|
US$629.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. SB/T 10683-2012: Technical requirements for management platform of meat and vegetable distribution traceability systems Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| SB/T 10683-2012 | English | 629 |
Add to Cart
|
5 days [Need to translate]
|
Technical requirements for management platform of meat and vegetable distribution traceability systems
| Valid |
SB/T 10683-2012
|
PDF similar to SB/T 10683-2012
Basic data | Standard ID | SB/T 10683-2012 (SB/T10683-2012) | | Description (Translated English) | Technical requirements for management platform of meat and vegetable distribution traceability systems | | Sector / Industry | Domestic Trade Industry Standard (Recommended) | | Classification of Chinese Standard | L70 | | Classification of International Standard | 35.240.60 | | Word Count Estimation | 24,217 | | Quoted Standard | GB/T 20272; GB/T 8566-2007; GB/T 8567-2006; GB/T 9387; GB 18030-2005; YD 5051-1997 | | Regulation (derived from) | ?Ministry of Commerce released on "frozen food production management practices" and other 60 domestic trade industry standard announcement; Industry Standard Filing Announcement 2012 No.5 (Total No.149) | | Issuing agency(ies) | Ministry of Commerce of the People's Republic of China | | Summary | This standard specifies the functional structure of the meat and vegetables at all levels of government retroactively flow back system management platform, logical relationship, data interface, transfer targets, platform design, safety and maintenance asp |
SB/T 10683-2012: Technical requirements for management platform of meat and vegetable distribution traceability systems ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements for management platform of meat and vegetable distribution traceability systems
ICS 35.240.60
L70
Record Number. 36237-2012
People's Republic of China domestic trade industry standards
Meat vegetables flow back system management platform technology requirements
Issued on. 2012-03-15
2012-06-01 implementation
People's Republic of China Ministry of Commerce released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 levels of logic between platforms 1
5 functional configuration 2
6 Data Interface Requirements 3
7 design requirements 4
8 6 Safety requirements
7 9 Maintenance Requirements
Appendix A (normative) Urban management platform retrospective view format 8
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is proposed and managed by the People's Republic of China Ministry of Commerce.
This standard is mainly drafted by. flow of Productivity Promotion Center.
The main drafters of this standard. Liu Pu together at dawn, Wang Deli, Yuanming Song, Cheng Cheng, Gao, floating babe, Panlan Yun, Hui Ying, Song Cheng, Xu Xinfu.
Meat vegetables flow back system management platform technology requirements
1 Scope
This standard specifies the functional configuration, the logic of meat vegetables flow back system at all levels of government traceability management platform, data interfaces, communication
Output indicators, platform design, safety, and maintenance of the technical requirements.
This standard applies to meat vegetables flow back system and a central management platform retroactive retroactive urban management platform construction and maintenance.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 20272 information security technologies operating system security technical requirements
GB/T 8566-2007 Information technology - Software life cycle processes
GB/T 8567-2006 computer software documentation
GB/T 9387 Information technology - Open Systems Interconnection - Basic Reference Model
GB 18030-2005 Information technology - Chinese coded character set
YD5051-97 local network communication line project acceptance
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Central traceability management platform centraltraceabilitymanagementplatform
An important part of the national meat vegetables flow back system, bringing together cities meat vegetables circulation business entities information distribution process letter
Information, testing information, and support cross-regional chain traceability information synthesis, emergency incident management, information utilization, performance evaluation and other urban work
Large-scale applications.
3.2
Urban traceability management platform citytraceabilitymanagementplatform
Collection of city business entities meat vegetables circulation of information, circulation of information, support information traceability chain synthesis and utilization of information, emergency
Event management, work flow of node assessment, public information services and other work applications, according to uniform data transfer protocol, bringing together the circulation section
Point retroactive subsystem information, call center management platform retrospective data synchronization interface, upload the cities vegetables meat traceability information to a central traceability
Management platform.
4 logic levels of platforms
Central traceability management platform is received by the city traceability management platform to upload business entities filing information with meat and vegetables distribution process information.
Central traceability management platform taking into account the capabilities of provincial management platform, open platform provincial window, giving the provincial commerce department scheduling and supervision
Permissions province city traceability system running status. Urban traceability management platform receives the flow of each node retroactive subsystem upload related letter
Interest rates, and to upload information retroactive central management platform.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SB/T 10683-2012_English be delivered?Answer: Upon your order, we will start to translate SB/T 10683-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of SB/T 10683-2012_English with my colleagues?Answer: Yes. The purchased PDF of SB/T 10683-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|