|
US$519.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. YS/T 3010-2012: Technical requirement for groundwater volume management model of gold mine Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| YS/T 3010-2012 | English | 519 |
Add to Cart
|
4 days [Need to translate]
|
Technical requirement for groundwater volume management model of gold mine
| Valid |
YS/T 3010-2012
|
PDF similar to YS/T 3010-2012
Basic data | Standard ID | YS/T 3010-2012 (YS/T3010-2012) | | Description (Translated English) | Technical requirement for groundwater volume management model of gold mine | | Sector / Industry | Nonferrous Metallurgy Industry Standard (Recommended) | | Classification of Chinese Standard | H60 | | Classification of International Standard | 73.060.99 | | Word Count Estimation | 20,278 | | Regulation (derived from) | Ministry of Industry and Information Technology Bulletin No. 55 of 2012; industry standard filing Notice 2013 No. 2 (No. 158 overall) | | Issuing agency(ies) | Ministry of Industry and Information Technology | | Summary | This standard specifies the gold mine water management model for groundwater data collection techniques, supplementary exploration of hydrogeology, groundwater management model and its management during the period of groundwater monitoring and outcome rep |
YS/T 3010-2012: Technical requirement for groundwater volume management model of gold mine---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirement for groundwater volume management model of gold mine
ICS 73.060.99
H60
People's Republic of China Gold Industry Standards
Gold Mine Water Management Model technical requirements for groundwater
Issued on. 2012-11-07
2013-03-01 implementation
Ministry of Industry and Information Technology of the People's Republic of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Terms and definitions 1
3 General 2
4 basic requirements for data collection 2
5 supplementary hydrogeological exploration in claim 2
Establishment of 6 gold mine groundwater water management model 3
Dynamic monitoring of groundwater management period 7 9
Submit 108 results report
Appendix A (informative) Probability Model 12 required information
Annex B (informative) schematic division unit 13
Annex C (informative) nodes and schematic cell number 14
Annex D (informative) node coordinates 15
Node numbers Appendix E (informative) Table 16 units
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Gold Association.
This standard by the National Gold Standardization Technical Committee (SAC/TC379) centralized.
This standard was drafted. Shandong Gold Mining (Laizhou) Island Gold Ltd., Central South University.
The main drafters of this standard. He Jiping, Gong Feng Qiang, Guo Lin Xiu, LI Xi-bing, Qi Zhaojun, Zhaoguo Yan, Li Wei, Liu Zhixiang, Wang Shanfei, Wang Jiang,
Liu Zicheng.
Gold Mine Water Management Model technical requirements for groundwater
1 Scope
This standard specifies the quantity of gold mining groundwater management model technology in data collection, hydrogeological supplementary exploration, groundwater water management module
Groundwater monitoring requirements for dynamic and results Establishment and management of the reporting period, the type of.
This standard applies to gold mining groundwater water management model technical work.
2 Terms and Definitions
The following terms and definitions apply to this document.
2.1
Generalization generalization
The definition of the hydrogeological conditions of the change or supplement to adapt it to a larger scale.
2.2
Systems engineering approach approachesofsystemengineering
To classify the issues to be addressed and the circumstances, determine the boundary, while emphasizing the grasp between the various categories and various categories of internal
The intrinsic link between factors and integrity, integrity, and methods for one-sided and negative view stationary.
2.3
Boundary conditions boundaryconditions
Defining the role of seepage water hydraulic characteristics of the study area boundary, or defining the study area on the outside of the study area boundary.
2.4
Mathematical model identification recognitionofmathematicalmodel
In early known mathematical model, boundary conditions, the analysis of the groundwater system model inputs and outputs calculation results to achieve election
Select the correct parameters (and parameter identification), the correction calculation process has been established mathematical models and boundary conditions.
2.5
Mathematical model checking verificationofmathematicalmodel
According to the recognized early model parameters and known boundary conditions, the choice of a longer period of time calculated by entering the groundwater system model and
Output calculation, so calculated data and the actual observation data have the best fit, in order to further improve the accuracy of the mathematical model.
2.6
Hydrogeological conceptual model conceptualhydrogeologicalmodel
The actual nature of the aquifer boundary, internal structure, permeability, water features and recharge and discharge conditions such as generalized as easy mathematical
The basic model physics simulation.
2.7
Groundwater volume model groundwatervolumemodel
It can be described with the movement of groundwater flow simulation (water change) mathematical or physical model.
2.8
Groundwater Water Management Model groundwatervolumemanagementmodel
Water allocation for solving the groundwater and groundwater exploitation, water level control, and rational distribution of water engineering issues such as groundwater resources
Management Model.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of YS/T 3010-2012_English be delivered?Answer: Upon your order, we will start to translate YS/T 3010-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of YS/T 3010-2012_English with my colleagues?Answer: Yes. The purchased PDF of YS/T 3010-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|