HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (1 Nov 2025)

SN/T 2523-2021 English PDF

SN/T 2523: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
SN/T 2523-2021EnglishRFQ ASK 3 days [Need to translate] (Specifications for the Construction of Designated Quarantine Sites for Entry Aquatic Animals) Valid SN/T 2523-2021
SN/T 2523-2010English239 Add to Cart 3 days [Need to translate] Construction practice of temporary isolation facilities for entry fishes Obsolete SN/T 2523-2010

PDF similar to SN/T 2523-2021


Standard similar to SN/T 2523-2021

GB/T 20365   SN/T 1353   NY/T 909   SN/T 5663   SN/T 5671   SN/T 2515   

Basic data

Standard ID SN/T 2523-2021 (SN/T2523-2021)
Description (Translated English) (Specifications for the Construction of Designated Quarantine Sites for Entry Aquatic Animals)
Sector / Industry Commodity Inspection Standard (Recommended)
Classification of Chinese Standard B41
Classification of International Standard 65.020.30
Date of Issue 2021-11-22
Date of Implementation 2022-06-01
Older Standard (superseded by this standard) SN/T 2523-2010
Regulation (derived from) General Administration of Customs Announcement No. 97 of 2021
Issuing agency(ies) General Administration of Customs

SN/T 2523-2010: Construction practice of temporary isolation facilities for entry fishes

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Construction practice of temporary isolation facilities for entry fishes Exit inspection and quarantine industry standard book People's Republic of China Imported fish farm construction norms temporary isolation Issued on. 2010-03-02 2010-09-16 implementation People's Republic of China The State Administration of Quality Supervision, Inspection and Quarantine released

Foreword

This standard is proposed and managed by the National Certification and Accreditation Administration Committee. This standard was drafted. People's Republic of China Zhuhai Entry-Exit Inspection and Quarantine Bureau, People's Republic of China Jiangsu Entry-Exit Inspection and Quarantine Bureau, People's Republic of China Liaoning Province Exit Inspection and Quarantine. The main drafters of this standard. Zhou Xinpeng, Yang Haiyan, Ma Shanshan, Li Dongming, Fu Lei, Zheng Fan, Chen magnesium, Xi Xin, Chen Kun, CIVIL. This standard is the first release of the entry-exit inspection and quarantine industry standards. Imported fish farm construction norms temporary isolation

1 Scope

This standard specifies the entry of temporary quarantine fish farm construction requirements. This standard applies to the entry field of the construction of temporary isolation of fish, other aquatic animals also implementation.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB 11607 Fisheries water quality standards NY5051 free food freshwater aquaculture water quality NY5052 mariculture water quality pollution-free food

3 Location

3.1 no temporary isolation around the collection location (OIE) and the Ministry of Agriculture shall notify the provisions that shall be reported to the OIE water Raw animal disease incidence and prevalence. Around 3.2 temporary isolation within 1km range free field aquaculture farms (including seed farm), animal farms, slaughterhouses, fish processing plants, Veterinary hospital, farmers markets, hospitals and other places. 3.3 temporary isolation field ambient conditions conform to the requirements of animal epidemic prevention. 3.4 temporary isolation field has an independent water supply, water quality in line with GB 11607, NY5051, NY5052. The venue should have the necessary water supply, electricity facility.

4 facility requirements

4.1 Partition Temporary isolation venue layout should be reasonable, is divided into living and office area, isolation area, living area and the area of separation wall should be built. Area of separation should Including isolated ponds, observe the diseased fish pond, industrial equipment storage room, feed storage rooms, drug storage room, veterinary studios. Field and temporary isolation The outside world should be built with walls and disinfection channel. 4.2 channel walls 4.2.1 fence Four weeks should be solid fence temporary isolation field, the underground part of the wall of not less than 0.5m, above ground of not less than 1.5m, with the outside world Effect isolation. Wall rough walls, eaves to the top to be set down. 4.2.2 Channel 4.2.2.1 should be separately provided personnel, vehicles entering and leaving the isolated field channels isolation field entrance shall have disinfection facilities. 4.2.2.2 temporary isolation field channels should be located out of the vehicle pool disinfection, disinfection tank width and gate width, length not less than 4m, depth is not We are less than 0.2m. The staff, the channel has to hand disinfection facilities, pool disinfection (disinfection or pad). 4.2.3 guard room Temporary isolation field and out of the channel should be set guard room. 4.3 Warning signs Temporary isolation field access roads, etc. shall be provided "animal quarantine field, do not close" and other eye-catching warning signs.


Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information