HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (1 Nov 2025)

LY/T 2153-2013 English PDF

US$469.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
LY/T 2153-2013: Forest engineering. Symbols for planning and design of timber logistics
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
LY/T 2153-2013English469 Add to Cart 3 days [Need to translate] Forest engineering. Symbols for planning and design of timber logistics Valid LY/T 2153-2013

PDF similar to LY/T 2153-2013


Standard similar to LY/T 2153-2013

GB/T 19630   NY/T 1420   GB/T 19495.7   LY/T 3032   LY/T 2105   LY/T 2082.1   

Basic data

Standard ID LY/T 2153-2013 (LY/T2153-2013)
Description (Translated English) Forest engineering. Symbols for planning and design of timber logistics
Sector / Industry Forestry Industry Standard (Recommended)
Classification of Chinese Standard B04
Classification of International Standard 65.020.99
Word Count Estimation 18,163
Regulation (derived from) State Forestry Bulletin 2013 No. 8; industry standard filing Notice No. 5 of 2013 (No. 161 overall)
Issuing agency(ies) State Forestry Administration
Summary This standard specifies: timber logistics planning and design Terminology and definitions, timber warehouse (lumberyard) loading and unloading process symbols and process layout symbols drawing requirements, gives examples of various symbols and symbols b

LY/T 2153-2013: Forest engineering. Symbols for planning and design of timber logistics

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Forest engineering.Symbols for planning and design of timber logistics ICS 65.020.99 B04 People's Republic of China forestry industry standards Forest engineering timber logistics planning design symbol 2013-03-15 released 2013-07-01 Implementation State Forestry Administration released

Foreword

This standard was drafted in accordance with the provisions of GB/T 1.1-2009. This standard is proposed and managed by the National Forest Engineering Standardization Technical Committee (SAC/TC362). This standard is drafted by. Engineering College of Northeast Forestry University. Participated in the drafting of this standard. Heilongjiang Forestry Design and Research Institute. The main drafters of this standard. Xuheng Qin, Lu Zhongda, Wang Haibin, An Lihua, Sun surgery hair, Xu Tan. Forest engineering timber logistics planning design symbol

1 Scope

This standard specifies the terms and definitions of timber logistics planning and design, timber warehouse (storage yard) loading and unloading transport process symbols and engineering Arts layout symbols (hereinafter referred to as "symbols") of the drawing requirements, given the symbolic examples and based on process symbols and layout symbols drawn typical Process layout and process flow chart. This standard applies to forest and urban timber warehouse (yard), port timber transhipment, railway timbering, etc. planning and design, production, Section Research, teaching and academic exchanges in a variety of flow charts, layout drawing can also refer to the use of.

2 Terms and definitions

The following terms and definitions apply to this document. 2.1 Technologicalprocess Wood (original strip or wood) in accordance with certain procedures, along a certain direction of continuous operation, and the formation of a whole assembly line process. 2.2 Technological layout technologicallayout The layout of timber production machinery, equipment, roads and timber storage sites of timber warehouses or yard in accordance with the production process And arrangements. 2.3 Woodflow timberflow Mainly refers to the log or original stream as a fluid flow, with a starting point, the end point and direction. 2.4 Vortex vortexflow At a certain process in the entire process, part of the wood flow from the mainstream but eventually returned to the mainstream of the phenomenon, with shunt and confluence characteristic.

3 symbol requirements

3.1 Symbols shall be easily identifiable and drawn by forest engineering professionals and timber logistics engineers. 3.2 Symbols should be briefly expressed the shape of the object, the characteristics of facilities and the characteristics of the structure of the object, its position can be changed as needed, the size of the symbol No provisions, use should be based on the actual need to choose the appropriate ratio. 3.3 layout symbols should be appropriate facilities and equipment to simplify the image, process symbols are different combinations of the abstract process, does not require the graphics The objects correspond exactly and the number of facilities can be determined as needed. 4 timber warehouse (storage yard) handling process symbol Wood warehouse (storage yard) Handling process symbol shown in Table 1.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of LY/T 2153-2013_English be delivered?

Answer: Upon your order, we will start to translate LY/T 2153-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of LY/T 2153-2013_English with my colleagues?

Answer: Yes. The purchased PDF of LY/T 2153-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information