
1. Autumn sowing seedling preparation, germination, sowing, drainage
2. Clean up dead branches, fallen leaves and overwintering pests
3. Applying base fertilizer
4. Planting young trees
5. Deep turning and rebuildingAppendix B(Informative appendix)
Main pest control of pecan
Disease name
Department of Harm
Bit, way
Or symptoms
Protection period
Control method using the proportion
note
Matters larva adult
Hickory Sky Club
Edible leaf
Early May to late June
Mid to late July
Mid to late August
Early September to late October
Mid april
Late June
Late July
Late august
spray
Smoke aerosol, artificial
Fixed mobile casting.
Light traps adult
25% Guangzhi cream
2..5% fenthrin
EC
Dima
1. 1000 to.2000
1. 1500
1-2 kg/mu
Use smoke
Agent should be selected
In the early morning
No wind at night or
Breeze or overcast
Enter in rainy days
Walnut Leopard Night Moth Ibid.
Late May to early July
Late July to early August
Late August to mid September
Early October to mid-October
Late
Mid-May
Mid-July
Mid august
Middle and Lower September
Ibid ibid ibid
Ichigo
Early June to mid July
Early August to late September
In mid-May,
Late July
Ibid ibid ibid
Iris tungensis
Mid-May to Late June
Mid-July to Late August
Late September to mid November
Late April
Mid-July
Early September
Eye spot moth ibid.
Early and mid-June
Early July, mid-July, August,
Mid, early and mid September
In late May,
In late June,
In late July,
Late august
Ibid ibid ibid
Adult control
Available lights
Trapping
Straight on the ground
Take over
Refers to the medicine spray
kill.
Sting Moth Ibid
Late June to late August
Late August to late September
In late May,
In early June,
Mid-August
Ibid ibid ibid
Green-legged locust
Qin Qin
Ibid
Mid-April to Late June
Late May ~ Late July
In early July,
Early august
Ground spray control
Jump
Dried straw with medicinal solution
(3 kg) per mu
7-8 Heap, set grass
Heap trap adult
2.5% top star
90% Crystal Dibai
Fresh human dung
Urine
1. 1500 ~.2000
0.25 kg
25 kg
Disease name
Department of Harm
Bit, way
Or symptoms
Prophylaxis control method
note
matter
Hickory aphid
Stinging leaf buds
And twigs
Early April
spray
Punch injection
spray
5% imidacloprid EC
Matrine
1. 1000 ~
1. 1
1. 1000
Coffee wood moth
Larva borer
branch
Late July to late October
Mid-June to July
Mid-term
Manual cleaning
Punch injection
Light traps adult
Ibid. 1. 1
Liyuanyu
Branches and leaves
Stabbing hazard
Mid-April to Early May
Early June to mid July
Mid-August to Mid-September
Punch
spray
5% imidacloprid EC
10% g milk
oil,
20% quick kill
Avermectin
1. 1
1. 400 to 500
1. 1000 to 1500
1. 1000 to 1500
Thrips and thrips sucking from early June to late August
20% spray mites
70% acaricid
1. 1000 to 1500
Pecan flower bud
Stinging inflorescence
And flower buds,
Bend it
Bending and swelling
Early April to mid-late April
Ground spray kill
Insects 2 to 3 times,3 days apartSpray spray on flowers
20% Speed Kill
40% Chlorpyrifos Milk
1. 1000 to 1500
1. 800 ~ 1000
Must make medicine
Agent penetrates
bud
Underground pest
(Xiaodi Lao
Tiger, tadpole)
April to October
Watering in a row
Bait trap
Kill by hand
Light trap
25% rootworm net
50% phoxim
Stir-fried cakes, sugar cane
10% slag
Mosquito wettability
Powder or 40%
Chlorpyrifos emulsion
500 ~ 1000 times
1. 1000
Around 10. 1
Morning and night
termite
Ravenous root
Cortex
Early April to June
September to October
Buried soil trap termite attractant 15-20 packets per mu
Follow the instructions
Magnolia officinalis tree hole injection from July to November
50% acetomethylamine
1. 1
Pecan
Dry rot
Tree stream
"Blackwater"
Early April to late June
Smear or spray
Antibacterial agent "402"
(80% ethyl allicin)
1. 100 to.200
Once every 7 days/3
Scrape
After spraying or
On the spot
After the underline
Respray effect
Fruit is best
Brown spot
Foliar presentation
Irregular brown
Color spot
Spray from late May to mid July
57.6% Crown Bacterial
powder
50% carbendazim
1. 500 ~ 600 Same as above
Red spot disease
From the leaf margin,
Leaf tip extension
spread
From the end of May to the middle of July, Ibid. Make the 100g powder 1. 500 ~ 600 Ibid.
Pecan
Blight
From small branches
Start to rough
Sprawl
Die
Mid April to Mid May Same as above
70% methyltorb
25% sterilization king
1. 500 ~ 800 Same as above
Pecan
Root rot
Root rot
Darken
Mid-April to Late June
Watering the roots
Timely drainage
Furrow margin
Isolation
Ash and Potion
Root Rot
15% copper triazole
Wet powder
1. 300
1. 400 to 500
Ibid
Pseudostem
Blight
Shoot down
Spread individual
Also available from
Stem invasion
Into the branches
Blackened and dead
Early to mid April to late May
Spray 50% sterilization king
15% copper triazole
Wet powder
1. 500 ~ 600
Once every 7 days/3
Rhizoctonia solani
Seedling stems,
Ye was injured.
Seed rot
Rotten stems and leaves
Rotten
Sudden death of Miao.
April to May
spray
Timely drainage
Root Rot 1. 400
Once every 7 days/3
White silk disease
Rhizome
Harm, whole plant
Die
June to August
Spray 40% Irisporium net 1. 500
Once every 7 days/3
 
 Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of LY/T 2131-2019_English be delivered?Answer: Upon your order, we will start to translate LY/T 2131-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of LY/T 2131-2019_English with my colleagues?Answer: Yes. The purchased PDF of LY/T 2131-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries Question 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected] . In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version LY/T 2131-2019?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version LY/T 2131-2019 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.    |