|
US$499.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. YS/T 3013-2012: Technical specification for observation of tunnel displacement for the underwater gold mining engineering Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| YS/T 3013-2012 | English | 499 |
Add to Cart
|
4 days [Need to translate]
|
Technical specification for observation of tunnel displacement for the underwater gold mining engineering
| Valid |
YS/T 3013-2012
|
PDF similar to YS/T 3013-2012
Basic data | Standard ID | YS/T 3013-2012 (YS/T3013-2012) | | Description (Translated English) | Technical specification for observation of tunnel displacement for the underwater gold mining engineering | | Sector / Industry | Nonferrous Metallurgy Industry Standard (Recommended) | | Classification of Chinese Standard | H60 | | Classification of International Standard | 73.060.99 | | Word Count Estimation | 19,184 | | Quoted Standard | GB 4285; GB/T 8321.1; GB/T 8321.2; GB/T 8321.3; GB/T 8321.4; GB/T 8321.5; GB/T 8321.6; GB/T 8321.7; GB/T 8321.8; GB/T 8321.9 | | Regulation (derived from) | Ministry of Industry and Information Technology Bulletin No. 55 of 2012; industry standard filing Notice 2013 No. 2 (No. 158 overall) | | Issuing agency(ies) | Ministry of Industry and Information Technology | | Summary | This standard specifies the underwater gold mining roadway surface convergence observed, rock drilling axial and lateral displacement observation requirements and content. This standard applies to gold mining underwater tunnel rock deformation observation |
YS/T 3013-2012: Technical specification for observation of tunnel displacement for the underwater gold mining engineering ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for observation of tunnel displacement for the underwater gold mining engineering
ICS 73.060.99
H60
People's Republic of China Gold Industry Standards
Underwater gold mining tunnel rock deformation observation
specifications
Issued on. 2012-11-07
2013-03-01 implementation
Ministry of Industry and Information Technology of the People's Republic of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Gold Association.
This standard by the National Gold Standardization Technical Committee (SAC/TC379) centralized.
This standard was drafted. Shandong Gold Mining (Laizhou) Island Gold Ltd., Central South University.
The main drafters of this standard. Xiu Guo Lin, LI Xi-bing, Long Dong Jun, Yang Zhou bamboo, Zhaoguo Yan, Bi Hongtao, Dingyue Xiang, Zhao Jingqing, Heshun Bin,
Li Wei.
Underwater gold mining tunnel rock deformation observation
specifications
1 Scope
This standard specifies the underwater surface gold mining tunnel convergence observations, drilling axial and lateral displacement of the Rock observation requirements and content.
This standard applies to gold mining underwater tunnel rock deformation observations.
2 Normative references
The following documents for the application of this document is essential, dated references, only the dated version suitable for use herein
Member, undated references, the latest edition (including any amendments) applies to this document.
GB 50021 geotechnical engineering specifications
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Rock rockmass
Consisting of geological structure and surface structure.
3.2
Rock deformation observation observationofrockmassdeformation
Use special instruments and methods for rock mass deformation of continuous observation of the rock mass deformation analysis of morphology and rock deformation
Development trend forecasting and other work.
3.3
Reference point referencepoints
Deformation observation, measured as a stable working point and observation point based on unreliable sources.
3.4
Measuring point observationpoints
Observing body disposed on (or inside), the reaction can be characterized as deformation, displacement, stress or strain measurements with a fixed flag.
3.5
Survey line surveylines
Lane measure laid between the cave walls of two-point connection when collectively through deformation.
3.6
Observed frequency frequencyofobservation
The number of observations per unit of time.
3.7
Tunnel face tunnelface
Face underground excavation engineering or mining engineering.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of YS/T 3013-2012_English be delivered?Answer: Upon your order, we will start to translate YS/T 3013-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of YS/T 3013-2012_English with my colleagues?Answer: Yes. The purchased PDF of YS/T 3013-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|