|
US$399.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. LY/T 2647-2016: Technical regulations for passageway greening Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| LY/T 2647-2016 | English | 399 |
Add to Cart
|
4 days [Need to translate]
|
Technical regulations for passageway greening
| Valid |
LY/T 2647-2016
|
PDF similar to LY/T 2647-2016
Basic data | Standard ID | LY/T 2647-2016 (LY/T2647-2016) | | Description (Translated English) | Technical regulations for passageway greening | | Sector / Industry | Forestry Industry Standard (Recommended) | | Classification of Chinese Standard | B60 | | Word Count Estimation | 17,125 | | Date of Issue | 2016-07-27 | | Date of Implementation | 2016-12-01 | | Regulation (derived from) | State Forestry Administration Announcement No.17 of 2016; Industry Standard Announcement No.16 of 2016 (No.204) | | Issuing agency(ies) | State Forestry Administration |
LY/T 2647-2016: Technical regulations for passageway greening---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Technical specification for channel greening)
ICS 65.020.40
B60
People's Republic of China Forestry Industry Standard
Channel greening technical regulations
Released on.2016-07-27
Implementation of.2016-12-01
State Forestry Administration released
Content
Foreword I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General 2
5 road greening 3
6 River (channel) road greening 8
7 slope greening 10
8 job design 12
9 Technical files 12
Appendix A (informative appendix) Table of main plants in the channel greening sub-sector 13
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the Afforestation and Greening Management Department of the State Forestry Administration (National Greening Committee Office).
This standard is under the jurisdiction of the National Afforestation Standardization Technical Committee (SAC/TC385).
This standard was drafted. State Forestry Administration Survey Planning and Design Institute, State Forestry Administration Afforestation and Greening Management Division.
The main drafters of this standard. Tang Xiaoping, Zhao Liangping, Weng Guoqing, Wang Enzhen, Huang Zhilin, Niu Mu, Wang Hongchun, Wang Hezhi, Zhou Jiemin, Yan Fei,
Bian Ce, Kong Qingyun.
Channel greening technical regulations
1 Scope
This standard specifies the technical requirements for greening of railways, highways, rivers, channels, etc.
This standard applies to the nationwide channel greening.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 15776 Afforestation Technical Regulations
GB/T 18337.3 Technical regulations for the construction of ecological public welfare forests
GB/T 50090 railway line design specification
GB/T 50330 Technical Specifications for Building Slope Engineering
GB/T 50817 farmland shelterbelt engineering design specification
CJJ75 Urban Road Greening Planning and Design Specification
LY/T 1607 afforestation operation design procedure
JTGB 01 Highway Engineering Technical Standard
JTGH10 Highway Maintenance Technical Specification
TB10035 railway special subgrade design specification
TG/GW110 Railway Forestry Technical Management Rules
Railway Construction (2013) No. 94 Railway Project Green Passage Construction Guide
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Channel greening passagewaygreening
In the railways, highways and on both sides, as well as on both sides of the river and on both sides of the channel, to protect the ecological safety and improvement of railways, highways, river banks and canals.
Ecological landscape is the main goal of afforestation.
3.2
Road greening roadgreening
In order to protect road ecological security, restore and improve the ecological landscape along the road as the main purpose, along roads, railways and other roads along and on both sides
Afforestation and greening within a certain range. Among them, highway refers to expressway, primary road, secondary road, tertiary road and fourth-grade road. Railway indicator
Class I railway, Class II railway, Class III railway and Class IV railway divided by GB/T 50090. Road greening includes roadbed greening and slope
Greening and greening outside the line.
3.3
River (channel) road greening bufferzonegreening
In order to prevent channels, river banks from scouring and collapse, and to reduce soil erosion in the waterfront, fixed canals, etc., the main purpose is on the banks of the river (channel).
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of LY/T 2647-2016_English be delivered?Answer: Upon your order, we will start to translate LY/T 2647-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of LY/T 2647-2016_English with my colleagues?Answer: Yes. The purchased PDF of LY/T 2647-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|