HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 41585-2022 English PDF

US$479.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 41585-2022: Specification of draw-up commissioning program for pressurized water reactor nuclear power plants
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 41585-2022English479 Add to Cart 4 days [Need to translate] Specification of draw-up commissioning program for pressurized water reactor nuclear power plants Valid GB/T 41585-2022

PDF similar to GB/T 41585-2022


Standard similar to GB/T 41585-2022

NB/T 20015   NB/T 20332   NB/T 20325.1   GB/T 41584   GB/T 41576   

Basic data

Standard ID GB/T 41585-2022 (GB/T41585-2022)
Description (Translated English) Specification of draw-up commissioning program for pressurized water reactor nuclear power plants
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F63
Word Count Estimation 24,232
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 41585-2022: Specification of draw-up commissioning program for pressurized water reactor nuclear power plants


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification of draw-up commissioning program for pressurized water reactor nuclear power plants ICS 27.120.20 CCSF63 National Standards of People's Republic of China Specification for the compilation of commissioning program for pressurized water reactor nuclear power plants Published on 2022-07-11 2023-02-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 The basic content and writing requirements of the debugging outline 1 4.1 Overview 1 4.2 Division of commissioning stages and main test contents of each stage 3 4.3 Commissioning plan7 4.4 Commissioning organization, responsibilities and personnel 8 4.5 Debug files 8 4.6 Implementation of Debugging 8 4.7 Nuclear safety management and quality management during commissioning 9 4.8 Debug Manager 9 4.9 Appendix 11 4.10 Typical Commissioning Outline Section 11 Appendix A (Informative) Example of NPP Commissioning Test Project 12 Appendix B (Informative) Typical Commissioning Outline Chapter Example 19

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed and managed by the National Nuclear Energy Standardization Technical Committee (SAC/TC58). This document is drafted by. China Nuclear Power Operation Management Co., Ltd., China Nuclear Power Engineering Co., Ltd., China General Nuclear Power Engineering Co., Ltd., Shanghai Nuclear Engineering Research and Design Institute Co., Ltd. The main drafters of this document. Fei Zhisong, Ren Yong, Liang Zhenyang, Jin Chengyi, Tian Lu, Du Yangang, Zhang Songlin, Zhong Xiaohua, Zhang Jianguo, Chen Wei, Li Wenshuang, Zhou Zhiwen, Weng Yunfeng, Ren Hongtao, Dai Wanxiang. Specification for the compilation of commissioning program for pressurized water reactor nuclear power plants

1 Scope

This document specifies the basic content and preparation requirements of the PWR NPP commissioning program. This document is applicable to the compilation of the commissioning program for pressurized water reactor nuclear power plants.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. HAD103/02-1987 Nuclear Power Plant Commissioning Procedure

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Debug commissioning The process of operating installed nuclear power plant components and systems and verifying that their performance conforms to design requirements and related criteria. Note. Commissioning includes tests without nuclear reactions and with nuclear reactions. 3.2 first-of-a-kindtest; FOAKtest For structures, systems and equipment with new conceptual design and new design characteristics in the new series of pressurized water reactor nuclear power models Brand new, unique, unique or special commissioning trials.

4 The basic content and writing requirements of the debugging outline

4.1 Overview 4.1.1 Project Overview The commissioning program shall briefly describe the general situation of the nuclear power plant project, overall technical characteristics, project management and commissioning management mode, etc. 4.1.2 Purpose of preparation The commissioning outline is used to guide commissioning preparation and implementation, standardize commissioning activities, ensure the safety of commissioning activities, and meet relevant national laws and regulations. legal, regulatory and design requirements. 4.1.3 Debugging Purpose The commissioning program should clearly define the expected purpose that the commissioning activities of the NPP should achieve. mainly include. a) comprehensive inspection of design, equipment manufacturing and construction and installation quality;

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 41585-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 41585-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 41585-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 41585-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.