|
US$379.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31455.1-2015: Intelligent system of bus rapid transit -- Part 1: General technical requirements Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31455.1-2015 | English | 379 |
Add to Cart
|
3 days [Need to translate]
|
Intelligent system of bus rapid transit -- Part 1: General technical requirements
| Valid |
GB/T 31455.1-2015
|
PDF similar to GB/T 31455.1-2015
Basic data | Standard ID | GB/T 31455.1-2015 (GB/T31455.1-2015) | | Description (Translated English) | Intelligent system of bus rapid transit -- Part 1: General technical requirements | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | L73 | | Classification of International Standard | 35.240.60; 35.100.70 | | Word Count Estimation | 18,184 | | Date of Issue | 2015-05-15 | | Date of Implementation | 2015-08-01 | | Quoted Standard | GB/T 5655-1985; GB/T 28181; GB/T 31455.2; GB/T 31455.3-2015; GB/T 31455.4-2015; GB/T 31455.5; GB/T 31455.6; GB/T 31455.7 | | Regulation (derived from) | National Standard Announcement 2015 No. 15 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the part of the bus rapid transit (BRT) intelligent systems, and shows the contents of the various components and their relationships. This section applies to bus rapid transit (BRT) construction and management of intelligent systems. |
GB/T 31455.1-2015: Intelligent system of bus rapid transit -- Part 1: General technical requirements ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Intelligent system of bus rapid transit Part 1. General technical requirements
ICS 35.240.60; 35.100.70
L73
National Standards of People's Republic of China
Bus Rapid Transit (BRT) Intelligent Systems
Part 1. General Technical Requirements
Part 1. Generaltechnicalrequirements
Issued on. 2015-05-15
2015-08-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Abbreviations 6
5 7 overall system technical requirements
Index 13
Foreword
GB/T 31455 "Bus Rapid Transit (BRT) intelligent system" is divided into seven parts.
--- Part 1. General technical requirements;
--- Part 2. dispatch center system technical requirements;
--- Part 3. vehicle information terminal and automotive peripherals technical requirements;
--- Part 4. Field station platform control systems and peripheral equipment technical requirements;
--- Part 5. dispatch center and vehicle information terminal data communications interface specification;
--- Part 6. dispatch center and the station platform control system data communication interface specification;
--- Part 7. bus priority traffic signal controller equipment and data communications interface specification.
This section GB/T Part of 131,455.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part of the National Intelligent Transportation System Standardization Technical Committee (SAC/TC268) and focal points.
Drafting this Part. Research Institute of Highway Ministry of Transport, Qingdao Hisense Network Technology Co., Ltd. Beijing in the cross-country wisdom
Energy transport systems Technology Co., Ltd. Urumqi Municipal Public Security Bureau Traffic Police Detachment, integrated transport project research center of Urumqi city, Ulu
Qi wood Bus Group.
The main drafters of this section. Top Liu, Liu Dongmei, Liu Fangdong, Wu Feng Yan, Yi Qian, Wang Baoshan, three steel Mou, Yang Jindong, Liu, Sangli,
Wan Si Jun, Zhang steady, Wangxiao Kun, Dujun Wei, Yang Xiping, Cho Chang, Shaoxi Guo, He Hui, Zhang, Hong Xiaolong.
Bus Rapid Transit (BRT) Intelligent Systems
Part 1. General Technical Requirements
1 Scope
This section GB/T 31455 specifies the part of the bus rapid transit (BRT) system, intelligent, and gives the content of each component
Its relationship.
This section applies to bus rapid transit (BRT) construction and management of intelligent systems.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 5655-1985 Common terms of urban public transport
GB/T 28181 security information transmission network video surveillance systems, switching, control technology requirements
GB/T 31455.2 Bus Rapid Transit (BRT) Intelligent Systems - Part 2. Technical requirements dispatch center system
GB/T 31455.3-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 3. Car-vehicle information terminals and peripheral equipment technology
Claim
GB/T 31455.4-2015 Bus Rapid Transit (BRT) Intelligent systems - Part 4. Field station platform control systems and peripheral equipment technology
Claim
GB/T 31455.5 Bus Rapid Transit (BRT) Intelligent Systems - Part 5. dispatch center and vehicle information terminal communication data interface
specification
GB/T 31455.6 Bus Rapid Transit (BRT) Intelligent Systems - Part 6. dispatch center and the station platform data access control system communication
Interface specifications
Section 7 GB/T 31455.7 Bus Rapid Transit (BRT) Intelligent Systems. bus priority traffic signal controller equipment and communication data
Interface Specification
3 Terms and Definitions
GB/T 5655-1985 and defined the following terms and definitions apply to this document. For ease of use, repeat the following list
GB/T 5655-1985 some terms and definitions.
3.1
BRT intelligent system inteligentsystemofbusrapidtransit
Information technology, data transmission technology, electronic sensor technology, electronic control technology and computer processing technology to effectively integrate the use of
Real-time, accurate and efficient integrated intelligence system for rapid transit established.
3.2
Signs linenumberplate
Mounted in the compartment external indication lines mark.
[GB/T 5655-1985, the definition 2.2.20]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31455.1-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 31455.1-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31455.1-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31455.1-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|