Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants
| Valid |
GB/T 41584-2022
|
PDF similar to GB/T 41584-2022
Basic data Standard ID | GB/T 41584-2022 (GB/T41584-2022) | Description (Translated English) | Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F63 | Word Count Estimation | 8,861 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41584-2022: Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants
ICS 27.120.20
CCSF63
National Standards of People's Republic of China
Requirements for thermal performance test before charging of pressurized water reactor nuclear power plant
Published on 2022-07-11
2023-02-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Test purpose 1
5 Test conditions 1
6 Test content 2
7 Acceptance Criteria 4
8 Test records and reports 4
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed and managed by the National Nuclear Energy Standardization Technical Committee (SAC/TC58).
This document is drafted by. China Nuclear Power Engineering Co., Ltd., China General Nuclear Power Engineering Co., Ltd., Shanghai Nuclear Engineering Research and Design Institute Co., Ltd.
The main drafters of this document. Xing Ji, Tang Wenxi, Shang Chen, Yang Xiaoyan, Tian Qiwei, Chen Wei, Liu Guangwei, Sun Pengpeng, Wu Jiabin, Du Yangang,
Zhang Zhaolin.
Requirements for thermal performance test before charging of pressurized water reactor nuclear power plant
1 Scope
This document specifies the test purpose, test conditions, test content and acceptance criteria of the thermal performance test before initial fuel loading of PWR nuclear power plants
and test records and reports.
This document is applicable to the thermal performance test before initial fuel loading of pressurized water reactor nuclear power plants.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
NB/T.20145 Nuclear power plant commissioning test procedures and report writing specifications
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Debug commissioning
The process of operating installed nuclear power plant components and systems and verifying that their performance conforms to design requirements and related criteria.
Note. Commissioning includes tests without nuclear reactions and with nuclear reactions.
3.2
hotperformancetest
By simulating the actual operating conditions of the nuclear steam supply system in the nuclear power plant, the thermal performance of the nuclear steam supply system and the presence of equipment and instruments in the
Test of working reliability under constant temperature and pressure.
4 Purpose of the test
4.1 Verify that system performance is consistent with specified requirements. The thermal performance test should simulate the operating conditions of the power plant as much as possible, including
expected operating events at the temperature, pressure, and flow rate.
4.2 Verify the efficiency of the insulation and cooling system as far as possible. The test will initially check flow, vibration, clearance and other adaptations to the component or system
measures taken to expand. The test shall verify the operation of instruments and other equipment at high temperatures, and confirm the relevant operating techniques.
4.3 The duration of the thermal performance test shall be such that the test reaches steady state operating conditions to determine whether structures, systems and components can be
operating conditions.
5 Test conditions
The test conditions of the thermal performance test before charging mainly include.
a) The organizational structure, division of responsibilities, human resources, planning and administrative management have been arranged;
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41584-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41584-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41584-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41584-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|