US$189.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41576-2022: Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 41576-2022 | English | 189 |
Add to Cart
|
3 days [Need to translate]
|
Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
| Valid |
GB/T 41576-2022
|
PDF similar to GB/T 41576-2022
Basic data Standard ID | GB/T 41576-2022 (GB/T41576-2022) | Description (Translated English) | Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F63 | Word Count Estimation | 9,941 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41576-2022: Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
ICS 27.120.20
CCSF63
National Standards of People's Republic of China
Requirements for unit performance test after charging of pressurized water reactor nuclear power plant
Published on 2022-11-01
2023-02-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Test purpose 2
5 Test conditions 2
6 Test content 2
7 Acceptance Criteria 6
8 Test records and reports 6
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed and managed by the National Nuclear Energy Standardization Technical Committee (SAC/TC58).
This document is drafted by. China Nuclear Power Engineering Co., Ltd., China General Nuclear Power Engineering Co., Ltd., Shanghai Nuclear Engineering Research and Design Institute Co., Ltd.
The main drafters of this document. Xing Ji, Chu Jiru, Gao Chao, Liu Yong, Yuan Xia, Liu Wenjie, Wang Shixing, Tian Qiwei, Song Wenkui, Ma Zhongjie, Chen Wei,
Feng Jia.
Requirements for unit performance test after charging of pressurized water reactor nuclear power plant
1 Scope
This document specifies the test purpose, test conditions, test content and acceptance criteria of the unit performance test after the initial charging of the pressurized water reactor nuclear power plant
and test records and reports.
This document is applicable to the unit performance test after the initial charging of the pressurized water reactor nuclear power plant.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
NB/T.20145 Nuclear power plant commissioning test procedures and report writing specifications
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Debug commissioning
The process of operating installed nuclear power plant components and systems and verifying that their performance conforms to design requirements and related criteria.
Note. Commissioning includes tests without nuclear reactions and with nuclear reactions.
3.2
initial fuelloading
The initial loading of nuclear fuel is carried out according to the core loading map, and the core flux monitoring is carried out during the loading process.
3.3
subcriticality
The state of the reactor when its effective multiplication factor Keff < 1.
3.4
initialcriticality
The reactor is physically started for the first time under the rated thermal condition, reaching the criticality and realizing a self-sustaining chain fission reaction.
3.5
low power test
Reactor performance tests under a power platform slightly above zero power.
3.6
power test powertest
A series of tests carried out under the specified power platform.
Note. Typical power decks include 10% power deck, 25% power deck, 50% power deck, 75% power deck, 90% power deck and 100% power deck
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41576-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41576-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41576-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41576-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|